Less Ads, More Data, More Tools Register for FREE

Pin to quick picksAscent Resources Regulatory News (AST)

Share Price Information for Ascent Resources (AST)

Share Price is delayed by 15 minutes
Get Live Data
0.50    0.00 (0.00%)
Bid:
0.45
Ask:
0.55
Spread: 0.10 (22.222%)
Market Cap: £4.16m
AST Live PriceLast checked at - London Stock Exchange

Intraday Ascent Resources Share Chart

PEN-104 Update

21 Jan 2009 12:00

RNS Number : 0115M
Ascent Resources PLC
21 January 2009
 



Ascent Resources plc / Epic: AST / Index: AIM / Sector: Oil and Gas

21 January 2009

Ascent Resources plc ('Ascent' or 'the Company')

PEN-104 Update

Ascent Resources plc, the AIM-traded oil and gas production and exploration company, is planning to sidetrack its PEN-104 gas production well in the Penészlek area of the Nyírség exploration permits of eastern Hungary The well has been shut-in temporarily due to the failure of a compressor at the gas processing facility which resulted in unusually high export pipeline pressures. Repairs to the compressor that will reduce the pipeline pressure to its normal operating range are not expected to be completed until March 2009.

PetroHungaria kft, in which Ascent holds a 45.23% interest, operates the well and expects that a 450m sidetrack of the well will substantially increase the potential recoverable gas in addition to reducing the amount of water produced by the well. Subject to permitting and rig availability, the side-tracked PEN-104 well could be ready to produce gas by the time the pipeline pressure is expected to return to normal in March. The sidetrack opportunity has been identified from the analysis and interpretation of the 3-D seismic survey which was acquired in November 2008. The other partners in the Penészlek Project are DualEx (37.5%), Geomega (8%), Leni Gas & Oil (7.27%) and Swede Resources (2%).

In addition to this opportunity, the partners are considering four other development projects. These include the sidetracking of the PEN-102 well, the re-drill of PEN-9 and PEN-12, and a new well south of PEN-12. The PEN-102 well was drilled and suspended by PetroHungaria in 2007 and its sidetrack is planned to be drilled after the PEN-104 sidetrack, and the other wells are expected to be drilled in Q3 or Q4 2009.

The new seismic shows that neither the existing PEN-9 or PEN-12 wells are situated in an ideal location for producing their associated reserves, although a sidetrack of PEN-12 is being considered as an option.  While the PEN-104 and PEN-102 sidetracks can proceed quickly because of land access agreements already in place, the additional wells will require a full permitting procedure and are unlikely to be drilled before Q3 2009.  Potentially, one to three wells to redevelop the prematurely abandoned Penészlek Miocene field could also be drilled this year, however the deeper sections within the 3-D survey are still being evaluated.

.

Jeremy Eng, Ascent's Managing Director commented, "The results of the 3-D seismic acquisition have been excellent, and with the possibility of five producing wells in the medium term and with much of the infrastructure already in place, this is potentially a valuable development."

The information contained in this announcement has been reviewed and approved by Eloi Dolivo, Ascent's Senior Exploration Advisor who has 28 years relevant experience in the oil and gas industry.

* * ENDS * *

For further information visit www.ascentresources.co.uk or contact:

Jeremy Eng

Ascent Resources plc

Tel: 020 7251 4905

Hugo de Salis

St Brides Media & Finance Ltd

Tel: 020 7236 1177

Victoria Thomas

St Brides Media & Finance Ltd

Tel: 020 7236 1177

Max Hartley

Cenkos Securities plc

Tel: 020 7397 8924

Daniel Fox-Davies

Fox-Davies Capital Limited

Tel: 020 7936 5230

Notes:

Ascent Resources plc has a diversified portfolio of some 20 hydrocarbon exploration and development projects across five countries in Europe: ItalySwitzerlandHungarySlovenia and Netherlands. Ascent's portfolio contains a solid base of field redevelopment projects with selected exposure to exploration upside. The portfolio is focussed on gas and with the exception of the shallow water Netherlands project, all of its projects are located onshore where operating and development costs are substantially lower than they are offshore. In October 2008, Ascent agreed with San Severina Holdings SA, a Swiss based investment company, to establish an oil and gas asset management joint venture. The joint venture will acquire minority interests and providing investment funding for producing and development or appraisal stage oil and gas projects.

