We would love to hear your thoughts about our site and services, please take our survey here.

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksAnglesey Mining Regulatory News (AYM)

Share Price Information for Anglesey Mining (AYM)

London Stock Exchange
Share Price is delayed by 15 minutes
Get Live Data
Share Price: 1.40
Bid: 1.30
Ask: 1.50
Change: 0.00 (0.00%)
Spread: 0.20 (15.385%)
Open: 1.40
High: 1.40
Low: 1.40
Prev. Close: 1.40
AYM Live PriceLast checked at -

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

Grängesberg Iron Ore Pre-Feasibility Study Commenced

9 Dec 2021 07:00

ANGLESEY MINING PLC - GrÀngesberg Iron Ore Pre-Feasibility Study Commenced

ANGLESEY MINING PLC - GrÀngesberg Iron Ore Pre-Feasibility Study Commenced

PR Newswire

London, December 8

Trading Symbol

LSE: AYM

9 December 2021

Anglesey Mining plc

(“Anglesey” or “the Company”)

GrÀngesberg Iron Ore Pre-Feasibility Study Commenced

Anglesey Mining plc (LSE:AYM), the UK minerals development company, is pleased to provide the following update on the GrÀngesberg Iron Ore Project in Sweden.

Highlights

Anglesey recently engaged Micon International to undertake an update on the 2012 Pre-Feasibility Study (PFS) to investigate the re-opening of the GrÀngesberg Iron Ore Project During the life of the original operation, GrÀngesberg produced 180Mt of iron ore. Prior to closure in 1989, when the iron ore price was trading around US$30/t, the GrÀngesberg mine was the third largest iron ore mine in Sweden and employed over 1,500 people. The Swedish Mining Inspectorate granted a mining for the project concession in 2013, which is valid for a minimum of 25 years. The current work programme is intended to provide an update on the PFS completed in 2012, which demonstrated an extremely robust development option based on the following parameters: Annual production of 5.3Mtpa of ore, producing 2.5Mtpa of >68% Fe concentrate, with a mine life of 16-years Probable reserves of 84Mt at 37.2% Fe derived from 148Mt of Indicated and Inferred resources

Jo Battershill, Chief Executive of Anglesey Mining, commented: “The GrĂ€ngesberg mine provides significant exposure to iron ore for Anglesey Mining. The project has all the attributes of a globally significant iron ore deposit. It has a large resource, the ability to produce a high-grade iron ore concentrate and is situated adjacent to existing rail infrastructure with a direct link to the port of Oxelösund on the Baltic Sea.

The worldwide movement towards decarbonisation is resulting in manufacturers seeking to minimise their carbon footprint. The production of a >68% Fe concentrate in Europe will afford local steelmakers the opportunity to shorten their supply chains and lower overall emissions. The commissioning of the HYBRIT fossil fuel free steel plant in Sweden already demonstrates the huge progress being made with regard to ‘green steel’ in the European region. Additionally, we note with interest the recent media reports suggesting the new Prime Minister of Sweden sees the need for more mines in the country.

There are a number of companies listed on the London, Toronto and Nordic exchanges with directly comparable projects that clearly demonstrate the potential upside to Anglesey Mining shareholders. The completion of the updated PFS will be an important step towards unlocking the value of this deposit. We very much look forward to sharing the results of this study with the market in the new year.”

GrĂ€ngesberg Iron Ore Project – Updated Pre-Feasibility Study

Anglesey owns a 20% stake in the GrÀngesberg Iron Ore Project, located 230km northwest of Stockholm in Sweden. The Company has recently appointed Micon International to commence an update of the original PFS for GrÀngesberg, completed in 2012. The results of the updated PFS will be important in guiding the Anglesey Board in the options to bring the Grangesberg Mine to production and on its Right of First Refusal over an additional 50.1% of the project.

The GrÀngesberg project is a substantial iron ore asset located in a very favourable jurisdiction and, prior to its closure in 1989, the mine produced around 180Mt of iron ore. Remaining resources were estimated at 148Mt at 41.3% Fe in an NI 43-101 Technical Report completed by Roscoe Postle Associates Inc in 2014.

ResourceTonnesFe
Category(Mt)(%)
GrÀngesbergIndicated115.240.2
Inferred33.145.1
Total148.341.3

Diamond drilling has confirmed that the mineralisation at GrÀngesberg remains of mineable widths at a depth of 1,200m below surface. Historical geophysical work suggests the orebody may be open down to a depth of 1,700m.

The Pre-Feasibility Study completed in 2012 demonstrated a probable reserve of 84Mt, which at a proposed mining rate of 5.3Mtpa, generated a mine life of more than 16-years. Historical production demonstrated that beneficiation of the ore produces a very high-grade concentrate (>68% Fe).

