Less Ads, More Data, More Tools Register for FREE

Pin to quick picksAndrada Mining Regulatory News (ATM)

Share Price Information for Andrada Mining (ATM)

Share Price is delayed by 15 minutes
Get Live Data
3.70    -0.10 (-2.63%)
Bid:
3.60
Ask:
3.80
Spread: 0.20 (5.556%)
Market Cap: £81.36m
ATM Live PriceLast checked at - London Stock Exchange

Intraday Andrada Mining Share Chart

Drill programme results for Spodumene Hill Project

6 Jul 2023 07:00

RNS Number : 1002F
Andrada Mining Limited
06 July 2023
 

6 July 2023

The information contained within this announcement is deemed by the Company to constitute inside information as stipulated under the Market Abuse Regulations (EU) No. 596/2014 (MAR) as in force in the United Kingdom pursuant to the European Union (Withdrawal) Act 2018. Upon the publication of this announcement via Regulatory Information Service (RIS), this inside information will be in the public domain.

Andrada Mining Limited

("Andrada" or the "Company")

Drill programme results for the Spodumene Hill Project on ML129

Drill results provide indication of high-grade spodumene zones within the B1 and C1 pegmatites.

Andrada Mining Limited (AIM: ATM, OTCQB: ATMTF), the African technology metals mining company with a portfolio of mining and exploration assets in Namibia is pleased to provide assay results for the inaugural drill programme undertaken over the B1 and C1 pegmatites, located within the ML129 mining license and referred to as the Spodumene Hill Project.

HIGHLIGHTS

· All drill holes intersected mineralised pegmatites, indicating continuity at depth.

· Significant pegmatite intersections include:

Drill hole B1_01: 14.52 m at 1.38% Li2O, 285 ppm Ta and 0.131% Sn from a depth of 15.48 m to 30.00 m.

§ Including notable lithium intersections of 5 m at 2.32% Li2O from 18 m to 23 m; and 2.5m at 2.04% Li2O from 25.5m to 28 m.

Drill hole B1_09: 12.78 m at 0.74% Li2O, 181 ppm Ta and 0.052% Sn from a depth of 65.80 m to 78.58 m.

§ Including a notable lithium intersection of 4.66 m at 1.45% Li2O from 69 m to 73.66 m.

Drill hole C1_04:  11.06 m at 0.81% Li2O, 1101 ppm Ta and 0.033% Sn from a depth of 13.59 m to 24.65 m.

§ Including a notable lithium intersection of 3.65 m at 2.14% Li2O from 16 m to 19.65 m.

· High grade lithium intersections suggest the presence of significant spodumene mineralisation.

· The pegmatite intersections are positive for tantalum and provide additional upside, in the light of the near completion of the tantalum concentration circuit.

· Metallurgical programme initiated to investigate the optimal beneficiation process.

Anthony Viljoen, Chief Executive Officer, commented:

"These drill results provide an initial glimpse into the potential of the Spodumene Hill Project. The identified high-grade lithium intersections within the pegmatite could be separated through ore sorting to provide a potentially high-grade pre-concentrate for the lithium processing plant.

These results have also highlighted the tantalum potential of this area, and the relevance of the recently constructed tantalum recovery circuit. The proximity of the Spodumene Hill Project to the existing operations provides an immediate opportunity for additional revenues from the project area by blending tantalum grades.

The highlighted intersections provide a promising starting point for the next phase of exploration which will aim to define the extent of these zones both laterally and with depth. We have also initiated a metallurgical programme to investigate the optimal beneficiation process for the recovery of both lithium and tantalum, whilst also producing tin as a by-product."

OVERVIEW OF THE RESULTS

An exploration drill programme was undertaken on the Spodumene Hill Project, resulting in 1159 m of Diamond Drilling ("DD") being completed over seventeen drill holes. The pegmatite intersections reported here will form the base of an updated geological model and development of an ongoing exploration initiative. The drill results indicate zones of lithium enrichment within the pegmatite unit with the primary and only lithium ore mineral identified thus far being spodumene. The construction of a lithium pilot plant and tantalum processing circuit will assist with metallurgical investigations and the development of an optimised process flow diagram for material from these pegmatites.

