If you would like to learn more about future focusIR related events and roundtables, please submit your details here

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksAnglesey Mining Regulatory News (AYM)

Share Price Information for Anglesey Mining (AYM)

Share Price is delayed by 15 minutes
Get Live Data
4.25    0.00 (0.00%)
Bid:
4.00
Ask:
4.50
Spread: 0.50 (12.50%)
Market Cap: £2.79m
AYM Live PriceLast checked at - London Stock Exchange

Intraday Anglesey Mining Share Chart

Update on Parys Mountain Optimisation Study

22 Jan 2019 07:00

ANGLESEY MINING PLC - Update on Parys Mountain Optimisation Study

ANGLESEY MINING PLC - Update on Parys Mountain Optimisation Study

PR Newswire

London, January 21

Update on Parys Mountain Optimisation Study

Anglesey Mining plc (“AYM”) is pleased to report on progress of the Optimisation Study being carried out on its Parys Mountain copper, zinc, lead, gold and silver project, located on the island of Anglesey in North Wales. The Optimisation Study is being conducted under a Project Development and Cooperation Agreement entered into with QME Mine Engineering Services (“QME”) which is based in Navan, County Meath, Ireland. QME is carrying out this study at its own expense in return for which AYM has agreed to grant QME various rights and options relating to the future development of Parys Mountain as detailed in the AYM RNS of 26th November 2018. QME has assembled a team of qualified and experienced geologists and engineers particularly for this project. The QME team has conducted two workshops with AYM since the project commenced in late November, including a site visit to Parys Mountain earlier this month. QME is examining a number of development scenarios for Parys Mountain which include the initial development of the mine from a new decline, with first production from the White Rock Zone, and alternatively initial development through refurbishing the existing Morris Shaft, with early production from the higher value though deeper Engine Zone. A number of sub-alternatives are also being considered. Anglesey Chief Executive, Bill Hooley, said: "I am very pleased with the progress that QME has made in the short period since work commenced on this project in November. I am also greatly encouraged by the high-quality team that has been assembled and particularly by the enthusiasm and vigour with which each member of that team is approaching the production of an optimised and viable development plan. I believe that the final output from this Optimisation Study will do much to enhance the value and development of Parys Mountain.” In order to fully evaluate these alternatives QME has carried out a detailed validation and review of the wire-frame models of the various orebodies and zones that will form part of the new production plans. QME has also examined the classifications of resources utilised previously and at this point in time believe that it will be possible to increase the tonnages available for production when these reviews are combined with updated costing models. Work will continue on the wire-frame review and is expected to lead to development of alternative mine production plans in the coming weeks. QME has significant experience in mine development and operation through its involvement in major mining activities in Ireland and elsewhere. As its understanding of the requirements for development and production at Parys Mountain has evolved since November, QME has commenced the compilation of a detailed cost data-base to be utilised in examining each of the alternative scenarios. This will ensure that the comparative financial models to be produced for each option will be consistent and current. It is expected that compilation of this data-base will be completed to tie in with the completion of the alternative mine production plans as noted above. The next major piece of work for QME, and which follows directly from the site visit earlier this month, will be the development of plans to reopen and utilise the 300 metre deep Morris Shaft as a potential early access option to the higher value Engine Zone. It is believed that this shaft, though currently flooded to near surface, is in reasonable condition and could be dewatered and rehabilitated relatively easily. In addition to the shaft itself, QME has examined the headframe and winder on site and will consider if and how best this existing equipment can be utilised for the shaft reopening exercise. Development of the logistics and costing of this possible approach will be incorporated into the various alternative models as information becomes available. The original timetable was for the entire Optimisation Study to be completed by the end of June 2019 and this target still appears to be quite achievable. Parys Mountain - 2017 Scoping StudyIn July 2017 a new Scoping Study on the Parys Mountain, was prepared by Micon International Limited and Fairport Engineering Ltd. The Scoping Study envisaged a mining rate of 1,000 tonnes per day, to produce an average annual output of 14,000 tonnes of zinc concentrate at 57% Zn, 7,200 tonnes of lead concentrate at 52% Pb and 4,000 tonnes of copper concentrate at 25% Cu, over an initial mine life of eight years.The QME Optimisation Study will build on the results of the Scoping Study which will be used as a Base Case for comparison purposes, and it is hoped and anticipated that the Study will result in a development plan that both increases the mine life beyond the eight years, as well as providing improved financial results.About QMEQME Limited, based in Navan, County Meath, Ireland, supplies services to the mining industry worldwide. QME is involved in various mining projects in the fields of both mine development and mining operations. QME also supplies new and re-manufactured underground and open pit mining equipment to the international mining industry worldwide and has carried out both large and small scale underground mine development contracts for a number of clients including New Boliden Tara Mines at Navan Ireland, Dalradian Gold Limited at Curraghinalt Northern Ireland, and Lafarge Holcim at Glensanda Scotland. About Anglesey Mining plcAnglesey is carrying out feasibility and development work at its 100% owned Parys Mountain copper-zinc-lead deposit in North Wales, UK with a reported resource of 2.1 million tonnes at 6.9% combined base metals in the indicated category and 4.1 million tonnes at 5.0% combined base metals in the inferred category.Following a recent refinancing, Anglesey now holds an 8.7% interest, (increased from 6%), and management rights to the Grangesberg Iron project in Sweden, together with a right of first refusal to increase its interest by a further 50.1%. Anglesey also holds 12% of Labrador Iron Mines Holdings Limited which holds direct shipping iron ore deposits in Labrador and Quebec. For further information, please contact: Bill Hooley, Chief Executive +44 (0)7785 572517Danesh Varma, Finance Director +44 (0)7740 932766

