The latest Investing Matters Podcast episode with London Stock Exchange Group's Chris Mayo has just been released. Listen here

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksAsiamet Res Regulatory News (ARS)

Share Price Information for Asiamet Res (ARS)

London Stock Exchange
Share Price is delayed by 15 minutes
Get Live Data
Share Price: 1.05
Bid: 1.00
Ask: 1.10
Change: -0.075 (-6.67%)
Spread: 0.10 (10.00%)
Open: 1.125
High: 1.125
Low: 1.05
Prev. Close: 1.125
ARS Live PriceLast checked at -

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

Asiamet intersects strong Gold-Silver at BKZ

24 Nov 2021 07:00

RNS Number : 4250T
Asiamet Resources Limited
24 November 2021
 

24 November 2021

 

Asiamet intersects strong Gold-Silver at BKZ Copper-Zinc-Precious Metals Deposit

 

Asiamet Resources Limited ("Asiamet" or the "Company") is pleased to announce further strong results from recent drilling completed as part of the Company's 2021 Resource extension program at the BKZ deposit located on its KSK Contract of Work (KSK CoW) in Central Kalimantan, Indonesia.

Drilling at BKZ continues to return high grade Zinc-Lead-Copper-Silver-Gold (Zn-Pb-Cu-Ag-Au) mineralisation and most recently also intersected strong gold-silver dominant mineralisation immediately to the east and below the base metal horizons including 29m at 4.59g/t Au, 161g/t Ag.

All holes completed in the current program have intersected significant mineralization and expanded the BKZ Mineral Resource envelope which remains open in several directions. Mineralisation is shallow and projects from near surface down to approximately 200m. Results are pending on a further five holes.

The Company is confident that ongoing drilling will continue to expand the mineral inventory and economic value of the KSK licence and as such the drill program has now been expanded from 3,000 metres to 4,500 metres to further follow up some of the key high-grade trends observed.

 

Assay result highlights for recently completed drill holes:

 

· BKZ33650-09

· 7 metres @ 3.67% Zn, 1.86% Pb, 61g/t Ag from 110 metres

· 14.5 metres @ 1.77% Pb, 110g/t Ag, 0.55 g/t Au from 117 metres

· 29 metres @ 4.59g/t Au, 161 g/t Ag, 0.74% Pb, 66 g/t Mo from 157.5 metres

· 9.1 metres @ 0.97g/t Au, 31g/t Ag from 190.5 metres

 

· BKZ33750-08

· 7 metres @ 3.6% Zn, 1.1% Pb, 43g/t Ag, 0.1% Cu from 100 metres

· 73.4 metres @ 0.65g/t Au, 64g/t Ag, 0.66% Pb from 127 metres, incl. 16m @ 1.13g/t Au, 130g/t Ag, 1.1% Pb

 

· BKZ33600-07

· 6 metres @ 12.7% Zn, 4.3% Pb, 0.54% Cu, 162g/t Ag from 50 metres

· 18 metres @ 1.28% Cu, 1.06% Pb, 12.6g/t Ag, 0.23g/t Au from 79 metres

 

· BKZ33500-03

· 13 metres @ 1.26% Zn, 0.24% Cu, 8.7g/t Ag from 56.5 metres

· 25 metres @ 2.06% Cu, 9g/t Ag from 97 metres

 

· BKZ33500-02

· 10.2 metres @ 6.8% Zn, 2.3% Pb, 41g/t Ag from 71.8 metres

· 7 metres @ 1.0% Cu, 47g/t Ag, from 184.5 metres

 

Tony Manini, Executive Chairman of Asiamet Resources commented: 

"The 2021 Resource expansion program has significantly exceeded our expectations. As drilling continues to deliver exceptional high-grade zinc and copper dominant polymetallic results which expand the current BKZ Resource envelope, the recent discovery of strong precious metals consistent with zonation commonly observed in other gold rich VHMS systems, provides strong supporting evidence that the BKZ and BKM deposits are part of a single 3km long VHMS system which will continue to grow. Most importantly these results provide significant optionality for a longer mine life which further enhances the value of the BKM project and the wider KSK Contract of Work."

 

 

BKZ Drilling

 

Following on from the previously reported (see news release 19 October 2021) drill hole assay results intersected on sections 9933550N, 9933650N, 9933700N and 9933750N, drilling continues to return impressive results which expand the Resource envelope at the BKZ polymetallic VHMS deposit. Significant assay results are reported in this release from sections 9933500N, 9933600N, 9933650N and 9933750N. Three distinct styles of mineralisation have now been intersected at BKZ.

