Less Ads, More Data, More Tools Register for FREE

Pin to quick picksAsiamet Resources Limited Regulatory News (ARS)

Share Price Information for Asiamet Resources Limited (ARS)

Share Price is delayed by 15 minutes
Get Live Data
1.425    0.00 (0.00%)
Bid:
1.40
Ask:
1.45
Spread: 0.05 (3.571%)
Market Cap: £48.36m
ARS Live PriceLast checked at - London Stock Exchange

Intraday Asiamet Resources Limited Share Chart

BKM Project Engineering Design & Execution Update

28 Mar 2024 07:00

RNS Number : 6716I
Asiamet Resources Limited
28 March 2024
 

28 March 2024 

 

BKM Project Engineering Design and Execution Update

 

Asiamet Resources Limited ("Asiamet" or the "Company") announces a further update in relation to the Company's wholly owned, development stage, BKM copper project located in Central Kalimantan, Indonesia ("BKM" or the "BKM Copper Project").

Highlights

· Early EPC Engagement: Asiamet has engages project execution partners for engineering, procurement, and construction, optimising project integration and cost estimation accuracy. Specific focus on critical path project engineering activities.

· Execution Partners Appointed: PT Rexline Engineering Indonesia selected for comprehensive engineering design covering materials handling and non-process related infrastructure elements, ensuring continuity and cost efficiency.

Beijing Research Institute of Mining and Metallurgy engaged for process infrastructure engineering, leveraging expertise from prior successful collaboration.

· Further contractor Engagement and Project Management: engagement progressing with contractor for site earthworks, pre-production development, and mining services, prioritising early engagement for cohesive project execution. Partnerships to strengthen project management capabilities, enhancing efficiency in scheduling, cost estimation, and planning.

Engineering Design & Development Strategy

As previously indicated, in response to feedback from the Independent Technical Expert (ITE) review of the 2023 Feasibility Study ("2023 FS") as part of the debt financing process, the Company has refined its approach to delivering engineering design, procurement and construction and implemented a strategy of engaging partners early to deliver engineering design, procurement and construction execution across various scopes of work for the BKM Project.

This approach enables improved integration of project execution disciplines and an expected increase in accuracy with respect to project capex estimation.

The Company has chosen the following preferred execution partners for delivery of the BKM Project - the work areas referenced cover the entire site-based scope of work:

 

PT Rexline Engineering Indonesia ("Rexline")

Rexline will complete engineering design of the crushing and ore handling system and non-process infrastructure such as the main accommodation camp, site offices, workshop and warehouses. Rexline have significant experience in delivering design and construction of this type of infrastructure in the Central Kalimantan coal industry.

Rexline will provide cost estimation for all construction execution excluding scope related to project bulk earthworks, mine operations infrastructure development and pre-production mine operations.

 

Beijing Research Institute of Mining and Metallurgy ("BGRIMM")

BGRIMM will deliver engineering for the Solvent Extraction, Electrowinning, Water Treatment ("SX-EW") and Reagent Preparation process infrastructure. This is a continuation of engagement with BGRIMM from the 2023 FS update.

The SX-EW plant is a critical component of the BKM processing facility as it delivers the processes of metal purification and copper metal production.

The BGRIMM Group has over six decades of experience, specialising in technology and innovation in the mining sector. BGRIMM's core strength and competitive advantage is in engineering design, procurement and equipment manufacturing. Their input into this project is an important part of the overall design and will positively impact costs through their purchasing power. BGRIMM have provided engineering design and procurement for several SX-EW facilities in various countries (such as Central Asian Metals' Kounrad facility in Kazakhstan) and are familiar with engineering design requirements of Indonesia given their association with several past and current projects in the country.

 

Further Contractor Engagement

The Company is advancing discussions with a highly reputable contractor capable of delivering the project site earthworks, mine pre-production development, mine operations infrastructure and mining services at least for the first 5 years of the project life. This strategy differs from the 2023 FS, in that separate contractors were engaged to provide quotes for the cost of project earthworks and mining operations. The Company is committing to an integrated approach of project and operations earthworks to leverage the use of common mobile equipment fleet. Further details of this contractor engagement will be provided as they become available.

The Company is engaging with suitable partners capable of providing project management support updating key project execution deliverables such as project schedule, capex estimate and project execution planning.

