Proposed Directors of Tirupati Graphite explain why they have requisitioned an GM. Watch the video here.

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksAndrada Mining. Regulatory News (ATM)

Share Price Information for Andrada Mining. (ATM)

London Stock Exchange
Share Price is delayed by 15 minutes
Get Live Data
Share Price: 4.90
Bid: 4.80
Ask: 5.00
Change: 0.05 (1.03%)
Spread: 0.20 (4.167%)
Open: 4.85
High: 4.90
Low: 4.85
Prev. Close: 4.85
ATM Live PriceLast checked at -

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

Uis Tin Mine Update - Proximal Pegmatites Mapped

7 Aug 2018 07:00

RNS Number : 9714W
AfriTin Mining Ltd
07 August 2018
 

 

 

AfriTin Mining Limited

("AfriTin" or the "Company")

Uis Tin Mine Operational Update - Proximal Pegmatites Mapped

AfriTin Mining Limited (AIM: ATM), a mining company with a portfolio of near production tin assets in Namibia and South Africa, with its flagship asset, the Uis Tin Mine in Namibia, is pleased to provide an update on its exploration operations.

Highlights

>180 new pegmatite bodies delineated on the ML134 mining license area within 5 kilometres of the phase 1 plant location

95% of the delineated pegmatite bodies display visible cassiterite mineralisation at surface

Water well field drilling intercepted a pegmatite body for 67 metres from a depth of 14 metres

 

As part of the phase 1 programme, that includes an upscaled commercial pilot plant and advancing towards a bankable feasibility study, AfriTin is also progressing exploration towards the delineation of additional mineralised pegmatite bodies to supply Phase 2.

The objective of this programme was geological mapping over the 197km2 mining license area to identify unprocessed, outcropping pegmatites, proximal to the existing plant and V1/V2 pit, where initial mining and processing is planned to commence. The programme involved mapping the surface outcrops of all visible pegmatite bodies within 5 kilometres of the planned plant location and identifying priority targets for future exploration programmes.

The mapping programme resulted in more than 180 pegmatite bodies being delineated within the existing mining license (ML134). The delineated pegmatites appeared up to 50 metres wide with strike lengths ranging from 20 metres to approximately a kilometre in length. A number of pegmatites also showed signs of previous artisanal exploitation.

 

In addition, mineralogical, structural and morphological characteristics were recorded. The programme concluded that 95% of the delineated pegmatites mapped contained visible cassiterite grains. The prevailing plunge direction of the newly identified Uis pegmatites is to the northwest and their morphology is similar to that observed in the previously mined pegmatites. The identified mineralisation is consistent with the coarse grained cassiterite (SnO2) documented in the existing open pits.

 

While conducting a well field drilling programme to upgrade the existing water infrastructure, a borehole was sighted adjacent to the W17 pegmatite. The vertically orientated borehole intersected pegmatite at a depth of 14 metres which continued unabated to a depth of 81 metres. The 67 meter pegmatite intersection contained visible cassiterite grains throughout.

 

A number of newly delineated pegmatite bodies mapped during this programme have been designated as high priority targets for further evaluation in the near future.

 

http://www.rns-pdf.londonstockexchange.com/rns/9714W_1-2018-8-6.pdf

 

 

 

 

Anthony Viljoen, CEO of AfriTin Mining Limited commented:

"The results of this mapping programme have been very encouraging. Not only do we have confirmation of the extent of the mineralisation in the V1/V2 pit, where we will commence phase 1 mining operations, but extensive examples of further mineralisation across the 197km2 mining licence area. Intersecting part of a new 67m pegmatite body while drilling for a water borehole is an encouraging example of how exploration drives mining growth and how AfriTin intends growing the company. Identification of further areas for future exploration confirms our belief that Uis is part of a significant tin province, with AfriTin leading the way in terms of its development."

 

 

For further information, please visit www.afritinmining.com or contact:

AfriTin Limited

 

Anthony Viljoen, CEO

+27 (11) 268 6555

Nominated Adviser and Joint Broker

 

WH Ireland Limited

Katy Mitchell

Adrian Hadden

James Sinclair-Ford

+44 (0) 207 220 1666 

Joint Broker

 

NOVUM Securities Limited

Jon Belliss

+44 (0)20 7399 9400

Financial PR (United Kingdom)

 

Tavistock

+44 (0) 207 920 3150

Jos Simson / Barney Hayward

 

Financial PR (South Africa)

 

Lifa Communications

Cath Drummond / Gabriella von Ille 

+27 (11) 268 5781

 

 

 

 

About AfriTin Mining Limited

Notes to Editors

AfriTin Mining is the first pure tin company listed in London and its vision is to create a portfolio of world-class, conflict-free, tin producing assets. The Company's flagship asset is the Uis brownfield tin mine in Namibia, formerly the world's largest hard-rock tin mine.

