The latest Investing Matters Podcast episode featuring Jeremy Skillington, CEO of Poolbeg Pharma has just been released. Listen here.

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksAnglesey Mining Regulatory News (AYM)

Share Price Information for Anglesey Mining (AYM)

London Stock Exchange
Share Price is delayed by 15 minutes
Get Live Data
Share Price: 1.40
Bid: 1.30
Ask: 1.50
Change: 0.00 (0.00%)
Spread: 0.20 (15.385%)
Open: 1.40
High: 1.40
Low: 1.40
Prev. Close: 1.40
AYM Live PriceLast checked at -

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

Grängesberg Iron Ore Pre-Feasibility Study Commenced

9 Dec 2021 07:00

ANGLESEY MINING PLC - Grängesberg Iron Ore Pre-Feasibility Study Commenced

ANGLESEY MINING PLC - Grängesberg Iron Ore Pre-Feasibility Study Commenced

PR Newswire

London, December 8

Trading Symbol

LSE: AYM

9 December 2021

Anglesey Mining plc

(“Anglesey” or “the Company”)

Grängesberg Iron Ore Pre-Feasibility Study Commenced

Anglesey Mining plc (LSE:AYM), the UK minerals development company, is pleased to provide the following update on the Grängesberg Iron Ore Project in Sweden.

Highlights

Anglesey recently engaged Micon International to undertake an update on the 2012 Pre-Feasibility Study (PFS) to investigate the re-opening of the Grängesberg Iron Ore Project During the life of the original operation, Grängesberg produced 180Mt of iron ore. Prior to closure in 1989, when the iron ore price was trading around US$30/t, the Grängesberg mine was the third largest iron ore mine in Sweden and employed over 1,500 people. The Swedish Mining Inspectorate granted a mining for the project concession in 2013, which is valid for a minimum of 25 years. The current work programme is intended to provide an update on the PFS completed in 2012, which demonstrated an extremely robust development option based on the following parameters: Annual production of 5.3Mtpa of ore, producing 2.5Mtpa of >68% Fe concentrate, with a mine life of 16-years Probable reserves of 84Mt at 37.2% Fe derived from 148Mt of Indicated and Inferred resources

Jo Battershill, Chief Executive of Anglesey Mining, commented: “The Grängesberg mine provides significant exposure to iron ore for Anglesey Mining. The project has all the attributes of a globally significant iron ore deposit. It has a large resource, the ability to produce a high-grade iron ore concentrate and is situated adjacent to existing rail infrastructure with a direct link to the port of Oxelösund on the Baltic Sea.

The worldwide movement towards decarbonisation is resulting in manufacturers seeking to minimise their carbon footprint. The production of a >68% Fe concentrate in Europe will afford local steelmakers the opportunity to shorten their supply chains and lower overall emissions. The commissioning of the HYBRIT fossil fuel free steel plant in Sweden already demonstrates the huge progress being made with regard to ‘green steel’ in the European region. Additionally, we note with interest the recent media reports suggesting the new Prime Minister of Sweden sees the need for more mines in the country.

There are a number of companies listed on the London, Toronto and Nordic exchanges with directly comparable projects that clearly demonstrate the potential upside to Anglesey Mining shareholders. The completion of the updated PFS will be an important step towards unlocking the value of this deposit. We very much look forward to sharing the results of this study with the market in the new year.”

Grängesberg Iron Ore Project – Updated Pre-Feasibility Study

Anglesey owns a 20% stake in the Grängesberg Iron Ore Project, located 230km northwest of Stockholm in Sweden. The Company has recently appointed Micon International to commence an update of the original PFS for Grängesberg, completed in 2012. The results of the updated PFS will be important in guiding the Anglesey Board in the options to bring the Grangesberg Mine to production and on its Right of First Refusal over an additional 50.1% of the project.

The Grängesberg project is a substantial iron ore asset located in a very favourable jurisdiction and, prior to its closure in 1989, the mine produced around 180Mt of iron ore. Remaining resources were estimated at 148Mt at 41.3% Fe in an NI 43-101 Technical Report completed by Roscoe Postle Associates Inc in 2014.

ResourceTonnesFe
Category(Mt)(%)
GrängesbergIndicated115.240.2
Inferred33.145.1
Total148.341.3

Diamond drilling has confirmed that the mineralisation at Grängesberg remains of mineable widths at a depth of 1,200m below surface. Historical geophysical work suggests the orebody may be open down to a depth of 1,700m.

The Pre-Feasibility Study completed in 2012 demonstrated a probable reserve of 84Mt, which at a proposed mining rate of 5.3Mtpa, generated a mine life of more than 16-years. Historical production demonstrated that beneficiation of the ore produces a very high-grade concentrate (>68% Fe).