 

BKM Copper Project Optimisation

An improved heap leach facility location has been proposed and detailed modelling of a new facility layout is underway through engagement of Chilean expert heap leach design group Minera and Servicos (M&S). The outcome of this work will be communicated in Q2 2024.

Optimisation of engineering resources and costs, along with low-cost equipment and materials sourcing will be realised through the aforementioned project partner engagement strategy.

A recent review of site access road earthworks and local equipment hire costs indicates significant potential savings on this activity are possible relative to the 2023 FS. A detailed inspection and further refinement of the cost estimate will be undertaken in April 2024.

 

Darryn McClelland, Chief Executive Officer, commented:

"Our approach to project execution for BKM has evolved, taking into consideration feedback from the ITE as well as the positive outcomes realised in the 2023 FS, by engaging early with our preferred project execution partners.

"I am pleased to be able to confirm Rexline and BGRIMM as two of our major partners, who will be working with us to deliver a highly cost effective BKM Copper Project. Both Rexline and BGRIMM were instrumental in delivering low capital cost outcomes for the 2023 FS and I look forward to working with them on delivering Indonesia's newest copper mine. News on the engagement of our project earthworks contractor will also be provided in due course.

"Effective project execution in the mining industry remains a priority focus and it is essential that we advance the BKM Project in a manner that optimises management of risk for all stakeholders.. Involving EPC partners early significantly reduces project execution risk and aligns with key requirements outlined in the ITE feedback during the debt financing process.

 

"The positive trajectory of copper prices and growing market optimism regarding copper's supply / demand dynamics underscore the strategic significance and inherent value of our assets. Our advanced projects and high-quality JORC compliant copper resources at both projects are attracting significant inbound interest, and with the mobilisation of execution partners the BKM copper cathode project takes a further step towards financing and production. Shareholders should expect further updates as our efforts intensify."

 

 

ON BEHALF OF THE BOARD OF DIRECTORS

Darryn McClelland, Chief Executive Officer

-Ends-

 

For further information, please contact:

 

Darryn McClelland Chief Executive Officer, Asiamet Resources LimitedEmail: darryn.mcclelland@asiametresources.com

 

Tony Manini Executive Chairman, Asiamet Resources LimitedEmail: tony.manini@asiametresources.com

 

Investor Enquiries

Sasha Sethi

Telephone: +44 (0) 7891 677 441

Email: Sasha@flowcomms.com / info@asiametresources.com

Nominated & Financial Adviser Strand Hanson Limited

James Spinney / James Dance / Rob Patrick

Telephone: +44 20 7409 3494

Email: asiamet@strandhanson.co.uk

  

Broker

Optiva Securities Limited Christian Dennis

Telephone: +44 20 3137 1903

Email: Christian.Dennis@optivasecurities.com

 

Follow us on twitter @AsiametTweets

 

FORWARD-LOOKING STATEMENT

This news release contains forward-looking statements that are based on the Company's current expectations and estimates. Forward-looking statements are frequently characterised by words such as "plan", "expect", "project", "intend", "believe", "anticipate", "estimate", "suggest", "indicate" and other similar words or statements that certain events or conditions "may" or "will" occur. Such forward-looking statements involve known and unknown risks, uncertainties and other factors that could cause actual events or results to differ materially from estimated or anticipated events or results implied or expressed in such forward-looking statements. Such factors include, among others: the actual results of current exploration activities; conclusions of economic evaluations; changes in project parameters as plans continue to be refined; possible variations in ore grade or recovery rates; accidents, labour disputes and other risks of the mining industry; delays in obtaining governmental approvals or financing; and fluctuations in metal prices. There may be other factors that cause actions, events or results not to be as anticipated, estimated or intended. Any forward-looking statement speaks only as of the date on which it is made and, except as may be required by applicable securities laws, the Company disclaims any intent or obligation to update any forward-looking statement, whether as a result of new information, future events or results or otherwise. Forward-looking statements are not guarantees of future performance and accordingly undue reliance should not be put on such statements due to the inherent uncertainty therein.

 

 

 

 

This information is provided by RNS, the news service of the London Stock Exchange. RNS is approved by the Financial Conduct Authority to act as a Primary Information Provider in the United Kingdom. Terms and conditions relating to the use and distribution of this information may apply. For further information, please contact rns@lseg.com or visit www.rns.com.RNS may use your IP address to confirm compliance with the terms and conditions, to analyse how you engage with the information contained in this communication, and to share such analysis on an anonymised basis with others as part of our commercial services. For further information about how RNS and the London Stock Exchange use the personal data you provide us, please see our Privacy Policy.
 
