Less Ads, More Data, More Tools Register for FREE

Pin to quick picksAtalaya Mining Regulatory News (ATYM)

Share Price Information for Atalaya Mining (ATYM)

Share Price is delayed by 15 minutes
Get Live Data
889.00    0.00 (0.00%)
Bid:
0.00
Ask:
0.00
Spread: 1.50 (0.169%)
Market Cap: £1.37b
ATYM Live PriceLast checked at - London Stock Exchange

Intraday Atalaya Mining Share Chart

Approval of feasibility study using E-LIX System

28 Oct 2020 07:00

RNS Number : 4016D
Atalaya Mining PLC
28 October 2020
 

28 October 2020

Atalaya Mining Plc.

("Atalaya" or "the Company")

Atalaya approves feasibility study to evaluate production of cathodes at Proyecto Riotinto using newly developed E-LIX System

 

Atalaya Mining Plc (AIM:ATYM, TSX:AYM) is pleased to announce that it has commenced the execution of a feasibility study to evaluate the economic viability of producing cathodes from complex sulphide ores prevalent in the Iberian Pyrite Belt through the application of a new extraction process called the E-LIX System (more details below) with a new industrial scale plant (the "Feasibility Study"). The production of cathodes has the potential to generate cost savings by reducing charges associated with concentrate transportation, treatment and refining, and penalty elements, while also reducing carbon emissions.

About E-LIX System

 

Refer to Atalaya's website for the full announcement with images https://atalayamining.com/investors-announcements/

 

E-LIX System is a newly developed electrochemical extraction process developed and owned by Lain Technologies Ltd ("Lain Tech") which is led by Dr. Eva Lain, who holds a PhD in Electrochemistry research from the University of Cambridge.

 

Through the application of singular catalysts and physicochemical conditions, E-LIX System is able to achieve high metal recoveries under low residence times, by accomplishing rapid reaction rates while overcoming classic surface passivation issues that have typically impaired metal recovery from complex sulphide ores. E-LIX System is considered to be a more environmentally friendly process than existing technologies; it is a zero emissions process that does not consume water nor acid and runs under mild operating conditions (atmospheric pressure and room temperature). Hence, the process is additionally characterised by ease and safety of operation.

 

Development and proof of concept of E-LIX System

 

The E-LIX System was patented in 2014 by Lain Tech and has been developed in collaboration with Atalaya from an initial concept in the laboratory to a fully operational pilot plant located at Proyecto Riotinto (the "Pilot Plant").

 

The Pilot Plant with a capacity of 5 tonnes per day has been running for the past nine months, with only mandatory stoppage owing to COVID-19 restrictions. Leach rates of up to 250 kilograms per hour have been achieved processing copper concentrates, zinc concentrates and blends of different types of sulphides. The Pilot Plant also contains a solvent extraction and electrowinning ("SX-EW") section and has successfully produced high purity copper cathodes as a proof of concept. Excellent leach results with recovery rates well over 90% have been attained. Fast kinetics for copper and zinc have also been successfully achieved overcoming the well-known passivation problem of leaching primary sulphides.

 

 

The Pilot Plant has demonstrated that the E-LIX System treats effectively the impurity levels typically associated with the complex sulphides present in the world-class pyrite belt that runs through the South of Portugal and Spain and prevalent at Proyecto Riotinto.

 

Partnership between Lain Tech and Atalaya

 

During the past five years Atalaya has provided financial assistance to Lain Tech to develop the E-LIX System and has now reached an agreement with Lain Tech to use its patents, on an exclusive licence basis within the Iberian pyrite belt in Spain and Portugal ("Licence Agreement").

 

Under the terms of the Licence Agreement and based on the encouraging operating results at the Pilot Plant, the Company has commissioned a Feasibility Study to evaluate the construction of an industrial scale plant for the production of a minimum of 10,000 tonnes of copper cathode metal a year. The Feasibility Study at a cost of approximately €1 million will be funded by Atalaya and is expected to be finalised in 2021. The Licence Agreement provides for a profit sharing arrangement between Atalaya and Lain Tech.

 

The Feasibility Study will be based on the results obtained from the Pilot Plant and aims to confirm the scalability of the E-LIX System and the capital and operating costs of the industrial plant. Should the industrial plant be built, it will be funded and constructed by Atalaya with Lain Tech designing, operating and managing the E-LIX System.

 

Atalaya believes that the use of the E-LIX System could potentially be applicable to the large amount of complex sulphide ore inventory present throughout the Iberian pyrite belt, including Atalaya's mining properties such as Proyecto Riotinto and Proyecto Masa Valverde.