The tabulated results (Table 1) provide the weighted average metal content of the entire pegmatite intersection and show the selected intersections, including those within the pegmatites. The selected intervals highlight areas where lithium values are greater than the average indicated by the entire pegmatite intersection and indicate that these pegmatites may contain zones of elevated lithium mineralisation. Future work programmes will investigate the nature and origin of these higher-grade zones within the pegmatite, with the aim of identifying extensions and additional occurrences.  Table 1: Exploration results of diamond drill holes indicating the full pegmatite intersections, grade and selected internal intersections. The drill holes were oriented with an inclination of 60 degrees, intersections are indicative of apparent thickness and not true thickness.

Hole ID

Pegmatite

From - To (m)

Interval (m)

Grade

Li₂O (%)

Ta (ppm)

Sn (%)

B1 01

B1

15.48 - 30.00

14.52

1.38

285

0.131

Including

18.00 - 23.00

5.00

2.32

159

0.124

Including

25.50 - 28.00

2.50

2.04

161

0.216

B1 02

B1

17.44 - 51.35

33.91

0.22

187

0.093

B1 03

B1

13.08 - 39.55

26.47

0.38

169

0.080

B1 04

B1

6.93 - 32.18

25.25

0.45

147

0.072

Including

10.00 - 13.00

3.00

1.25

133

0.052

B1 05

B1

20.10 - 37.18

17.08

0.47

110

0.070

Including

22.15 - 28.00

5.85

0.91

105

0.111

B1 06

B1

53.75 - 71.50

17.75

0.22

147

0.119

B1 07

B1

74.84 - 85.64

10.80

0.44

119

0.049

Including

79.00 - 80.00

1.00

1.86

151

0.045

B1 08

B1

52.61 - 61.95

9.34

0.18

166

0.083

B1 09

B1

4.60 - 62.32

57.72

0.19

352

0.076

B1 Lower

65.80 - 78.58

12.78

0.74

181

0.052

Including

69.00 - 73.66

4.66

1.45

116

0.088

C1 01

C1

10.00 - 20.65

10.65

0.26

243

0.062

C1 02

C1

11.15 - 18.1

6.95

0.48

426

0.066

Including

15.97 - 17.46

1.49

0.99

803

0.052

C1 03

C1

13.50 - 28.26

14.76

0.20

343

0.037

C1 04

C1

13.59 - 24.65

11.06

0.81

1101

0.033

Including

16.00 - 19.65

3.65

2.14

2742

0.057

C1 05

C1

45.68 - 52.76

7.08

0.09

233

0.026

C1 06

C1

53.64 - 59.91

6.27

0.44

163

0.049

Including

55.00 - 56.50

1.50

1.20

212

0.074

C1 07

C1

43.21 - 46.17

2.96

0.02

304

0.020

C1 08

C1

14.00 - 37.6

23.60

0.25

463

0.045

Including

18.00 - 22.00

4.00

0.92

129

0.021

 

All drill holes were drilled as DD at an inclination of sixty degrees from the horizontal. In all instances, apart from drill holes B1 09 and C1 08, the holes were planned to intersect the pegmatite perpendicular to the surface strike direction. Due to the undulating dip angle of the pegmatite units the intersections are assumed to be an indication of apparent thickness, which is greater than true thickness.

Other minor pegmatites identified in the drill hole, have not been reported on because they are not considered to be of economic significance. Each drill hole was geologically and geotechnically logged before being sampled. The sample analysis was undertaken by UIS Analytical Services, a certified independent laboratory, using a peroxide fusion. ICP-OES analysis was utilised for major and minor elements and ICP-MS utilised for the trace elements. No top cut has been applied when calculating the weighted average grades for anomalously rich intersections.

 

Figure 1: Maps of the programme indicating: A) The localities of the pegmatites in relation to each other, the holes drilled during this programme and the main road linking Uis and Henties Bay. B) The mapped outcrop areas of the B1 pegmatite and location of the drill holes for this programme and indicating the locality of the section line in Figure 2. C) The mapped pegmatite outcrop area and location of the C1 location of the drill holes.

 

Figure 2: Cross section through line A-A' as indicated in Figure 1B, showing the average grade of the whole intersection and the two selected intersections within the pegmatite as indicated in Table 1.