Date   Source Headline
30th Jul 20143:27 pmPRNAnnual Financial Report
2nd Jul 20143:38 pmPRNProjects update; LIM releases year end financials
29th May 20147:00 amPRNAcquisition of controlling interest in Grangesberg Iron
1st Apr 20145:00 pmPRNBlocklisting - Interim Review
4th Dec 201311:10 amPRNLIM completes third operating year
25th Nov 20137:00 amPRNHalf-yearly Report 30 September 2013
15th Nov 201311:37 amPRNLabrador Iron Mines Reports Second Quarter Results
7th Oct 20137:00 amPRNBlocklisting - Interim Review
25th Sep 20137:34 amPRNResult of AGM
19th Sep 20131:09 pmPRNLIM - Annual General Meeting
18th Sep 201311:23 amPRNLIM finalises joint venture agreement with Tata
15th Aug 201311:12 amPRNInterim Management Statement and LIM results
1st Aug 201310:26 amPRNDirectorate Change
23rd Jul 20133:02 pmPRNAnnual Financial Report
3rd Jul 201311:15 amPRNLIM March 2013 year-end results and operational update
27th Jun 20137:51 amPRNLIM reschedules conference call
24th Jun 201311:03 amPRNLIM - Elizabeth taconite resource
7th Jun 201312:08 pmPRNLIM First iron ore shipments of 2013
23rd May 201312:25 pmPRNLIM – 33% increase in year-end mineral resource
14th May 201311:13 amPRNLIM signs new sales and off-take agreements
8th Apr 20131:49 pmPRNHolding(s) in Company
2nd Apr 201312:57 pmPRNBlocklisting - Interim Review
12th Mar 201311:13 amPRNLIM arrangement with Tata Steel Minerals Canada
15th Feb 201312:19 pmPRNIMS and LIM third quarter results
13th Feb 20132:10 pmPRNLIM completes C$29 million equity financing
21st Jan 20137:00 amPRNLIM equity financing
18th Jan 201310:44 amPRNLIM Announces Unit Equity Financing
17th Jan 20138:58 amPRNLIM announces equity financing
3rd Jan 20134:40 pmRNSSecond Price Monitoring Extn
3rd Jan 20134:35 pmRNSPrice Monitoring Extension
31st Dec 201212:40 pmRNSSecond Price Monitoring Extn
31st Dec 201212:35 pmRNSPrice Monitoring Extension
18th Dec 201212:05 pmPRNLIM Completes 2012 Exploration Program
30th Nov 20127:00 amPRNNew JORC compliant resource estimate for Parys Mountain
26th Nov 20127:00 amPRNAnglesey half yearly report and management statement
21st Nov 20124:39 pmPRNLIM appoints new CFO and director
15th Nov 201212:07 pmPRNLIM second quarter results
6th Nov 20121:48 pmPRNLIM C$30 million financing - Anglesey subscribes C$1.5m
17th Oct 20124:40 pmRNSSecond Price Monitoring Extn
17th Oct 20124:35 pmRNSPrice Monitoring Extension
2nd Oct 20127:00 amPRNLIM announces C$30 million equity financing
24th Sep 20124:40 pmRNSSecond Price Monitoring Extn
24th Sep 20124:35 pmRNSPrice Monitoring Extension
14th Sep 20127:00 amPRNLIM AGM and Operations Update
11th Sep 20122:15 pmPRNDirector/PDMR Shareholding
7th Sep 201212:20 pmPRNResult of AGM held 6 Sept 12
4th Sep 201211:09 amPRNLIM Operations Update and Outlook
15th Aug 201212:09 pmPRNIMS and LIM first quarter results
10th Aug 201212:15 pmPRNLIM new rail feasibility study
1st Aug 201210:44 amPRNTotal Voting Rights

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.