AfriTin is managed by an experienced board of directors and management team with a current two-fold strategy: fast track Uis brownfield tin mine in Namibia to commercial production in 2018 ramping up to 5,000 tonnes of concentrate, and consolidation of other quality African tin assets. The Company strives to capitalise on the solid supply/demand fundamentals of tin by developing a critical mass of tin resource inventory, achieving production in the near term and further scaling production by consolidating tin assets in Africa.

This information is provided by RNS, the news service of the London Stock Exchange. RNS is approved by the Financial Conduct Authority to act as a Primary Information Provider in the United Kingdom. Terms and conditions relating to the use and distribution of this information may apply. For further information, please contact rns@lseg.com or visit www.rns.com.
 
END
 
 
UPDBUGDIUGGBGIL
Date   Source Headline
25th Aug 202111:00 amRNSPrice Monitoring Extension
11th Aug 20213:59 pmRNSHolding(s) in Company
11th Aug 20213:58 pmRNSHolding(s) in Company
30th Jul 20217:00 amRNSNotice of Annual General Meeting
22nd Jul 20217:00 amRNSAudited Financial Results
2nd Jul 20212:05 pmRNSSecond Price Monitoring Extn
2nd Jul 20212:00 pmRNSPrice Monitoring Extension
14th Jun 20217:00 amRNSQuarterly Operation Update
11th Jun 20217:00 amRNSInvestor webcast
25th May 20218:25 amRNSIssue of Shares
25th May 20217:37 amRNSSettlement of long term liabilities
19th May 20213:08 pmRNSHolding(s) in Company
19th May 20213:08 pmRNSHolding(s) in Company
12th May 20217:00 amRNSResults of Placing
11th May 20215:17 pmRNSProposed fundraising to raise approximately £10 m
4th May 20217:00 amRNSUis Phase 1 Expansion – DFS Results
27th Apr 20211:55 pmRNSHolding(s) in Company
22nd Apr 20211:56 pmRNSExercise of Warrants
12th Apr 20217:00 amRNSTantalum & Lithium By-Product Test Work Programme
9th Mar 20219:05 amRNSSecond Price Monitoring Extn
9th Mar 20219:00 amRNSPrice Monitoring Extension
8th Mar 20217:00 amRNSQuarterly Production Update
15th Feb 20218:52 amRNSConversion of AfriMet loan note to ordinary shares
15th Feb 20217:00 amRNSOfftake agreements
1st Feb 20217:00 amRNSInvestor Webinar
25th Jan 20212:05 pmRNSSecond Price Monitoring Extn
25th Jan 20212:00 pmRNSPrice Monitoring Extension
5th Jan 20214:41 pmRNSSecond Price Monitoring Extn
5th Jan 20214:36 pmRNSPrice Monitoring Extension
4th Jan 20213:41 pmRNSDirectors Remuneration/Repricing of Share Options
7th Dec 20207:00 amRNSOperational Update
12th Nov 20204:41 pmRNSSecond Price Monitoring Extn
12th Nov 20204:35 pmRNSPrice Monitoring Extension
12th Nov 20202:06 pmRNSSecond Price Monitoring Extn
12th Nov 20202:00 pmRNSPrice Monitoring Extension
12th Nov 20207:00 amRNSOperational Update
26th Oct 20207:00 amRNSOperational Update
1st Oct 20208:52 amRNSChange of Registered Address
29th Sep 20202:04 pmRNSResult of AGM
29th Sep 20207:00 amRNSHalf-year Report
9th Sep 20207:00 amRNSOperational Update
28th Aug 20207:01 amRNSBoard Change
28th Aug 20207:00 amRNSAudited Financial Results
11th Aug 20204:04 pmRNSHolding(s) in Company
5th Aug 20207:00 amRNSOperational Update
3rd Aug 20201:01 pmRNSEquity Placing and Subscription
16th Jun 20207:00 amRNSOperational Update & Uis Tin Mine Phase 1 Review
28th May 202012:00 pmRNSElectronic Distribution of Shareholder Information
5th May 20207:00 amRNS£2.05 million Unsecured Loan Note Facility
31st Mar 20201:20 pmRNSCOVID-19 Update

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.