COMPETENT PERSON STATEMENT

The technical data relating to the exploration results in this announcement have been reviewed by Professor Laurence Robb (M.Sc.,PhD; FGSSA, FSEG, CGeol., Pr. Sci Nat. (Geological Sciences)), who is Visiting Professor at the University of Oxford and University of Johannesburg. Professor Robb is a non-executive director of Andrada Mining and has over 40 years of experience working in many of the great African mineral districts, including the Witwatersrand Basin, the Bushveld Complex, Barberton, Namaqualand, and the Birimian of West Africa. He also undertook extensive research into the metallogeny of southeast Asia (Malaysia and Myanmar). Professor Robb consents to the inclusion of the information in the form and context in which it appears.Glossary of abbreviations

DD

Diamond Drilling

ICP-MS

Inductively Coupled Plasma-Mass Spectrometry

ICP-OES

Inductively Coupled Plasma-Optical Emission Spectrometry

Li

Symbol for Lithium

Li → Li2O

Metal to metal-oxide conversion factor of 2.153

Li2O

Lithium oxide

PPM

Parts Per Million

QA/QC

Quality Assurance / Quality Control

Sn

Symbol for Tin

Ta

Symbol for Tantalum

 

Glossary of terminology

Apparent thickness

The relationship between apparent width and true thickness is based on the formula by Addie (1968 Economic Geology, vol 63, pp 188-189).

Dip angle

The angle of inclination measured downward from horizontal.

Geological model

The interpretation of mineralisation and geology that controls mineralisation. This is usually generated in a three-dimensional computer environment.

Pegmatite

An igneous rock typically of granitic composition, which is distinguished from other igneous rocks by the extremely coarse and systematically variable size of its crystals, or by an abundance of crystals with skeletal, graphic, or other strongly directional growth habits, or by a prominent spatial zonation of mineral assemblages, including monomineralic zones.

 

 

_______________________________________________________________________________________

Andrada Mining Limited

+27 (11) 268 6555

Anthony Viljoen, CEO

Sakhile Ndlovu, Head of Investor Relations

investorrelations@andradamining.com

Nominated Adviser 

+44 (0) 207 220 1666

WH Ireland Limited

Katy Mitchell

Corporate Advisor and Joint Broker

H&P Advisory Limited

Andrew Chubb

Jay Ashfield

Matt Hasson

+44 (0) 20 7907 8500

Stifel Nicolaus Europe Limited

Ashton Clanfield

Callum Stewart

Varun Talwar

+44 (0) 20 7710 7600

Tavistock Financial PR (United Kingdom)

Emily Moss

Catherine Drummond

Adam Baynes

+44 (0) 207 920 3150

andrada@tavistock.co.uk

About Andrada Mining Limited

Andrada Mining Limited has a vision to create a portfolio of globally significant, conflict-free, production and exploration assets. The Company's flagship asset is the Uis Mine in Namibia, formerly the world's largest hard-rock open cast tin mine.

Andrada has three mining licences namely;

· ML134 on which Uis Mine is located.

· ML133 (Nai Nais / Lithium Ridge).

· ML129 (B1C1 / Spodumene Hill).

The main minerals in these mining licences are tin, lithium and tantalum. Additionally, the Company has an exploration licence EL5445 (Brandberg West) on which the main minerals are tin, copper and tungsten. The Company has set a mineral resource target of 200 Mt to be delineated within the next 5 years. The substantial mineral resource potential allows the Company to consider economies of scale.

Andrada is managed by a board of directors with extensive industry knowledge and a management team with deep commercial and technical skills. Furthermore, the Company is committed to the sustainable development of its operations and the growth of its business. This is demonstrated by how the leadership team places significant emphasis on creating value for the wider community, investors, and other key stakeholders. Andrada has established an environmental, social and governance system which has been implemented at all levels of the Company and aligns with international standards.

[END]

This information is provided by RNS, the news service of the London Stock Exchange. RNS is approved by the Financial Conduct Authority to act as a Primary Information Provider in the United Kingdom. Terms and conditions relating to the use and distribution of this information may apply. For further information, please contact rns@lseg.com or visit www.rns.com.RNS may use your IP address to confirm compliance with the terms and conditions, to analyse how you engage with the information contained in this communication, and to share such analysis on an anonymised basis with others as part of our commercial services. For further information about how RNS and the London Stock Exchange use the personal data you provide us, please see our Privacy Policy.
 
