Scancell founder says the company is ready to commercialise novel medicines to counteract cancer. Watch the video here.

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksAtalaya Mining Regulatory News (ATYM)

Share Price Information for Atalaya Mining (ATYM)

London Stock Exchange
Share Price is delayed by 15 minutes
Get Live Data
Share Price: 408.00
Bid: 407.50
Ask: 408.50
Change: -2.00 (-0.49%)
Spread: 1.00 (0.245%)
Open: 412.00
High: 412.50
Low: 404.00
Prev. Close: 410.00
ATYM Live PriceLast checked at -

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

Geophysical Surveys

2 Aug 2005 09:37

Eastern Mediterranean Res. Pblc LD02 August 2005 2nd August 2005 DETAILED GEOPHYSICAL SURVEYS COMMENCE IN CYPRUS For full release, including graphics, click on the following link: http://www.rns-pdf.londonstockexchange.com/rns/5922p_-2005-8-2.pdf The board of Eastern Mediterranean Resources Public Limited ("EMED" or "theCompany")(AIM:EMED), announces that detailed ground geophysical surveys ofpriority target areas in Cyprus have now commenced. EMED's first major exploration project is in Cyprus and targets volcanic-hostedmassive sulphide ("VHMS") copper-gold deposits. The Company has a groundposition covering 373 km2 over the prospective Troodos Complex in Cyprus. Mr Anagnostaras-Adams, EMED's Managing Director, said "VHMS deposits are verysuited to detection by geophysical methods. EMED is the first company to utilisemodern geophysical techniques to systematically explore the Troodos Complex forblind copper-gold deposits beneath relatively shallow cover rocks. The Cyprusteam is systematically advancing towards the exciting phase of drilling theseprospects in a manner that is both cost efficient and maximises the probabilityof discovering economic deposits". Over recent months, exploration has focussed on eleven target areas ofapproximately 3 km2 each. These targets have now been defined more precisely byon-going geological mapping and detailed processing and interpretation ofexisting geophysical data. From this work, the areas for detailed groundgeophysical surveys have been defined. Modern techniques of deep-penetrating geophysics (Transient Electro-Magnetic andInduced Polarisation methods) will be used in order to penetrate to a greaterdepth below the surface than previous exploration. The aim is to detect blindeconomic mineralisation covered by pillow lavas or sedimentary rocks. Initially, an orientation survey was completed in an area of knownmineralisation, which was discovered by older methods of geophysics andconfirmed by drilling. This calibrated the new geophysical methods against knownparameters and facilitates extrapolating the new geophysical data to greaterdepths. Of the original eleven target areas, six areas have been enhanced by thegeophysical re-processing and two new areas have been added. Several of theseeight primary areas have been found to contain multiple target zones, providingabout 15 prospects for ground geophysical surveys. These surveys have nowcommenced and are planned to cover prospects of one to two square kilometreseach. In addition, further review of the existing geophysical data, together withgeological mapping, has led to the recognition of a number of secondary targetareas on which ground geophysics surveys may be undertaken once results of theprimary targets have been assessed. The North Alestos area exemplifies the results achieved by this review. Click onthe link at the start of this announcement to view the diagram showing theoriginal North Alestos Target Area on a reduced-to-pole (RTP) magnetic base,along with the flight lines and conductivity anomalies of the previous DIGHEMairborne geophysical survey. Reprocessing and reinterpretation of the data from these previous geophysicalsurveys has resulted in recognition of new structures and individual prospects.The planned ground geophysical survey will cover three prospects over the onesquare kilometre area shown. This detailed survey should better define theseprospects and determine their properties to a greater depth than possible fromthe historical data. The targeted scale of the typical EMED prospect, including those identified atNorth Alestos, is at least 150,000 tonnes of contained copper at economic oregrades. EMED intends rapidly to advance this exploration programme and plans to drillthe best five target areas by the end of 2005. Enquiries Eastern Mediterranean Resources Nabarro Wells Parkgreen CommunicationsHarry Anagnostaras-Adams Nigel Atkinson / Justine Howarth / David Nabarro Ana Ribeiro+357 9945 7843 +44 (0) 7710 7400 +44 (0)20 7493 3713www.emed-resources.com References in this announcement to exploration potential have been approved forrelease by employees of the Company - Mr Ron Cunneen, Mr Alasdair Murray and MrNicos Adamides who each have more than 5 years relevant experience in