Less Ads, More Data, More Tools Register for FREE

Pin to quick picksAnglesey Mining Regulatory News (AYM)

Share Price Information for Anglesey Mining (AYM)

Share Price is delayed by 15 minutes
Get Live Data
5.10    0.25 (5.15%)
Bid:
5.00
Ask:
5.20
Spread: 0.20 (4.00%)
Market Cap: £3.31m
AYM Live PriceLast checked at - London Stock Exchange

Intraday Anglesey Mining Share Chart

Update on Parys Mountain Optimisation Study

22 Jan 2019 07:00

ANGLESEY MINING PLC - Update on Parys Mountain Optimisation Study

ANGLESEY MINING PLC - Update on Parys Mountain Optimisation Study

PR Newswire

London, January 21

Update on Parys Mountain Optimisation Study

Anglesey Mining plc (β€œAYM”) is pleased to report on progress of the Optimisation Study being carried out on its Parys Mountain copper, zinc, lead, gold and silver project, located on the island of Anglesey in North Wales.Β The Optimisation Study is being conducted under a Project Development and Cooperation Agreement entered into with QME Mine Engineering Services (β€œQME”) which is based in Navan, County Meath, Ireland. QME is carrying out this study at its own expense in return for which AYM has agreed to grant QME various rights and options relating to the future development of Parys Mountain as detailed in the AYM RNS of 26th November 2018.Β QME has assembled a team of qualified and experienced geologists and engineers particularly for this project. The QME team has conducted two workshops with AYM since the project commenced in late November, including a site visit to Parys Mountain earlier this month.Β QME is examining a number of development scenarios for Parys Mountain which include the initial development of the mine from a new decline, with first production from the White Rock Zone, and alternatively initial development through refurbishing the existing Morris Shaft, with early production from the higher value though deeper Engine Zone. A number of sub-alternatives are also being considered.Β Anglesey Chief Executive, Bill Hooley, said:Β "I am very pleased with the progress that QME has made in the short period since work commenced on this project in November. I am also greatly encouraged by the high-quality team that has been assembled and particularly by the enthusiasm and vigour with which each member of that team is approaching the production of an optimised and viable development plan. I believe that the final output from this Optimisation Study will do much to enhance the value and development of Parys Mountain.” In order to fully evaluate these alternatives QME has carried out a detailed validation and review of the wire-frame models of the various orebodies and zones that will form part of the new production plans. QME has also examined the classifications of resources utilised previously and at this point in time believe that it will be possible to increase the tonnages available for production when these reviews are combined with updated costing models. Work will continue on the wire-frame review and is expected to lead to development of alternative mine production plans in the coming weeks.Β QME has significant experience in mine development and operation through its involvement in major mining activities in Ireland and elsewhere. As its understanding of the requirements for development and production at Parys Mountain has evolved since November, QME has commenced the compilation of a detailed cost data-base to be utilised in examining each of the alternative scenarios. This will ensure that the comparative financial models to be produced for each option will be consistent and current. It is expected that compilation of this data-base will be completed to tie in with the completion of the alternative mine production plans as noted above.Β The next major piece of work for QME, and which follows directly from the site visit earlier this month, will be the development of plans to reopen and utilise the 300 metre deep Morris Shaft as a potential early access option to the higher value Engine Zone. It is believed that this shaft, though currently flooded to near surface, is in reasonable condition and could be dewatered and rehabilitated relatively easily. In addition to the shaft itself, QME has examined the headframe and winder on site and will consider if and how best this existing equipment can be utilised for the shaft reopening exercise. Development of the logistics and costing of this possible approach will be incorporated into the various alternative models as information becomes available.Β The original timetable was for the entire Optimisation Study to be completed by the end of June 2019 and this target still appears to be quite achievable. Parys Mountain - 2017 Scoping StudyIn July 2017 a new Scoping Study on the Parys Mountain, was prepared by Micon International Limited and Fairport Engineering Ltd. The Scoping Study envisaged a mining rate of 1,000 tonnes per day, to produce an average annual output of 14,000 tonnes of zinc concentrate at 57% Zn, 7,200 tonnes of lead concentrate at 52% Pb and 4,000 tonnes of copper concentrate at 25% Cu, over an initial mine life of eight years.The QME Optimisation Study will build on the results of the Scoping Study which will be used as a Base Case for comparison purposes, and it is hoped and anticipated that the Study will result in a development plan that both increases the mine life beyond the eight years, as well as providing improved financial results.About QMEQME Limited,Β based in Navan, County Meath, Ireland, supplies services to the mining industry worldwide. QME is involved in various mining projects in the fields of both mine development and mining operations. QME also supplies new and re-manufactured underground and open pit mining equipment to the international mining industry worldwide and has carried out both large and small scale underground mine development contracts for a number of clients including New Boliden Tara Mines at Navan Ireland, Dalradian Gold Limited at Curraghinalt Northern Ireland, and Lafarge Holcim at Glensanda Scotland.Β About Anglesey Mining plcAnglesey is carrying out feasibility and development work at its 100% owned Parys Mountain copper-zinc-lead deposit in North Wales, UK with a reported resource of 2.1 million tonnes at 6.9% combined base metals in the indicated category and 4.1 million tonnes at 5.0% combined base metals in the inferred category.Following a recent refinancing, Anglesey now holds an 8.7% interest, (increased from 6%), and management rights to the Grangesberg Iron project in Sweden, together with a right of first refusal to increase its interest by a further 50.1%. Anglesey also holds 12% of Labrador Iron Mines Holdings Limited which holds direct shipping iron ore deposits in Labrador and Quebec.Β For further information, please contact:Β Bill Hooley, Chief Executive +44 (0)7785 572517Danesh Varma, Finance Director +44 (0)7740 932766

