Less Ads, More Data, More Tools Register for FREE

Pin to quick picksAndrada Mining Regulatory News (ATM)

If you are a professional, HNW or sophisticated investor and want to learn more about the current funding round for Peloton Minerals, please email kat.perez@focusir.com.

Share Price Information for Andrada Mining (ATM)

Share Price is delayed by 15 minutes
Get Live Data
3.55    0.01 (0.28%)
Bid:
3.50
Ask:
3.60
Spread: 0.10 (2.857%)
Market Cap: £78.06m
ATM Live PriceLast checked at - London Stock Exchange

Intraday Andrada Mining Share Chart

Lithium Ridge Exploration Update

26 Jan 2026 07:00

RNS Number : 2883Q
Andrada Mining Limited
26 January 2026
 

The information contained within this announcement is deemed by the Company to constitute inside information as stipulated under the Market Abuse Regulations (EU) No. 596/2014 (MAR) as in force in the United Kingdom pursuant to the European Union (Withdrawal) Act 2018. Upon the publication of this announcement via Regulatory Information Service (RIS), this inside information will be in the public domain.

Andrada Mining Limited

("Andrada" or the "Company")

HIGH-GRADE mineralised pegmatites identified at Lithium Ridge as exploration drilling ADVANCES

Andrada Mining Limited (AIM: ATM, OTCQB: ATMTF) ("Andrada"), a tin producer with a portfolio of critical minerals mining and exploration assets in Namibia, is pleased to announce exceptional surface sampling results from Lithium Ridge ("Lithium Ridge" or the "Project") in partnership with Sociedad Química y Minera de Chile SA through its subsidiary SQM Australia (Pty) Ltd ("SQM").  The results of the comprehensive geological mapping and grab sampling across the licence area provide strong validation for the ongoing Stage 1 drilling programme, funded by SQM under the previously announced earn-in agreement, to acquire a 30% shareholding.

HIGHLIGHTS

§ Exceptional lithium grades at surface: multiple grab samples returned grades exceeding 4% Li2O, with a peak value of 4.67% Li2O

§ Extensive scale of mineralisation: high-grade laboratory results obtained from diverse pegmatite bodies across the mineralised trend, reinforcing the scale and footprint of lithium potential

§ Significant polymetallic upside: significant associated tin (Sn) and tantalum (Ta) mineralisation confirmed, with peak grades of 3.12% Sn and 905 ppm Ta in individual samples

§ Strategic minerals: Primary lithium mineralisation confirmed to be spodumene, consistent with previous drilling and sampling programmes

Anthony Viljoen, Chief Executive Officer, commented:

"The results from Lithium Ridge represent a very encouraging validation of the Project's lithium potential. Surface samples returning lithium grades in excess of 4% Li₂O, together with the confirmation of spodumene as the primary lithium mineral, reinforces our view that Lithium Ridge hosts a large, high-quality lithium system. Importantly, the presence of meaningful tin and tantalum grades alongside the lithium mineralisation highlights the polymetallic nature of the Project and its capacity to deliver by-product credits that could enhance future project economics. While expansion activities at our flagship Uis Mine continue to progress, Lithium Ridge demonstrates the potentially significant regional upside within Andrada's broader portfolio. We look forward to receiving the first assay results from the Lithium Ridge Stage 1 drilling programme, which is advancing on schedule."

Lithium ridge exploration Update

The comprehensive grab sampling was integrated with the geological mapping programme ("the Programme"), with the objective of identifying mineralised pegmatites that may have been previously overlooked. Evaluation of the recently identified pegmatites will continue as part of the Stage 1 drill programme which commenced in Q3 CY2025. The Programme systematically covered the entire licence area resulting in more than 1 500 outcropping pegmatites being mapped. Essentially, visual identification of lithium-bearing minerals, coupled with Raman spectroscopy validation, has identified:

§ Multiple new lithium bearing pegmatites along the Lithium Ridge trendline, increasing the width of the 6km long mineralised zone.

§ Additional lithium mineralisation within pegmatites across other parts of the licence area, indicating the potential for a significantly larger mineral system.