About Anglesey Mining plcAnglesey Mining is listed on the London Stock Exchange and currently has 248,070,732 ordinary shares on issue.

Anglesey is developing its 100% owned Parys Mountain copper-zinc-lead deposit in North Wales, UK with a 2020 reported resource of 5.2 million tonnes at 4.3% combined base metals in the Indicated category and 11.7 million tonnes at 2.8% combined base metals in the Inferred category. 

Anglesey holds an almost 20% interest, and management rights to the Grangesberg Iron project in Sweden, together with a right of first refusal to increase its interest by a further 50.1%. Anglesey also holds 12% of Labrador Iron Mines Holdings Limited which holds direct shipping iron ore deposits in Labrador and Quebec.

 

For further information, please contact:

Jo Battershill, Chief Executive +44 (0)7540 366000

John Kearney, Chairman + 1 416 362 6686

LEI: 213800X8BO8EK2B4HQ71

Date   Source Headline
30th Jul 20143:27 pmPRNAnnual Financial Report
2nd Jul 20143:38 pmPRNProjects update; LIM releases year end financials
29th May 20147:00 amPRNAcquisition of controlling interest in Grangesberg Iron
1st Apr 20145:00 pmPRNBlocklisting - Interim Review
4th Dec 201311:10 amPRNLIM completes third operating year
25th Nov 20137:00 amPRNHalf-yearly Report 30 September 2013
15th Nov 201311:37 amPRNLabrador Iron Mines Reports Second Quarter Results
7th Oct 20137:00 amPRNBlocklisting - Interim Review
25th Sep 20137:34 amPRNResult of AGM
19th Sep 20131:09 pmPRNLIM - Annual General Meeting
18th Sep 201311:23 amPRNLIM finalises joint venture agreement with Tata
15th Aug 201311:12 amPRNInterim Management Statement and LIM results
1st Aug 201310:26 amPRNDirectorate Change
23rd Jul 20133:02 pmPRNAnnual Financial Report
3rd Jul 201311:15 amPRNLIM March 2013 year-end results and operational update
27th Jun 20137:51 amPRNLIM reschedules conference call
24th Jun 201311:03 amPRNLIM - Elizabeth taconite resource
7th Jun 201312:08 pmPRNLIM First iron ore shipments of 2013
23rd May 201312:25 pmPRNLIM – 33% increase in year-end mineral resource
14th May 201311:13 amPRNLIM signs new sales and off-take agreements
8th Apr 20131:49 pmPRNHolding(s) in Company
2nd Apr 201312:57 pmPRNBlocklisting - Interim Review
12th Mar 201311:13 amPRNLIM arrangement with Tata Steel Minerals Canada
15th Feb 201312:19 pmPRNIMS and LIM third quarter results
13th Feb 20132:10 pmPRNLIM completes C$29 million equity financing
21st Jan 20137:00 amPRNLIM equity financing
18th Jan 201310:44 amPRNLIM Announces Unit Equity Financing
17th Jan 20138:58 amPRNLIM announces equity financing
3rd Jan 20134:40 pmRNSSecond Price Monitoring Extn
3rd Jan 20134:35 pmRNSPrice Monitoring Extension
31st Dec 201212:40 pmRNSSecond Price Monitoring Extn
31st Dec 201212:35 pmRNSPrice Monitoring Extension
18th Dec 201212:05 pmPRNLIM Completes 2012 Exploration Program
30th Nov 20127:00 amPRNNew JORC compliant resource estimate for Parys Mountain
26th Nov 20127:00 amPRNAnglesey half yearly report and management statement
21st Nov 20124:39 pmPRNLIM appoints new CFO and director
15th Nov 201212:07 pmPRNLIM second quarter results
6th Nov 20121:48 pmPRNLIM C$30 million financing - Anglesey subscribes C$1.5m
17th Oct 20124:40 pmRNSSecond Price Monitoring Extn
17th Oct 20124:35 pmRNSPrice Monitoring Extension
2nd Oct 20127:00 amPRNLIM announces C$30 million equity financing
24th Sep 20124:40 pmRNSSecond Price Monitoring Extn
24th Sep 20124:35 pmRNSPrice Monitoring Extension
14th Sep 20127:00 amPRNLIM AGM and Operations Update
11th Sep 20122:15 pmPRNDirector/PDMR Shareholding
7th Sep 201212:20 pmPRNResult of AGM held 6 Sept 12
4th Sep 201211:09 amPRNLIM Operations Update and Outlook
15th Aug 201212:09 pmPRNIMS and LIM first quarter results
10th Aug 201212:15 pmPRNLIM new rail feasibility study
1st Aug 201210:44 amPRNTotal Voting Rights

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.