Less Ads, More Data, More Tools Register for FREE

Pin to quick picksAsiamet Resources Limited Regulatory News (ARS)

Share Price Information for Asiamet Resources Limited (ARS)

Share Price is delayed by 15 minutes
Get Live Data
1.425    0.00 (0.00%)
Bid:
1.40
Ask:
1.45
Spread: 0.05 (3.571%)
Market Cap: £48.36m
ARS Live PriceLast checked at - London Stock Exchange

Intraday Asiamet Resources Limited Share Chart

Drilling/Production Report

12 Oct 2016 07:00

ASIAMET RESOURCES LIMITED - Drilling/Production Report

ASIAMET RESOURCES LIMITED - Drilling/Production Report

PR Newswire

London, October 11

BKM Feasibility Study Advancing to Plan – Mining and Geotechnical Studies Underway

TSX Venture Exchange and AIM Symbol: ARS

VANCOUVER, Oct. 12, 2016 /CNW/ - Asiamet Resources Limited ("ARS" or the "Company") is pleased to advise that excellent progress is being made on the Beruang Kanan Main ("BKM") feasibility study.

As the detailed Resource evaluation drilling and metallurgical test work programs are now well advanced (45 holes/4500 metres of planned, 73 holes/6500 metres completed), the Company is ramping up the mine engineering and related infrastructure components of the feasibility study. Australian Mine Design and Development Pty Ltd ("AMDAD") and PT Ground Risk Management ("GRM") have recently been engaged to undertake the mining engineering and geotechnical components of the feasibility study, respectively.

AMDAD has over the past 27 years completed the engineering evaluation, planning and development for many highly successful open pit mine developments in South-east Asia similar to BKM. John Wyche, the principal leading the BKM engagement has over 30 years of evaluation, development and operation experience in open-cut and underground mining across more than 90 projects in Australia, the South Pacific, South East Asia, China, North America, Mexico and West Africa.

AMDAD's scope of work includes open pit optimization, production rate assessments and development scenario analysis. These activities will support the strategic project development decisions being made by the Company in the coming months. More detailed feasibility study work will build upon these studies as results from the current exploration program and metallurgical test-work become available. With improved Resource knowledge, AMDAD will execute the required work to produce feasibility level pit designs, waste rock management and dump designs, mining equipment sizing and selection, mine scheduling, and the estimation of capital and operating costs for the mine.

The geotechnical program will be led by GRM, a highly experienced consultancy that has completed over 100 geotechnical assignments across the Indonesian archipelago in the past eight years, more than 50 of which have been based in Kalimantan where the BKM copper deposit is located. Simon Ballantyne, the GRM principal leading the BKM program, is a recognized industry leader in the geotechnical field.

GRM will implement a program of data collation, detailed mapping, geotechnical logging and laboratory testing to develop a robust geotechnical database for open pit mine engineering including assessments and recommendations on waste dumps. They will also provide geotechnical input into the infrastructure location studies being conducted. With the assistance of site surveys, this key input will allow the project team to establish an optimal site layout for the process plant and related infrastructure. GRM are also assisting with the hydrogeological components of the feasibility study, working with company personnel and other project consultants to establish an appropriate groundwater evaluation and management program.

PT Lorax, engaged for the Environmental, Geoscience and Hydrology aspects of the feasibility study (as per ARS Press Release on 7 July 2016), has recently completed field activities for the dry season flora and fauna survey and the dry season aquatic ecology study. The rock geochemical characterization program, also being led by PT Lorax, has continued with static tests for acid rock drainage ("ARD") and metal leaching ("ML") evaluations progressing as planned. Results from 77 samples collected during August will underpin the data analysis for this key aspect of the feasibility study.

Tony Manini, Asiamet's Chief Executive Officer commented:

"The BKM feasibility study represents the most important pre-development de-risking phase for the project, the outcomes of which will be used by a wide range of stakeholders, including investors, financiers, government regulators and local communities, to assess the project's technical, financial, environmental and social viability. In order to ensure we meet or exceed the expectations of our key stakeholder groups it is critically important that all parts of the feasibility studies are completed to high industry standards. Securing the services of such highly experienced consultants for these key areas further strengthens the first-class team we have already assembled to deliver the BKM feasibility study and we look forward to reporting results of the various programs as they become available"

Qualified Person

Data disclosed in this press release have been reviewed and verified by ARS's qualified person, Stephen Hughes, P. Geo, Vice President Exploration of the Company and a Qualified Person within the meaning of NI 43-101 and for the purposes of the AIM Rules.

ON BEHALF OF THE BOARD OF DIRECTORS

Tony Manini, Deputy Chairman and CEO

Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

This news release contains forward-looking statements that are based on the Company's current expectations and estimates. Forward-looking statements are frequently characterized by words such as "plan", "expect", "project", "intend", "believe", "anticipate", "estimate", "suggest", "indicate" and other similar words or statements that certain events or conditions "may" or "will" occur. Such forward-looking statements involve known and unknown risks, uncertainties and other factors that could cause actual events or results to differ materially from estimated or anticipated events or results implied or expressed in such forward-looking statements. Such factors include, among others: the actual results of current exploration activities; conclusions of economic evaluations; changes in project parameters as plans continue to be refined; possible variations in ore grade or recovery rates; accidents, labour disputes and other risks of the mining industry; delays in obtaining governmental approvals or financing; and fluctuations in metal prices. There may be other factors that cause actions, events or results not to be as anticipated, estimated or intended. Any forward-looking statement speaks only as of the date on which it is made and, except as may be required by applicable securities laws, the Company disclaims any intent or obligation to update any forward-looking statement, whether as a result of new information, future events or results or otherwise. Forward-looking statements are not guarantees of future performance and accordingly undue reliance should not be put on such statements due to the inherent uncertainty therein.