Date   Source Headline
2nd Jun 20267:00 amPRNChange of Nominated Adviser
1st Jun 20267:00 amPRNChange of Non-Executive Directors
26th May 20267:02 amPRNOperational Update
26th May 20267:00 amPRNAppointment of CEO
26th May 20267:00 amPRNAppointment of CEO
6th May 20267:00 amPRNDirectorate changes
25th Mar 20263:59 pmPRNHolding(s) in Company
9th Mar 20267:00 amPRNPlacing and Subscription to raise approximately £680,000 and Appointment of AlbR Capital as Joint Corporate Broker
3rd Mar 202612:48 pmPRNHolding(s) in Company
26th Feb 202611:48 amPRNExercising of Energold Warrants
25th Feb 20267:00 amPRNCompletion of £4 million Debt Settlement Agreement
12th Feb 202611:22 amPRNResult of Annual General Meeting - Capital Reorganisation Approved
19th Jan 20267:00 amPRNProposed Capital Reorganisation, Proposed Amendment to the Articles of Association and Notice of AGM.
22nd Dec 20258:00 amRNSHolding(s) in Company
22nd Dec 20258:00 amPRNHolding(s) in Company
22nd Dec 20257:00 amRNSHalf yearly report for the six months to 30 September 2025
22nd Dec 20257:00 amPRNHalf yearly report for the six months to 30 September 2025
11th Dec 20251:08 pmPRNCompletion of Warrant Offering
5th Dec 20257:00 amPRNDebt Settlement and Disposals; Investment by Energold Minerals; Additions to Board
30th Oct 202511:13 amPRNResults of General Meeting
23rd Oct 20259:44 amPRNAdjournment of General Meeting
30th Sep 202512:04 pmPRNAnglesey Mining plc - Annual Report 2025
26th Sep 20257:00 amPRNConditional Equity Financing Facility -  Proposed Capital Reorganisation - Notice of General Meeting
19th Aug 20259:16 amPRNHolding(s) in Company
15th Aug 20252:30 pmPRNCorporate Update
30th Jul 20257:00 amPRNAnglesey Mining Announces Signing of Letter of Intent to Progress High-Density Fluid Hydro-Power Energy Storage Project
9th May 20252:23 pmPRNIssuance of Share Options to Directors and Employees
8th Apr 20257:00 amPRNAnglesey Mining Announces Publication of a Conceptual Study of a High-Density Fluid Hydro-Power Energy Storage Project
18th Feb 20257:00 amPRNAnglesey Mining plc and RheEnergise Partner to Explore Underground Energy Storage at Parys Mountain Mine, through the Rehabilitation of the Existing 300m Deep Morris Shaft.
7th Jan 20257:00 amPRNParys Mountain Mine Environmental Impact Assessment (EIA) Scoping Report Approved
18th Dec 20247:00 amPRNHalf-year Report
5th Dec 20247:00 amPRNBoard Changes
4th Dec 20247:00 amPRNUK 2024 Criticality Assessment
11th Nov 202411:15 amPRNIssue of Equity
8th Nov 202412:28 pmPRNResult of AGM
29th Oct 20243:11 pmPRNInformation received from statutory and specialist consultees regarding the Parys Mountain Mine Environmental Impact Assessment Scoping Report
4th Oct 202412:05 pmPRNHolding(s) in Company
30th Sep 20249:17 amPRNAnnual Report 2024
25th Sep 20247:00 amPRNFundraise to raise £220,000
19th Sep 20244:22 pmPRNHolding(s) in Company
9th Sep 20247:00 amPRNDirectorate Change
27th Aug 202411:57 amPRNNorthern Copper Zone and Garth Daniel Zone, update
16th Aug 20247:00 amPRNSubmission of Parys Mountain Mine Environmental Impact Assessment Scoping Report
15th Jul 20241:08 pmPRNChange of Broker
28th Jun 20249:56 amPRNResult of Placing and Subscription
28th Jun 20247:00 amPRNProposed Placing and Subscription to raise approximately £415,000
13th May 20247:00 amPRNFurther drilling results confirm scale of Northern Copper Zone at Parys Mountain
18th Apr 202411:25 amPRNBlocklisting - Interim Review
18th Apr 20247:00 amPRNAppointment of new CEO
13th Mar 20247:00 amPRNFurther drilling results confirm scale of Northern Copper Zone at Parys Mountain

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.