 

1. Upper Polymetallic Zinc-Lead-Silver+/-Copper mineralisation

The Upper Polymetallic Zinc-Lead-Silver mineralisation is hosted in bedded sediments overlying the Lower Copper-Silver Mineralised horizon and was intersected in drillholes BKZ33600-07 (6m @12.7% Zn, 4.3% Pb, 0.54% Cu, 162g/t Ag) BKZ33500-02 (10.2m @6.8% Zn, 2.3% Pb, 41g/t Ag), BKZ33650 -09 (7m @ 3.67% Zn, 1.86% Pb, 61g/t Ag), BKZ33750-08 (7m@3.6 % Zn, 1.1% Pb, 43g/t Ag)

 

2. Lower Copper Mineralisation

The copper rich part of VHMS deposits is generally interpreted to be part of the structurally controlled feeder to mineralization and is typically comprised of stockwork quartz, pyrite and chalcopyrite copper mineralisation. The Lower Copper zone at BKZ was intersected in drillholes BKZ33600-07 and BKZ33500 -03 which reported 18m@1.28% Cu, 1.06% Pb, 12g/t Ag, 0.23g/t Au and 25m@2.06% Cu, 9g/t Ag (Figure 1) respectively.

 

Figure 1. High grade lower copper zone mineralization in hole BKZ33650-07 To view the image, please click on the following link https://asiametresources.com/wp-content/uploads/2021/11/Figure-1.jpg

3. Gold-Silver Mineralisation

A new style of gold-silver mineralisation was intersected immediately to the east of the Upper Zinc Lead Silver and Lower Copper mineralisation in drill holes BKZ33650-09 and BKZ33750-08. Hole BKZ33650-09 intersected 29m @ 4.59g/t Au, 161 g/t Ag, 0.74% Pb, 66 g/t Mo from 157.5m and 9.1m @ 0.97g/t Au, 31g/t Ag from 190.5m. BKZ33750-08 intersected 73.4 metres @ 0.65g/t Au, 64g/t Ag, 0.66% Pb % Zn, from 127m. Refer figures 2 and 3 below.

 

Figure 2: BKZ Drill Section 9933650N - Assay Results To view the image, please click on the following link https://asiametresources.com/wp-content/uploads/2021/11/Figure-2.jpg

Figure 3: BKZ Drill Section 9933750N - Assay Results To view the image, please click on the following link https://asiametresources.com/wp-content/uploads/2021/11/Figure-3.jpg

Qualified Persons

Data disclosed in this press release has been reviewed and verified by Asiamet's qualified person, Patrick Creenaune, Chief Geologist, FAIG (Fellow Australian Institute of Geoscientists), an advisor to the Company and a Qualified Person within the meaning of JORC (2012) and for the purposes of the AIM Rules for Companies.

 

ON BEHALF OF THE BOARD OF DIRECTORS

Tony Manini, Executive Chairman

For further information, please contact:-Ends-

Tony ManiniExecutive Chairman, Asiamet Resources LimitedEmail: tony.manini@asiametresources.com

 

Investor Enquiries

Sasha Sethi

Telephone: +44 (0) 7891 677 441

Email: Sasha@flowcomms.com / info@asiametresources.com

Asiamet Resources Nominated AdviserRFC Ambrian Limited

Bhavesh Patel / Stephen Allen

Telephone: +44 (0)20 3440 6800

Email: Bhavesh.Patel@rfcambrian.com / Stephen.Allen@rfcambrian.com 

 

Optiva Securities LimitedChristian Dennis

Telephone: +44 20 3137 1903

Email: Christian.Dennis@optivasecurities.com

Follow us on twitter @AsiametTweets

 

 

 

 

This information is provided by RNS, the news service of the London Stock Exchange. RNS is approved by the Financial Conduct Authority to act as a Primary Information Provider in the United Kingdom. Terms and conditions relating to the use and distribution of this information may apply. For further information, please contact rns@lseg.com or visit www.rns.com.RNS may use your IP address to confirm compliance with the terms and conditions, to analyse how you engage with the information contained in this communication, and to share such analysis on an anonymised basis with others as part of our commercial services. For further information about how RNS and the London Stock Exchange use the personal data you provide us, please see our Privacy Policy.
 