Of the 496 grab sample results received to date, as illustrated in Figure 1, the twenty highest lithium grades are reported in Table 1, with selected tin and tantalum samples reported in Table 2. Of these grab sample results, 115 reported grades above 1% Li2O (including 83 samples above 2% Li2O), 156 samples reported grades above 0.1% Sn (Figure 2), and 165 samples reported grades above 75 ppm Ta, highlighting the by-product potential of the licence area.  

Table 1: Selected twenty highest grade grab sample results for lithium (Coordinate system: UTM33 South)

Sample Number

Northing

Easting

Li2O (%)

Sn (%)

Ta (ppm)

NN07145

508267

7629054

4.67

0.05

26

NN07409

509141

7629482

4.57

0.00

3

NN07350

509246

7629754

4.47

0.02

15

NN07258

509020

7629399

4.40

0.00

10

NN07347

509136

7629650

4.40

0.03

37

NN07256

508919

7629341

4.37

0.03

12

NN07017

507575

7628438

4.26

0.00

8

NN07452

510722

7630719

4.25

0.04

13

NN07146

508286

7629063

4.24

0.04

22

NN07456

510924

7630865

4.17

0.08

70

NN07255

508878

7629315

4.13

0.03

6

NN07014

507475

7628435

4.11

0.02

98

NN07353

509170

7629705

4.10

0.05

36

NN07343

509064

7629609

4.07

0.04

27

NN07348

509187

7629678

4.06

0.02

12

NN07433

510420

7630561

4.05

0.02

28

NN07016

507478

7628376

4.03

0.00

8

NN07351

509211

7629733

3.99

0.04

57

NN07023

507678

7628772

3.94

0.04

15

NN07021

507713

7628794

3.93

0.04

24

 

 

Table 2: Selected high-grade tin and tantalum grab samples (Coordinate system: UTM33 South).

Sample Number

Northing

Easting

Li2O (%)

Sn (%)

Ta (ppm)

NN07411

509123

7629406

0.02

3.12

514

NN07003

507325

7628415

0.03

1.53

225

NN07053

508209

7628628

0.05

1.34

425

NN07177

508545

7628731

0.01

1.25

275

NN07337

509825

7629740

0.01

1.05

130

NN07096

506779

7628461

0.03

1.02

238

NN07227

507180

7628555

0.03

0.91

562

NN07010

507361

7628501

0.49

0.68

106

NN07280

508703

7629152

1.38

0.58

50

NN07455

510891

7630869

1.54

0.58

100

NN07132

507179

7629180

0.26

0.04

905

NN07199

509458

7629867

0.21

0.24

895

NN07230

507098

7628853

0.62

0.14

684

NN07129

506810

7629325

0.02

0.09

657

NN07241

508765

7629440

0.01

0.08

558

The grab samples were collected by qualified mapping teams with the location of each sample recorded using handheld GPS devices. Samples were submitted in their entirety to SA Labs Ithuba for pulverisation and homogenisation, with the pulps subsequently dispatched to UIS Analytical Services for geochemical analysis. Both contractors are certified, independent laboratories. A sodium peroxide fusion coupled with ICP-OES analysis was used to determine Li and other major element concentrations, while lithium borate fusion with ICP-MS analysis was performed to determine Sn, Ta and other minor or trace element concentrations. Internal laboratory Quality Assurance and Quality Control (QA/QC) standards were reported to Andrada, these controls were found to be compliant and suitable for the grab samples.

The geochemical results are being systematically integrated with mapping results to enhance the understanding of the mineralising system, and to define additional drill targets. Visual and handheld Raman spectroscopy identification of spodumene and other lithium ore minerals indicates that lithium mineralisation extends substantially beyond the areas initially targeted, supporting the interpretation of a significantly larger mineral system. The geochemical results confirm ore-grade potential of numerous pegmatites not previously drilled or sampled (Figure 1), while also demonstrating that many pegmatites host significant tin and tantalum mineralisation alongside the high Li2O grades (Figure 2). All grab samples were exclusively collected from the pegmatites; no samples of the surrounding schist have been analysed.