 

Alberto Lavandeira, CEO, commented:

"We are fortunate to have been given this unique opportunity to work with Dr. Eva Lain in the development of the E-LIX System. I believe this system has the potential to play an important role in the economic treatment of many complex orebodies worldwide. We look forward to updating the market on the results of the Feasibility Study."

 

Contacts:

Newgate Communications

Elisabeth Cowell / Adam Lloyd / Tom Carnegie

+ 44 20 3757 6880

4C Communications

Carina Corbett

+44 20 3170 7973

Canaccord Genuity

(NOMAD and Joint Broker)

Henry Fitzgerald-O'Connor / James Asensio

+44 20 7523 8000

BMO Capital Markets

(Joint Broker)

Tom Rider / Michael Rechsteiner / Neil Elliot

+44 20 7236 1010

Peel Hunt LLP

(Joint Broker)

Ross Allister / David McKeown

+44 20 7418 8900

 

About Atalaya Mining Plc

Atalaya is an AIM and TSX-listed mining and development group which produces copper concentrates and silver by-product at its wholly owned Proyecto Riotinto site in southwest Spain. In addition, the Group has a phased, earn-in agreement for up to 80% ownership of Proyecto Touro, a brownfield copper project in the northwest of Spain. For further information, visit www.atalayamining.com

This information is provided by RNS, the news service of the London Stock Exchange. RNS is approved by the Financial Conduct Authority to act as a Primary Information Provider in the United Kingdom. Terms and conditions relating to the use and distribution of this information may apply. For further information, please contact rns@lseg.com or visit www.rns.com.RNS may use your IP address to confirm compliance with the terms and conditions, to analyse how you engage with the information contained in this communication, and to share such analysis on an anonymised basis with others as part of our commercial services. For further information about how RNS and the London Stock Exchange use the personal data you provide us, please see our Privacy Policy.
 
END
 
 
MSCDGBDGBXDDGGR
Date   Source Headline
8th Nov 20062:05 pmRNSHolding(s) in Company
3rd Nov 20069:54 amRNSDirector/PDMR Shareholding
2nd Nov 200610:23 amRNSHolding(s) in Company
30th Oct 20067:01 amRNSIssue of Equity
26th Oct 20062:15 pmRNSHolding(s) in Company
23rd Oct 20067:01 amRNSGold discovery in Slovakia
19th Oct 20069:28 amRNSPreliminary Feasibility Study
21st Sep 20067:02 amRNSInterim Results
20th Sep 20068:39 amRNSResult of EGM
18th Sep 20067:01 amRNSEMED forms new subsidiary
29th Aug 20067:01 amRNSDrilling Commences Slovakia
21st Aug 20067:01 amRNSCyprus Pre feasibility Study
4th Jul 20067:01 amRNSAcquisition of Database
23rd Jun 200611:55 amRNSHolding(s) in Company
6th Jun 20067:01 amRNSAppointment of Broker
30th May 20067:01 amRNSSlovakia Update
22nd May 20067:01 amRNSCopper Resource Identified
2nd May 20067:01 amRNSIncentive Options Scheme
27th Mar 20067:01 amRNSAcquisition
20th Mar 20067:00 amRNSSlovakia Update
9th Mar 200612:07 pmRNSAGM Statement
7th Mar 20067:02 amRNSPlacing
13th Feb 20063:16 pmRNSFinal Results
13th Feb 200612:40 pmRNSNotice of AGM
1st Feb 20067:00 amRNSGold Anomaly Identified
17th Jan 20067:00 amRNSSlovakia Licences Granted
12th Jan 20067:01 amRNSDrilling Report
29th Nov 200510:05 amRNSAppointment of Joint Broker
21st Nov 20057:01 amRNSDrilling Report
18th Nov 20059:23 amRNSGold exploration in Caucasus
8th Nov 20057:00 amRNSEastern Europe update
17th Oct 20059:22 amRNSDirector/PDMR Shareholding
13th Oct 20055:44 pmRNSDirector/PDMR Shareholding
3rd Oct 20057:00 amRNSDrilling Report
28th Sep 20057:02 amRNSInterim Results
12th Aug 200510:45 amRNSIssue of Ordinary Shares
9th Aug 20057:00 amRNSManagement Team Strengthened
2nd Aug 20059:37 amRNSGeophysical Surveys
26th Jul 200511:45 amRNSSlovakia Update
7th Jun 200511:31 amRNSExploration Update
23rd May 20051:00 pmRNSHolding(s) in Company

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.