Cobus Loots, CEO of Pan African Resources, on delivering sector-leading returns for shareholders. Watch the video here.

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksAsiamet Res Regulatory News (ARS)

Share Price Information for Asiamet Res (ARS)

London Stock Exchange
Share Price is delayed by 15 minutes
Get Live Data
Share Price: 1.35
Bid: 1.30
Ask: 1.40
Change: 0.00 (0.00%)
Spread: 0.10 (7.692%)
Open: 1.35
High: 1.35
Low: 1.35
Prev. Close: 1.35
ARS Live PriceLast checked at -

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

Kalimantan Gold - KSK Copper Project Update

22 Aug 2013 07:00

Kalimantan Gold Corporation Limited (TSX-V:KLG) (LSE:KLG) is pleased to announce the latest drill and assay results from holes drilled at the Beruang Kanan, Mamuring, Low Zone and Bukit Dea projects together with the commencement of an airborne magnetic and gravity gradiometer survey.

HIGHLIGHTS:

High grade copper at Beruang Kanan. Definition drilling continues to intersect significant copper mineralization at the Beruang Kanan Prospect, including: BK057-01 returned 60.50 meters @ 0.65% Cu, from 7.7 meters Including 22.5 meters @ 1.27% Cu, from 7.7 meters BK058-01 returned 64.9 meters @ 1.24% Cu, from 2.30 meters Including 33 meters @ 2.29% Cu, from 11.7 meters Including 9 meters @ 7.35% Cu, from 11.7 meters

BK058 @ 107.70m showing high grade chalcopyrite mineralization: http://www.usetdas.com/pr/BK058a.jpg

BK58 @20m semi-massive chalcopyrite and covellite mineralization: http://www.usetdas.com/pr/BK058b.jpg

Deep drilling is ongoing at the Tumbang Huoi and Baroi prospects Commencement of a 5000 km airborne gravity gradiometer and magnetic survey

Beruang Kanan

Two of the recently completed Beruang Kanan holes (BK057 & BK058) focused on the area where BK5 was drilled, an historic KLG drill hole. BK5 intersected a zone of chalcopyrite-dominated copper mineralization previously reported at 102m @ 0.62% Cu (from 3m depth) and including 63m @ 0.75% Cu. The recently completed BK057 & BK058 holes also intersected near-surface copper mineralization defining a zone of shallow dipping (15 degrees) copper mineralization extending for at least 220m east of BK5, and open in all directions. Final assay results completed for the definition drilling at Beruang Kanan since our announcement on 10 June 2013 are tabled below.

Beruang Kanan Prospect (based on a 0.1% cutoff)

Hole ID Azimuth/ From To Length Cu Comments
Dip (m) (m) (m) (%)
BK051-01 270/-60 NSA NSA NSA NSA

Breccia andvein hostedcoppermineralization(VHMS-Style)

BK052-01 270/-60 87.2 108.2 21 0.23
Including 270/-60 93.2 102.5 9.3 0.30
BK053-01 270/-60 NSA NSA NSA NSA
BK054-01 270/-60 36 97 61 0.26
Including 45 58.5 13.5 0.55
BK055-01 270/-60 82.9 122 39.1 0.25
BK055-01 270/-60 194.4 197.4 3 2.09
BK056-01 270/-60 NSA NSA NSA NSA
BK057-01 270/-60 7.7 68.2 60.5 0.65
Including 7.7 30.2 22.5 1.27
BK057-01 270/-60 153.2 165.2 12 0.31
BK058-01 270/-60 2.3 67.2 64.9 1.24
Including 11.7 32.7 21 3.42
Including 11.7 20.7 9 7.35
BK058-01 270/-60 103.2 133.3 30.1 0.41
Hole locations are indicated on the map further below. True thicknesses of intercepts cannot be determined. *NSA – no significant assays

This extension of the copper sulfide mineralization at Beruang Kanan supports the current exploration model of the Beruang Kanan prospect as a VHMS system. Detailed drilling indicates that the semi-massive, vein- and breccia-hosted, disseminated and stockwork VHMS-style copper mineralization has a strike length of at least 900m (N-S dimension), is laterally extensive for 100m to 235m and is up to 80m thick.

The extension of mineralization intersected in BK5, located on a E-W section 250m south of the area of detailed drilling, indicates that copper mineralization continues to the south of the area of detailed drilling.

Beruang Kanan Drill Program: http://www.usetdas.com/pr/beruangkanan.jpg

Mamuring

A deep diamond drill hole (MRD02-01) at Mamuring prospect intersected deep-seated gold mineralization associated with late quartz – pyrite veins. Significant assays are tabled below:

Mamuring Deep Drilling (based on a 0.1g/t cutoff)
Hole ID Azimuth/

Dip

From(m) To(m) Length(m) Au(g/t) Comments
MRD02-01 55/-55 868.7 1162 293.3 0.40

Goldmineralization inquartz-sulfideveins

including 55/-55 916.7 925.7 9.0 0.86
including 55/-55 940.7 964.7 24.0 0.44
including 55/-55 976.7 979.7 3.0 6.01
including 55/-55 1018.7 1042.7 24.0 0.89
including 55/-55 1070 1073 3.0 5.14

True thicknesses of intercepts cannot be determined.