END
 
 
UPDBIBFTMTITMAB
Date   Source Headline
21st Nov 201712:15 pmRNSFurther High-Grade Zn-Pb-Ag at BKZ Deposit
13th Nov 20178:40 amEQSAsiamet Extends High Grade Copper Mineralisation Beneath BKZ Zn-Pb-Cu-Ag-Au Deposit
1st Nov 201711:32 amEQSAsiamet Intersects High Grade Copper Below BKZ Polymetallic Deposit
25th Oct 20177:02 amEQSAsiamet Appoints Ausenco
20th Oct 20179:02 amEQSAsiamet Resources Ltd.: Broker Warrants Exercised
18th Oct 20177:02 amEQS30m of 8.3% Zinc at BKZ and Extends High Grade Polymetallic Discovery
11th Oct 20177:02 amEQSExceptional Zn-Pb-Ag-Au Drill Results Upgrade Potential of BKZ Discovery
9th Oct 201712:26 pmEQSAsiamet Resources Ltd.: Grant of Options
6th Oct 201711:16 amEQSBKM Copper Project Feasibility Study Advancing
3rd Oct 20177:02 amEQSAsiamet Resources Ltd.: Asiamet Drilling Expands High Grade Zinc Rich Polymetallic Mineralisation at BKZ
15th Sep 20178:57 amRNSHalf-Year Results 2017 with Management Comments
12th Oct 20167:00 amPRNDirector/PDMR Shareholding
12th Oct 20167:00 amPRNDrilling/Production Report
1st Apr 20157:00 amBUSAGM Statement
15th Jan 20157:00 amBUSAcquisition
29th Dec 20147:00 amBUSIssue of Equity
28th Nov 20147:00 amBUS3rd Quarter Results
26th Nov 20147:00 amBUSKalimantan Gold Positions for Growth
5th Nov 20147:00 amBUSKalimantan Gold Files Technical Report for the Beruang Kanan Prospect, KSK CoW, Indonesia
8th Oct 20147:00 amBUSKalimantan Gold Options Granted
3rd Oct 20145:24 pmBUSTransaction in Own Shares
1st Oct 20147:00 amBUSTransaction in Own Shares
26th Sep 20147:00 amBUSKalimantan Gold Announces Maiden Inferred Mineral Resource Estimate for Beruang Kanan Prospect, KSK CoW, Indonesia
1st Sep 20147:00 amBUSHalf-yearly Report
31st Jul 20147:00 amBUSKSK Copper Project Update
4th Jul 20146:24 pmBUSAGM Statement
3rd Jul 20147:00 amBUSAGM Statement
2nd Jun 20147:00 amBUS1st Quarter Results
16th May 20147:00 amBUSNotice of AGM
30th Apr 20147:00 amBUSAnnual Financial Report
16th Apr 20147:00 amBUSKalimantan Gold Board Changes
26th Mar 20147:00 amBUSKalimantan Gold - Jelai Gold Project
2nd Jan 20147:00 amBUSKalimantan Gold to Regain 100% Control of KSK CoW, Indonesia
10th Dec 20137:00 amBUSKalimantan Gold Clarifies Previous Disclosure Following a Preliminary Technical Disclosure Review By BCSC
29th Nov 20137:00 amBUS3rd Quarter Results
27th Nov 20137:00 amBUSKalimantan Gold Files NI43-101 Report for Jelai Project
12th Nov 20137:00 amBUSKSK Copper Project Update
8th Oct 20137:00 amBUSKalimantan Gold Appoints New CFO
6th Sep 20137:00 amBUSKalimantan’s Chairman, Peter Pollard, increases share position
29th Aug 20137:00 amBUSHalf-yearly Report
22nd Aug 20137:00 amBUSKalimantan Gold - KSK Copper Project Update
4th Jul 20137:00 amBUSKalimantan Gold Board Changes and Option Grant
10th Jun 20137:00 amBUSKSK Copper Project Update
29th May 20137:00 amBUS1st Quarter Results
24th May 20137:00 amBUSNotice of AGM
9th May 20137:00 amBUSKalimantan Gold – New Permit Extends Drilling to All Targeted Areas on the KSK Contract of Work; Progress Made at Jelai
29th Apr 20137:00 amBUSAnnual Financial Report
15th Apr 20137:00 amBUSKalimantan Gold Board Changes and Advance Notice Policy Adopted
19th Feb 20137:00 amBUSKSK Copper Project - High Grade Drilling Results and Major 2013 Drill Program Underway
15th Nov 20127:00 amBUS3rd Quarter Results

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.