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
MSCILFELLDILFIA
Date   Source Headline
19th May 20267:00 amRNSRiverfort Amendment, Share Settlements & TVR
6th May 20267:00 amRNSUpdate on Slovenia ECT Claim
24th Apr 20267:00 amRNSJORC Exploration Target Defined by Neometals
27th Mar 20267:00 amRNSSpecial Bonus Award - Related Party Transaction
24th Mar 20267:00 amRNSUpdate on Slovenia ECT Claim
20th Mar 20267:00 amRNSExclusive Licence with Neometals
16th Mar 20269:37 amRNSGrant of Share Options and PDMR Notification
16th Mar 20269:37 amRNSGrant of Share Options and PDMR Notification
11th Mar 20267:00 amRNSUpdate on Slovenia Disputes
28th Jan 20262:20 pmRNSGrant of Share Options / PDMR Notification
14th Jan 20267:00 amRNSUpdate on Energy Charter Treaty Claim
26th Nov 20257:00 amRNSOption Agreement for exploitation in Utah
7th Oct 20257:00 amRNSUpdate on disputes out of Slovenian Joint Venture
29th Sep 20257:00 amRNSInterim results for the period ended 30 June 2025
23rd Sep 20257:00 amRNSUpdate on Energy Charter Treaty Claim
30th Jul 20257:00 amRNSBoard Changes
23rd Jul 20253:56 pmRNSHolding(s) in Company
16th Jul 20257:00 amRNSHolding(s) in Company
15th Jul 20257:24 amRNSOperations Update and Amendment to the PSAs
9th Jul 20257:00 amRNSAppointment of CEO
3rd Jul 20257:16 amRNSSuccessful Slovenia Domestic Arbitration Outcome
27th Jun 20253:11 pmRNSResults of Annual General Meeting
27th Jun 20257:00 amRNSUpdate on Utah Operations
20th Jun 20257:00 amRNSInitiation of work-program on ARB Energy
13th Jun 20252:11 pmRNSShares for Fees, Warrants, Options and PDMR
11th Jun 20257:00 amRNSHolding(s) in Company
9th Jun 20253:05 pmRNSHolding(s) in Company
2nd Jun 20257:00 amRNSFinal Results and Notice of AGM
22nd May 20252:05 pmRNSAcquisitions, Fundraising and Debt Reprofiling
21st May 20252:48 pmRNSHolding(s) in Company
21st May 20252:46 pmRNSHolding(s) in Company
17th Apr 20257:00 amRNSECT Hearing Concluded
20th Feb 20253:18 pmRNSResult of Meeting
11th Feb 20255:26 pmRNSHolding(s) in Company
11th Feb 20251:12 pmRNSHolding(s) in Company
5th Feb 20257:00 amRNSNotice of Record Date, GM & posting of Circular
28th Jan 20255:26 pmRNSIssue of Equity & Total Voting Rights
27th Jan 20257:00 amRNS-RPublication of Research
22nd Jan 20254:28 pmRNSHolding(s) in Company
17th Jan 202512:48 pmRNSHolding(s) in Company
15th Jan 20252:05 pmRNSHolding(s) in Company
10th Jan 20257:00 amRNSAdmission Date & Total Voting Rights
30th Dec 20242:58 pmRNSHolding(s) in Company
24th Dec 20247:00 amRNS-RUpdated Corporate Presentation
24th Dec 20247:00 amRNSDirector/PDMR Shareholding
20th Dec 20247:00 amRNSInvestment in US Gas, Oil and Helium Portfolio
11th Dec 20247:00 amRNSUpdate on former JV Partner’s Insolvency Process
9th Dec 20247:00 amRNSNew Joint Venture & Board Changes
29th Oct 20243:53 pmRNSHolding(s) in Company
23rd Oct 20241:25 pmRNSHolding(s) in Company

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.