Low Zone

At Low Zone, two 600 meter holes (LZ01-01 and LZ02-0) targeting IP and soil geochemical anomalies respectively have been completed. Both holes intercepted abundant pyrite mineralization hosted within a sequence of interbedded volcanic and sedimentary rocks. No significant copper or gold assays to report.

Bukit Dea

A single drill hole completed at the Bukit Dea prospect returned narrow zones of elevated gold geochemistry. KLG is currently evaluating surface data and drilling results to determine if the hole actually pierced the zone of high-grade gold mineralization that was defined by surface rock chip sampling.

Baroi & Tumbang Huoi

Drilling is now well underway at the Baroi and Tumbang Huoi prospects. At Baroi one deep hole BRD01-01 and one shallow hole BB08-01 have been completed. Drill hole BF51-01 targeting 600 meters is in progress, meanwhile at Tumbang Huoi one deep hole and one shallow hole have been completed, with results pending.

Looking Ahead:

The drilling program at KSK CoW will be suspended after the current drill holes are completed. Currently a Bell Geospace DC3 aircraft is conducting an airborne gravity gradiometer and magnetic survey. The survey will cover the entire KSK CoW and will be flown at 200 meter line spacings, with 100 meter in-fill lines over KLG’s priority prospects. The survey is expected to take 4-6 weeks to complete and results will be used to optimize drill plans and identify additional exploration targets.

The 3D inversion modeling of airborne gravity and magnetic data is expected to assist in defining the Beruang Kanan VHMS-system and, combined with recent drilling results, will help KLG refine and focus the future drilling program.

During this period field mapping and sampling programs will continue at Mansur, Baroi and Tumbang Huoi prospects, and the senior geology team will also focus on compilation and evaluation of the enormous amount of data collected over the past 15 months. In addition, a Resistivity / IP survey (using a down-hole radial electrode array) will be conducted in several of the deep holes at Beruang Kanan and Beruang Tengah.

Over the next several months we will focus on re-logging campaigns of drill core in the framework of our expanded understanding of the district geology that was derived from the past 15 months of intensive effort. This pause in drilling activity will allow KLG’s 16 geologists time to evaluate the down hole IP survey and gravity survey results. Once the new data is processed it will allow KLG to refocus the next phase of exploration efforts in the CoW.

Our 2013 exploration program budget of $16.2m announced in the Feb 19, 2013 press release will be maintained or exceeded.

Faldi Ismail, KLG’s Chief Operating Officer stated: "We are extremely pleased with the BK057 and BK058 drill results, which confirm the presence of additional copper zones at the Beruang Kanan project area. We need this breather to properly analyze and interpret the enormous data set we have collected over the past 15 months to ensure every hole we drill is well placed. The next phase of drilling, in addition to our other main porphyry target areas, will include focusing on expanding the BK5 zone at Beruang Kanan and will continue to extend the broader zone of disseminated and vein hosted copper mineralization to the north, south and west.”

All data, as disclosed in this press release, has been reviewed and verified by the Company's Qualified Person for the KSK Project, Dr. Peter Pollard, who is a Member of the Australasian Institute of Mining and Metallurgy (Chartered Professional). Dr Pollard acts as a technical consultant and non executive chairman to KLG and has sufficient experience which is relevant to the style of mineralization and type of deposit under consideration and to the activity he is undertaking to qualify as a Competent Person under the JORC Code.

For further information please contact:Faldi IsmailDeputy Chairman and CEO, Kalimantan GoldMobile: +61 (0) 423 206 324Email: faldi.ismail@kalimantan.com

Gerald CheyneDirector Corporate DevelopmentTelephone: +44 (0) 2077311806Mobile: +44 (0) 7717473168Email: gerald.cheyne@kalimantan.com

VSA Capital LimitedKatrina Damouni/ Peter DamouniTelephone: +44 20 3005 5005/ +44 20 3005 5007Email: pdamouni@vsacapital.com

KLG's Nominated AdviserRFC Ambrian LimitedStuart LaingTelephone: +61 8 9480 2506Email: stuart.laing@rfcambrian.com