 

Tony Manini, Deputy Chairman and CEO, Asiamet Resources Limited, Telephone: +61 3 8644 1300, Email: tony.manini@asiametresources.com; FlowComms Limited, Sasha Sethi, Telephone: +44 (0) 7891 677 441, Email: Sasha@flowcomms.com; Asiamet Resources Nominated Adviser, RFC Ambrian Limited, Andrew Thomson / Oliver Morse, Telephone: +61 8 9480 2500, Email: Andrew.Thomson@rfcambrian.com / Oliver.Morse@rfcambrian.com; VSA Capital Limited, Andrew Raca / Justin McKeegan, Telephone: +44 20 3005 5004 / +44 20 3005 5009, Email: araca@vsacapital.com; Optiva Securities Limited, Christian Dennis, Telephone: +44 20 3137 1903, Email: Christian.Dennis@optivasecurities.com

 

Date   Source Headline
26th May 20265:30 pmRNS2025 Annual Report & Financial Statements
12th Mar 20267:25 amRNSRegulatory Approval Received for KSK Transaction
12th Mar 20267:25 amRNSRegulatory Approval Received for KSK Transaction
29th Jan 20261:30 pmRNSResults of General Meeting
27th Jan 20265:30 pmRNSUpdate on Proposed Sale of Indokal (KSK Project)
17th Dec 20256:08 pmRNSUS$3.1 million Subscription
9th Dec 20251:55 pmRNSResults of Annual General Meeting
27th Nov 202512:45 pmRNSPDMR Dealing
14th Nov 202510:00 amRNSPDMR Dealing
12th Nov 20259:30 amRNSPDMR Dealing
10th Nov 20257:00 amRNSNotice of Annual General Meeting
6th Nov 202510:13 amRNSSale of Asiamet’s Interest in the KSK Project
6th Oct 202510:00 amRNSLong Term Incentive Programme
17th Sep 20257:00 amRNSDirector’s Fees and Employee Share-Based Payments
15th Sep 20257:00 amRNSBKM Copper Project Limestone Drilling Update
29th Aug 20257:00 amRNSInterim Results for Six Months Ended 30 June 2025
15th Aug 20257:00 amRNSLimestone Resource Drilling at BKM Copper Project
11th Aug 20257:00 amRNSAppointment of Project Director for BKM
18th Jul 20257:00 amRNSAppointment of Grant Samuel
15th Jul 20254:00 pmRNSCompletion of Subscription
9th Jul 20257:00 amRNSAppointment of Shore Capital as Corporate Broker
9th Jun 20255:15 pmRNSTR-1: Notification of major holdings
5th Jun 20257:00 amRNSCommencement of BKM Project Financing Process
29th May 20257:21 amRNSUS$2.5 million Subscription
29th May 20257:07 amRNS2024 Annual Report & Financial Statements
20th May 20257:00 amRNS-RBKM Stage 1 OFS – Investor Presentation and Q&A
15th May 20257:00 amRNSCompletion of BKM Feasibility Study ITE Report
7th May 20257:00 amRNSBKM Copper Project Optimised Feasibility Study
2nd May 202512:15 pmRNSUpdated Ore Reserve for BKM Stage 1
24th Apr 20257:00 amRNSPower Study Completes Inputs for Feasibility Study
28th Mar 20257:00 amRNSBKM Optimised Feasibility Study Near Completion
23rd Dec 20243:00 pmRNSBKM Capital Cost Estimate Reduced by US$58 Million
17th Dec 202410:00 amRNSDirector’s Fees and Employee Incentive Payments
26th Nov 202411:30 amRNSAppointment of Head of Corporate Finance
14th Nov 20247:00 amRNSBKM Copper Project Optimisation Works Update
18th Oct 20245:00 pmRNSSuccessful Completion of US$3.55 million Raise
15th Oct 20242:30 pmRNSRetail Offer
15th Oct 20242:25 pmRNSUS$3.3 million Subscription
7th Oct 20247:05 amRNSBoard Changes
30th Sep 202412:00 pmRNSInterim Results for Six Months Ended 30 June 2024
22nd Aug 202411:30 amRNSMaterial Capex Reductions for BKM Copper Project
26th Jun 20244:30 pmRNSResult of AGM
25th Jun 20247:00 amRNSBKM Copper Project Optimisation
3rd Jun 202410:00 amRNSNotice of Annual General Meeting
14th May 20247:00 amRNSBKM Heap Leach Facility Earthworks Optimisation
9th May 202411:45 amRNS2023 Annual Report & Financial Statements
17th Apr 20247:00 amRNSBKM High Grade Copper Rock Sample Results
28th Mar 20247:00 amRNSBKM Project Engineering Design & Execution Update
27th Mar 20247:00 amRNSSustainable Power Solution for BKM Copper Project
1st Mar 20247:04 amRNSCorporate Update

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.