 Figure 1: Li2O grades in grab samples reported to date, with visually identified lithium ore minerals at mapping sites on Lithium Ridge

 

Figure 2: Sn grades in grab samples reported to date on Lithium Ridge

The Stage 1 drill programme is progressing on schedule with a third drill diamond rig having been mobilised to site in November 2025. The programme has been designed to comprise 14 000 metres of orientated core drilling across approximately 120 drill holes to determine the depth extent and continuity of the pegmatites along strike. The programme will test the previously known and recently discovered mineralised pegmatites within the Lithium Ridge licence area. The Company will provide regular updates as significant results are received and milestones achieved.

Competent Person statement

The technical data in this announcement has been reviewed by Professor Laurence Robb ("Prof. Robb"), who is a non-executive director of Andrada. Prof. Robb has over 30 years industry related exploration and economic geology experience and is a Competent Person for the reporting of exploration results. He has reviewed both the technical disclosures in this release as well as the quality assurance protocols (QA/QC) and results for this programme.

Glossary of abbreviations

ICP-MS

Inductively Coupled Plasma-Mass Spectrometry

ICP-OES

Inductively Coupled Plasma-Optical Emission Spectrometry

Li

Symbol for Lithium

Li → Li₂O

Metal to metal-oxide conversion factor of 2.153

LiO

Lithium oxide

PPM

Parts Per Million

QA/QC

Quality Assurance / Quality Control

Q3 CY2025

Third quarter of the 2025 calendar year

Raman Spectroscopy

Raman spectroscopy is a non-destructive, in situ technique to determine the mineralogical composition, polymorphs, crystallinity, and mineral chemistry of rocks, ores, and inclusions by analysing the Raman scattering (inelastic scattering) of laser light caused by vibrational modes within mineral crystal lattices.

Sn

Symbol for Tin

Ta

Symbol for Tantalum

 

 

CONTACT

 

ANDRADA MINING LIMITED

Anthony Viljoen, CEO

Sakhile Ndlovu, Head of Investor Relations

+27 (11) 268 6555

 

NOMINATED ADVISOR & BROKER

Zeus Capital Limited

Katy Mitchell

Andrew de Andrade

Harry Ansell

+44 (0) 20 2382 9500

 

CORPORATE BROKER & ADVISOR

H&P Advisory Limited

Andrew Chubb

Jay Ashfield

Matt Hasson

+44 (0) 20 7907 8500

 

Berenberg

Jennifer Lee

 

+44 (0) 20 3753 3040

FINANCIAL PUBLIC RELATIONS

Tavistock (United Kingdom)

Emily Moss

Josephine Clerkin

+44 (0) 207 920 3150

andrada@tavistock.co.uk

 

About Andrada Mining Limited

Andrada Mining Limited, listed on the London Stock Exchange's AIM market, is a tin producer with a portfolio of critical minerals mining and exploration assets in Namibia, a premier investment destination in Africa. The Company's strategy focuses on unlocking Namibia's abundant mineral resources via best-in-class strategic partnerships across its resource base, enhancing the country's reputation as a leading global hub for African critical mineral investment. Andrada is actively scaling up tin production alongside lithium, tantalum, tungsten and copper, steadily broadening its operational footprint and output. The Company aims to supply critical raw materials from its extensive resource portfolio to support a sustainable future, improve quality of life, and uplift communities near its operations. These critical metals play a crucial role in the green energy transition, serving as essential components for electric vehicles, solar panels, and wind turbines.

.

 

 

This information is provided by RNS, the news service of the London Stock Exchange. RNS is approved by the Financial Conduct Authority to act as a Primary Information Provider in the United Kingdom. Terms and conditions relating to the use and distribution of this information may apply. For further information, please contact rns@lseg.com or visit www.rns.com.RNS may use your IP address to confirm compliance with the terms and conditions, to analyse how you engage with the information contained in this communication, and to share such analysis on an anonymised basis with others as part of our commercial services. For further information about how RNS and the London Stock Exchange use the personal data you provide us, please see our Privacy Policy.
 