About Kalimantan GoldKalimantan Gold Corporation Limited is a junior exploration company listed on both the TSX Venture Exchange in Canada and on AIM in London. The Company has two exploration projects in Kalimantan: the Jelai epithermal gold project in East Kalimantan and the KSK Contract of Work in Central Kalimantan with potential for multiple porphyry copper and gold prospects. For further information please visit www.kalimantan.com

http://www.usetdas.com/pr/jeliaproject.jpg

Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.This news release contains forward-looking statements that are based on the Company’s current expectations and estimates. Forward-looking statements are frequently characterized by words such as “plan”, “expect”, “project”, “intend”, “believe”, “anticipate”, “estimate”, “suggest”, “indicate” and other similar words or statements that certain events or conditions “may” or “will” occur. Such forward-looking statements involve known and unknown risks, uncertainties and other factors that could cause actual events or results to differ materially from estimated or anticipated events or results implied or expressed in such forward-looking statements. Such factors include, among others: the actual results of current exploration activities; conclusions of economic evaluations; changes in project parameters as plans continue to be refined; possible variations in ore grade or recovery rates; accidents, labour disputes and other risks of the mining industry; delays in obtaining governmental approvals or financing; and fluctuations in metal prices. There may be other factors that cause actions, events or results not to be as anticipated, estimated or intended. Any forward-looking statement speaks only as of the date on which it is made and, except as may be required by applicable securities laws, the Company disclaims any intent or obligation to update any forward-looking statement, whether as a result of new information, future events or results or otherwise. Forward-looking statements are not guarantees of future performance and accordingly undue reliance should not be put on such statements due to the inherent uncertainty therein.

Copyright Business Wire 2013

Date   Source Headline
18th Oct 201811:46 amRNSIntersects Broad Copper Intervals at Beutong
18th Oct 201811:45 amRNSPlans Additional Drilling to Enhance BKM BFS
25th Sep 201811:00 amRNSInterim Results
29th Aug 20187:00 amRNSDrilling Expands Beutong West Copper Deposit
21st Aug 201810:00 amRNSAppointment of Berenberg as Joint Corporate Broker
10th Aug 201810:00 amRNSBankable Feasibility Study Update
7th Aug 20187:15 amRNSDrilling Extends Beutong Copper Mineralisation
19th Jul 20184:30 pmRNSExercise of Options
12th Jul 20188:03 amRNSAppointment of Executive VP - External Relations
2nd Jul 20186:00 pmRNSExercise of Options and Warrants - Replacement
2nd Jul 201812:40 pmRNSExercise of Options and Warrants
26th Jun 20187:00 amRNSAppointment of Director
25th Jun 201810:30 amRNSResult of AGM
25th Jun 20187:00 amRNSLifts Beutong Copper-Gold Project Interest to 80%
22nd Jun 201810:57 amRNSAttendance at Mining Journal Select Conference
14th Jun 201810:21 amRNSIntersects 456m of Cu mineralisation at Beutong
6th Jun 201812:00 pmRNSExercise of Options
1st Jun 201811:45 amRNSDirector Appointment
25th May 20185:00 pmRNSNotice of Annual General Meeting
24th May 20188:00 amRNSDirector Changes
16th May 20187:00 amRNSInitial Mineral Resource Estimate for BKZ Deposit
2nd May 20182:30 pmRNSExercise of Options
27th Apr 20189:00 amRNS2017 Annual Report & Financial Statements
18th Apr 20183:30 pmRNSBroker Warrants Exercised
16th Apr 20183:10 pmRNSAsiamet April Investor Events - Birmingham, London
16th Apr 201811:15 amRNSIntersects High Grade Mineralisation at Beutong
3rd Apr 201811:19 amRNSReports BKM Geotech Results - Replacement
3rd Apr 20187:30 amRNSReports Assay Results for BKM Geotech Holes
29th Mar 20185:00 pmRNSExercise of Options
28th Mar 201810:25 amRNSBKZ Delivers Outstanding Mineralisation
26th Mar 20189:35 amRNSSecures long term tenure for BKM Copper Project
19th Mar 201812:49 pmRNSBKZ Drilling Intersects High Grade Mineralisation
13th Mar 20186:15 pmRNSSuccessful Placing of £7.2 Million
13th Mar 201812:15 pmRNSPlacing to Raise up to £7.2 Million
9th Mar 201810:30 amRNSExercise of Options
1st Mar 201812:00 pmRNSCorporate Broker Appointment
1st Mar 20187:30 amRNSCommences Drilling Beutong Copper-Gold Deposit
28th Feb 20187:20 amRNSmetallurgical tests confirm positive results
22nd Feb 20181:35 pmRNSIntersects Further High-Grade Zinc, Lead, Copper
13th Feb 20181:00 pmRNSExercise of Options
6th Feb 20187:00 amRNSIntersects High Grade Copper Mineralisation at BKZ
31st Jan 20187:00 amRNSBKZ Delineation Drilling and Plans for Beutong
17th Jan 201811:45 amRNSDirector Resignation
11th Jan 201811:15 amRNSGrant of Options
11th Jan 20189:15 amRNSCommences Resource Drilling at BKZ
8th Jan 20187:00 amRNSProduction Licence for Beutong Project
19th Dec 201710:15 amRNSPositive Metallurgical Test-work Results
29th Nov 20177:00 amRNSIntersects 115.5m at 1% Cu at BK44 Zone
24th Nov 201712:15 pmRNSAppointment of James Deo as CFO
21st Nov 201712:15 pmRNSFurther High-Grade Zn-Pb-Ag at BKZ Deposit

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.