About Anglesey Mining plcAnglesey Mining is listed on the London Stock Exchange and currently has 248,070,732 ordinary shares on issue.

Anglesey is developing its 100% owned Parys Mountain copper-zinc-lead deposit in North Wales, UK with a 2020 reported resource of 5.2 million tonnes at 4.3% combined base metals in the Indicated category and 11.7 million tonnes at 2.8% combined base metals in the Inferred category. 

Anglesey holds an almost 20% interest, and management rights to the Grangesberg Iron project in Sweden, together with a right of first refusal to increase its interest by a further 50.1%. Anglesey also holds 12% of Labrador Iron Mines Holdings Limited which holds direct shipping iron ore deposits in Labrador and Quebec.

 

For further information, please contact:

Jo Battershill, Chief Executive +44 (0)7540 366000

John Kearney, Chairman + 1 416 362 6686

LEI: 213800X8BO8EK2B4HQ71

Date   Source Headline
22nd Jan 20217:00 amPRNPlacing of 10 million new shares for £660,000
11th Jan 20217:00 amPRNParys Mountain P.E.A. - Major Increase in Resources
5th Jan 202111:05 amRNSSecond Price Monitoring Extn
5th Jan 202111:00 amRNSPrice Monitoring Extension
4th Jan 20219:06 amRNSSecond Price Monitoring Extn
4th Jan 20219:00 amRNSPrice Monitoring Extension
11th Dec 202011:05 amRNSSecond Price Monitoring Extn
11th Dec 202011:00 amRNSPrice Monitoring Extension
11th Dec 20207:14 amPRNHalf-year Report for six months to 30 September 2020
10th Dec 202011:05 amRNSSecond Price Monitoring Extn
10th Dec 202011:00 amRNSPrice Monitoring Extension
10th Dec 20209:05 amRNSSecond Price Monitoring Extn
10th Dec 20209:00 amRNSPrice Monitoring Extension
9th Dec 20202:06 pmRNSSecond Price Monitoring Extn
9th Dec 20202:01 pmRNSPrice Monitoring Extension
9th Dec 202011:05 amRNSSecond Price Monitoring Extn
9th Dec 202011:00 amRNSPrice Monitoring Extension
9th Dec 20209:05 amRNSSecond Price Monitoring Extn
9th Dec 20209:00 amRNSPrice Monitoring Extension
9th Dec 20208:58 amPRNIssue of Equity - Warrants exercised
7th Dec 20209:05 amRNSSecond Price Monitoring Extn
7th Dec 20209:00 amRNSPrice Monitoring Extension
4th Dec 20202:05 pmRNSSecond Price Monitoring Extn
4th Dec 20202:00 pmRNSPrice Monitoring Extension
4th Dec 20209:28 amPRNWarrant conversion - £68,400 raised
3rd Dec 20204:41 pmRNSSecond Price Monitoring Extn
3rd Dec 20204:35 pmRNSPrice Monitoring Extension
3rd Dec 20202:01 pmRNSPrice Monitoring Extension
1st Dec 20202:06 pmRNSSecond Price Monitoring Extn
1st Dec 20202:00 pmRNSPrice Monitoring Extension
30th Nov 202011:05 amRNSSecond Price Monitoring Extn
30th Nov 202011:00 amRNSPrice Monitoring Extension
23rd Nov 202010:50 amPRNIssue of Equity
18th Nov 20204:41 pmRNSSecond Price Monitoring Extn
18th Nov 20204:36 pmRNSPrice Monitoring Extension
18th Nov 20202:05 pmRNSSecond Price Monitoring Extn
18th Nov 20202:01 pmRNSPrice Monitoring Extension
16th Nov 20204:41 pmRNSSecond Price Monitoring Extn
16th Nov 20204:36 pmRNSPrice Monitoring Extension
16th Nov 20202:05 pmRNSSecond Price Monitoring Extn
16th Nov 20202:00 pmRNSPrice Monitoring Extension
2nd Nov 20207:00 amPRNGeneral Meeting Results & Chairman's Update Comments
30th Oct 20207:00 amPRNLabrador Iron Mines – Preliminary Economic Assessment
8th Oct 202011:06 amPRNIssue of Equity
2nd Oct 202011:00 amRNSPrice Monitoring Extension
1st Oct 20207:00 amPRNResult of AGM & Total Voting Rights
1st Oct 20207:00 amPRNPreliminary Economic Assessment in progress
28th Sep 20207:00 amPRNFinal Results
11th Sep 20204:00 pmPRNNotice of AGM
1st Sep 202012:01 pmPRNAdmission to listing and Total Voting Rights

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.