END
 
 
UPDBAMMTMTTTTRF
Date   Source Headline
20th Nov 20247:00 amRNSPublication of 2024 Sustainability Report
17th Oct 20245:24 pmRNSExercise of Share Options
16th Oct 20247:00 amRNSBrandberg West Second Batch Drill Results
30th Sep 20244:30 pmRNSResult of AGM
26th Sep 20247:00 amRNSQ2 operational update for period ended 31 Aug 24
12th Sep 20247:00 amRNSBrandberg West First Batch Drill Results
9th Sep 20247:00 amRNSAndrada partners with SQM to develop Lithium Ridge
30th Aug 20247:00 amRNSAudited Financial Results for Year End 29 Feb 2024
7th Aug 20247:00 amRNSCompletion of Bank Windhoek Funding Agreement
2nd Aug 20242:01 pmRNSShare issue in lieu of CLN cash interest payment
15th Jul 20247:29 amRNSChange of Nominated Adviser and Broker
27th Jun 20247:00 amRNSConditional Asset Portfolio Restructuring
21st Jun 20247:00 amRNSQ1 Ops Update for the Period ended 31 May 2024
21st May 20249:14 amRNSAndrada CEO Speaking Today at Junior Indaba
27th Mar 20249:38 amRNSOperational update - replacement
27th Mar 20247:00 amRNSOperational update for the period ended 29/02/24
19th Mar 20247:36 amRNSFunding Agreement
12th Mar 20247:00 amRNSProduction and Strategic Process Update
22nd Dec 20237:00 amRNSQ3 Ops Update for the period ended 30 Nov 2023
5th Dec 20237:00 amRNSSpodumene Concentrate Produced from Lithium Ridge
29th Nov 20237:00 amRNSUNAUDITED INTERIM RESULTS 6 MONTHS ENDED 31/08/23
28th Nov 20236:40 pmRNSHolding(s) in Company - Replacement
28th Nov 20235:03 pmRNSHolding(s) in Company
27th Nov 20237:00 amRNSLithium Development Update
16th Nov 20237:00 amRNSUSD 25 million received from OMF
15th Nov 20237:00 amRNSRenewal of off-take agreements
27th Oct 202312:08 pmRNSRelease of the 2023 Sustainability Report
12th Oct 20237:00 amRNSUpdate on Brandberg West
3rd Oct 20232:08 pmRNSExercise of Share Options
29th Sep 20237:00 amRNSExercise of Share Options
18th Sep 20237:00 amRNSFinal Results for Initial ML133 Drill Programme
14th Sep 20237:00 amRNSQ2 Ops Update for the period ended 31 August 2023
6th Sep 20237:00 amRNSInitial Drill Results on ML133 (“Lithium Ridge”)
5th Sep 20237:00 amRNSDevelopment Bank of Namibia financing concluded
29th Aug 20237:00 amRNSExploration Update on ML133 (Lithium Ridge)
24th Aug 20238:30 amRNSAudited Financial Results
15th Aug 20234:46 pmRNSOrion US$25m Funding Package Update - Replacement
15th Aug 20237:00 amRNSOrion US$25 Million Funding Package Update
18th Jul 20237:00 amRNSFunding update and commissioning of pilot plant
6th Jul 20237:00 amRNSDrill programme results for Spodumene Hill Project
26th Jun 20237:00 amRNSOperational update for period ended 31 May 2023
5th Jun 20237:00 amRNSShares to Trade on OTCQB & Update on Financing
22nd May 20237:00 amRNSFirst Bulk Lithium Production and Funding Update
18th May 20237:00 amRNSNotice of Investor Presentations
11th May 20237:05 amRNSIssue of Share Options
11th May 20237:00 amRNSAppointment of Barclays as Strategic Advisor
10th May 20237:00 amRNSAppointment of Directors
30th Mar 20235:26 pmRNSV1V2 final 2022 exploration drilling results
20th Mar 20237:00 amRNSQuarterly FY 2023 production and Company update
20th Feb 20237:00 amRNSDirector/PDMR Shareholding

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.