the fieldof activity concerned and have consented to the inclusion of the material in theform and context in which it appears. About Eastern Mediterranean Resources Public Limited The Company listed on AIM in May 2005 following an initial public offering ofits shares. The Company is headquartered in Cyprus as a demonstration of themanagement and technical staff's commitment to the region. About Mining in Cyprus Cyprus has a mining history of over 3,000 years and hosts one of the world'smost highly mineralized regions. The Troodos Complex, a Cretaceous-agedophiolite - a distinct layered sequence of mafic and ultramafic rocks - forms aneast/west range across the central/southern part of the island. Its major mineswere Mavrovouni, Skouriotissa and Limni - all of which exceeded 10 milliontonnes of ore containing copper and gold. The largest was Mavrovouni withreported production of 15 million tonnes of ore containing 4 per cent. copperand unreported gold grades. Group Strategy and Future Prospects The Group's region of interest is the Mesozoic to Tertiary age tectonic beltthat winds from Eastern Europe to Iran. This belt extends for over 3,000km. TheGroup's strategy is rapidly to evaluate exploration opportunities in severaljurisdictions throughout a quality mineral belt with a relatively high rate ofproject turnover. It is intended that each new prospect will be prioritised for consideration onthe following basis: • that it has a history of previous production or exploration; • the Group has the opportunity to apply the most up to date exploration techniques; and • the resource potential is greater than 150,000 tonnes of copper or 1 million ounces of gold. It is intended that the Group's exploration budget over the next two years willbe divided broadly equally between activities on Cyprus and activities outsideof Cyprus. EMED has an extensive proprietary database relating to Cyprus inherited from thework done by predecessor explorers over the past 50 years, including OxianaLimited. For further information on the Company's activities, visitwww.emed-resources.com This information is provided by RNS The company news service from the London Stock Exchange
Date   Source Headline
5th Jul 20197:00 amRNSAppointment of Broker
27th Jun 20191:00 pmRNSResult of AGM
27th Jun 20197:00 amRNSAGM Statement
30th May 20197:00 amRNSNotice of AGM and 2018 Annual Report
30th May 20197:00 amRNSDirector/PDMR Shareholding
23rd May 20197:00 amRNS1st Quarter Financial Results
26th Apr 20191:30 pmRNSLegal Update
15th Apr 20197:00 amRNSFirst Quarter 2019 Operations Update
4th Apr 20197:00 amRNSResults for the year ended 31 December 2018
29th Mar 20197:00 amRNSLegal Update
15th Jan 20197:00 amRNSOperations Update and 2019 Guidance
22nd Nov 20187:00 amRNS3rd Quarter Results
1st Nov 201812:25 pmRNSResult of Appeal
12th Oct 20184:40 pmRNSSecond Price Monitoring Extn
12th Oct 20184:35 pmRNSPrice Monitoring Extension
12th Oct 20187:00 amRNSRecent press speculation
10th Oct 20187:00 amRNSThird Quarter 2018 Operations Update
26th Sep 20187:00 amRNSReceipt of Ruling of EeA Claim
12th Sep 20187:00 amRNSQ2 and H1 2018 Interim Financial Statements
30th Jul 20187:00 amRNSNI 43-101 Technical Report for Proyecto Riotinto
16th Jul 20187:00 amRNSSecond Quarter 2018 Operations Update
9th Jul 20187:00 amRNSProyecto Riotinto updated 43-101 technical report
27th Jun 201811:41 amRNSResult of AGM
27th Jun 20187:00 amRNSAGM Statement
1st Jun 20181:37 pmRNSIssue of Equity
30th May 20187:00 amRNSNotice of AGM
24th May 20187:00 amRNS1st Quarter Financial Results
21st May 20187:00 amRNSFiling of Pre-Feasibility Study for Proyecto Touro
27th Apr 201810:03 amRNSAudited Financial Statements
23rd Apr 20187:00 amRNSProyecto Touro Pre-feasibility Study
13th Apr 20187:00 amRNSIssue of Equity - Buyout of Rumbo Royalty
11th Apr 20187:00 amRNSFirst quarter 2018 Operations Update
27th Mar 20187:00 amRNSResults for the year ended 31 December 2017
13th Feb 20187:00 amRNSIssue of Equity
22nd Jan 20187:00 amRNS2017 Operations Update and 2018 Guidance
7th Dec 201710:55 amRNSResult of Equity Issue
4th Dec 20177:05 amRNSProposed Placing to raise up to £39 million
4th Dec 20177:01 amRNSApproval of Expansion Project at Proyecto Riotinto
16th Nov 20177:00 amRNS3rd Quarter Financial Results
12th Oct 20177:00 amRNS3rd Quarter Operations Update
7th Sep 20177:00 amRNSHalf-year Report
31st Jul 20177:00 amRNSSecond quarter operations update
13th Jul 20171:05 pmRNSResult of AGM
13th Jul 20179:00 amRNSAGM Statement
15th Jun 20177:00 amRNSNotice of AGM
9th Jun 201712:10 pmRNSDirector/PDMR Shareholding Replacement
9th Jun 201711:20 amRNSDirector/PDMR Shareholding
5th Jun 20177:00 amRNSProyecto Touro - Progress update
2nd Jun 20177:00 amRNSProyecto Riotinto production study to proceed
25th May 20177:00 amRNS1st Quarter Results

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.