END
 
 
DRLUPUGAMUPWGAA
Date   Source Headline
27th May 20267:00 amRNSUis Financing & Lithium Ridge Drilling Complete
8th May 20269:45 amRNSNotification of Major Holdings
5th May 20267:00 amRNSSecond Batch of Lithium Ridge Drill Results
29th Apr 20268:31 amRNSNotification of Major Holdings
29th Apr 20267:00 amRNSAmendment of Convertible Loan Notes
24th Apr 20262:09 pmRNSNotification of Major Holdings
23rd Apr 20267:08 amRNS-RUpdate: Investor Presentation via IMC
20th Apr 20267:00 amRNSStrategic Equity Placement To Accelerate Growth
13th Apr 20267:00 amRNSPositive Tungsten Test Results At Brandberg West
26th Mar 20267:00 amRNSBusiness Update For Period Ended 28 February 2026
3rd Mar 20264:03 pmRNSEmployee Incentive Scheme Update
24th Feb 20267:00 amRNSThaisarco Strengthens Relationship with Andrada
10th Feb 20262:40 pmRNSEIB Partnership for Uis Mine Feasibility Study
9th Feb 20267:00 amRNSHigh-grade initial drill results at Lithium Ridge
4th Feb 20267:00 amRNSACAM Transaction Update
26th Jan 20267:00 amRNSLithium Ridge Exploration Update
21st Jan 20267:00 amRNSPartnership with ACAM to develop Brandberg West
19th Jan 202611:00 amRNSOrange Trust Loan Conversion to Equity
17th Dec 20257:00 amRNSQ3 Operational Update For Period End 30 Nov 2025
1st Dec 202510:35 amRNSNotification of Major Holdings
27th Nov 20257:00 amRNSInterim Results for Six Months Ended 31 Aug 2025
7th Nov 20257:00 amRNS-RPublication of 2025 Sustainability Report
24th Oct 20255:26 pmRNSNotification of Major Holdings
24th Oct 20255:25 pmRNSNotification of Major Holdings
30th Sep 20252:00 pmRNSResults of the Annual General Meeting
29th Sep 20257:00 amRNSBoard Changes
15th Sep 20257:00 amRNSQ2 Operational Update For Period Ended 31 Aug 2025
3rd Sep 20257:00 amRNSExploration Drilling Commences at Lithium Ridge
29th Aug 20257:00 amRNSAudited Financial Results For Year End 28 Feb 2025
21st Aug 20257:00 amRNSAndrada accelerates growth of its tin production
15th Aug 20257:00 amRNSIssuance of Shares & Total Voting Rights
27th Jun 20257:00 amRNSResults of strategic Subscription & Placing
26th Jun 20257:00 amRNSProposed Strategic Subscription and Placing
19th Jun 20252:00 pmRNSNotification of Major Holdings
17th Jun 20257:00 amRNSAndrada Secures High-Grade Tin Feedstock
6th Jun 20257:00 amRNSOperational Update For Period Ended 31 May 2025
22nd May 202511:28 amRNSChange of Registered Address
10th Apr 20257:00 amRNSUis Exploration Drilling Results
31st Mar 20257:00 amRNSFY Operational Update For Period Ended 28 Feb 2025
11th Mar 202512:59 pmRNSNotification of Major Holdings
7th Mar 202512:41 pmRNSNotification of Major Holdings
4th Mar 20254:51 pmRNSDirector/PDMR Shareholding
28th Feb 20257:00 amRNSSQM earn-in agreement receives NaCC Approval
21st Feb 20252:17 pmRNSEmployee Incentive Scheme Update & Issue of Shares
14th Feb 202512:20 pmRNSNotification of Major Holdings
12th Feb 20257:00 amRNSOrange Trust Funding
6th Feb 20257:00 amRNSMineral Resource Update at Uis
20th Dec 20247:00 amRNSQ3 Operational Update for Period Ended 30 Nov 24
28th Nov 20247:00 amRNSUnaudited Interim Results 6 Months Ended 31/08/24
20th Nov 20247:00 amRNSPublication of 2024 Sustainability Report

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.