END
 
 
UPDEAKDPASLLEEA
Date   Source Headline
26th May 20265:30 pmRNS2025 Annual Report & Financial Statements
12th Mar 20267:25 amRNSRegulatory Approval Received for KSK Transaction
12th Mar 20267:25 amRNSRegulatory Approval Received for KSK Transaction
29th Jan 20261:30 pmRNSResults of General Meeting
27th Jan 20265:30 pmRNSUpdate on Proposed Sale of Indokal (KSK Project)
17th Dec 20256:08 pmRNSUS$3.1 million Subscription
9th Dec 20251:55 pmRNSResults of Annual General Meeting
27th Nov 202512:45 pmRNSPDMR Dealing
14th Nov 202510:00 amRNSPDMR Dealing
12th Nov 20259:30 amRNSPDMR Dealing
10th Nov 20257:00 amRNSNotice of Annual General Meeting
6th Nov 202510:13 amRNSSale of Asiamet’s Interest in the KSK Project
6th Oct 202510:00 amRNSLong Term Incentive Programme
17th Sep 20257:00 amRNSDirector’s Fees and Employee Share-Based Payments
15th Sep 20257:00 amRNSBKM Copper Project Limestone Drilling Update
29th Aug 20257:00 amRNSInterim Results for Six Months Ended 30 June 2025
15th Aug 20257:00 amRNSLimestone Resource Drilling at BKM Copper Project
11th Aug 20257:00 amRNSAppointment of Project Director for BKM
18th Jul 20257:00 amRNSAppointment of Grant Samuel
15th Jul 20254:00 pmRNSCompletion of Subscription
9th Jul 20257:00 amRNSAppointment of Shore Capital as Corporate Broker
9th Jun 20255:15 pmRNSTR-1: Notification of major holdings
5th Jun 20257:00 amRNSCommencement of BKM Project Financing Process
29th May 20257:21 amRNSUS$2.5 million Subscription
29th May 20257:07 amRNS2024 Annual Report & Financial Statements
20th May 20257:00 amRNS-RBKM Stage 1 OFS – Investor Presentation and Q&A
15th May 20257:00 amRNSCompletion of BKM Feasibility Study ITE Report
7th May 20257:00 amRNSBKM Copper Project Optimised Feasibility Study
2nd May 202512:15 pmRNSUpdated Ore Reserve for BKM Stage 1
24th Apr 20257:00 amRNSPower Study Completes Inputs for Feasibility Study
28th Mar 20257:00 amRNSBKM Optimised Feasibility Study Near Completion
23rd Dec 20243:00 pmRNSBKM Capital Cost Estimate Reduced by US$58 Million
17th Dec 202410:00 amRNSDirector’s Fees and Employee Incentive Payments
26th Nov 202411:30 amRNSAppointment of Head of Corporate Finance
14th Nov 20247:00 amRNSBKM Copper Project Optimisation Works Update
18th Oct 20245:00 pmRNSSuccessful Completion of US$3.55 million Raise
15th Oct 20242:30 pmRNSRetail Offer
15th Oct 20242:25 pmRNSUS$3.3 million Subscription
7th Oct 20247:05 amRNSBoard Changes
30th Sep 202412:00 pmRNSInterim Results for Six Months Ended 30 June 2024
22nd Aug 202411:30 amRNSMaterial Capex Reductions for BKM Copper Project
26th Jun 20244:30 pmRNSResult of AGM
25th Jun 20247:00 amRNSBKM Copper Project Optimisation
3rd Jun 202410:00 amRNSNotice of Annual General Meeting
14th May 20247:00 amRNSBKM Heap Leach Facility Earthworks Optimisation
9th May 202411:45 amRNS2023 Annual Report & Financial Statements
17th Apr 20247:00 amRNSBKM High Grade Copper Rock Sample Results
28th Mar 20247:00 amRNSBKM Project Engineering Design & Execution Update
27th Mar 20247:00 amRNSSustainable Power Solution for BKM Copper Project
1st Mar 20247:04 amRNSCorporate Update

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.