Less Ads, More Data, More Tools Register for FREE

Pin to quick picksAmara Mining Regulatory News (AMA)

  • There is currently no data for AMA

Update at Baomahun

18 Apr 2007 07:00

Cluff Gold PLC18 April 2007 Cluff Gold plc ("Cluff Gold" or the "Company") Drilling update at Baomahun Gold Project, Sierra Leone Highlights: • Fold hinge area at Baomahun yields high grade intercepts • Drill hole DDH103 intersects 22 metres grading 11.53g/t Au, including 5m@ 25g/t Au • Data compilation for an interim resource update underway • Second core rig commissioned on 16th April • Drilling rate with second rig to increase to between 300 and 400 metres daily Cluff Gold today announces further encouraging drilling results from theBaomahun Gold Project ('Baomahun') in Sierra Leone, where more than a quarter ofthe planned 30,000 metres of core drilling has been completed. The totalprogramme will consist of 15,000 metres of infill drilling and 15,000 metres ofnew exploration drilling. The infill drilling has been designed to produce a 25 metre spaced grid on theEastern, Central and Western Zones and the focus so far has been on the southernarea of the Central Zone and an area around the eastern limits of theinterpreted fold, between the Central and Eastern Zones. Other drilling hasin-filled between the existing inferred resource drilling on the Central Zone. The exploration drilling is focussed on the identification of possibleextensions to the Western Zone and on the fold-hinge area between the Centraland Eastern Zones. Assay results from several holes drilled in the newfold-hinge area are being received. The fold-hinge area will be included in theinterim resource update currently underway. Below is a summary of some of the additional intersections recorded so far thisyear: Hole ID Dip Azimuth Intercept From (m) To Zone Comment (m) DDH083 60 252 3m @ 9.21g/t 149 152 Central Zone DDH 45 316 5m @ 7.64g/t 71 76 Fold Area094 4m @ 1.03g/t 105 109 Fold Area DDH096 55 342 3m @ 2.15g/t 193 196 Fold Area 15m @ 2.69g/t 229 244 Fold Area Includes 8m @ 4.19g/t DDH 2m @ 3.29g/t 86 88 Fold Area097 DDH 19m @ 6.38g/t 28 47 Fold Area Includes 3m @ 16.89g/t 098 11m @ 1.05g/t 73 84 Fold Area DDH 45 162 Fold Area Results pending099 DDH 55 342 14m @ 3.56g/t 24 38 Fold Area Includes 3m @ 9.53g/t100 DDH101 45 342 6m @ 1.34g/t 184 190 Fold Area DDH Fold Area Results pending102 DDH103 45 58 12m @ 6.12g/t 50 62 Eastern Zone 3m @ 3.27 114 117 Eastern Zone 22m @ 11.53g/t 152 174 Eastern Zone Includes 5m @ 25g/t The second core rig has now been commissioned and Cluff Gold therefore expectsdrilling to increase from this week to a rate of between 300 and 400 metresdaily. The Company also announced recently that it has requested bids from variousconsultants to undertake a pre-feasibility study on Baomahun and the decision onan appointment will be made before the end of April. The study will look at thevarious mine development options and issues raised in the study would beaddressed in a full feasibility study planned for 2008. The pre-feasibilitystudy is planned to be completed in the 4th quarter of 2007. Mr. Douglas Chikohora, Technical Director of Cluff Gold plc comments, "We aredelighted with the latest assay results, particularly from the new fold-hingezone. The high grade intersections further support our belief that Baomahun hassignificant potential to evolve into a substantial gold deposit with furtherexploration and drilling." Qualified Person: Douglas D Chikohora has reviewed the information contained in this announcement.Douglas D Chikohora, Msc, MIMMM, CEng, is the Technical Director of the Company. For further information, please contact: Cluff Gold plcJ.G. Cluff / Douglas ChikohoraChairman / Technical DirectorTel: +44 (0)20 7340 9790 WH Ireland LimitedDavid YoungmanTel: +44 (0)161 832 2174 Parkgreen CommunicationsCathy Malins / Annabel LeatherTel: +44 (0)20 7851 7480 Notes to Editors: The Baomahun Gold Project covers an area of about 137 km-2 and is located about180 kilometres east of Freetown, in the Southern Province of Sierra Leone. Thegeological setting is similar to the Lake Victoria goldfields in Tanzania.According to the terms of a joint venture agreement with the owner of Baomahun,Winston Mines Limited, Cluff Gold has recently completed an earn-in of a 60%interest in the Baomahun prospect by spending US$5 million on exploration /development funding. A JORC resource of 880,000 ounces has so far beendelineated at Baomahun, though 70% of the defined mineralised zone is yet to bedrilled. Cluff Gold expects to provide a revised mineral resource estimatebefore June 2007. This information is provided by RNS The company news service from the London Stock Exchange
Date   Source Headline
9th Oct 20157:00 amRNSDirectors' Dealings
2nd Oct 20157:00 amRNSDirector Dealings
30th Sep 20157:00 amRNSDirector Dealings
17th Sep 20157:00 amRNSYaoure drilling and optimisation update
14th Sep 20157:00 amRNSLaunch of New Website
12th Aug 20157:00 amRNSH1 2015 Results
8th Jun 20154:35 pmRNSPrice Monitoring Extension
8th Jun 201510:36 amRNSDirectors' Dealings
3rd Jun 201512:13 pmRNSResult of AGM
22nd May 20157:00 amRNSSite Visit to the Yaoure Gold Project
18th May 201511:47 amRNSDirectors Dealings
14th May 20157:00 amRNSPre-Feasibility for Yaoure confirms robust returns
6th May 20159:22 amRNSPosting of Annual Report & Accounts
20th Apr 20157:00 amRNSProposed strategic investment by IFC
13th Apr 20157:00 amRNSPRESENTATION AT UK INVESTOR SHOW
8th Apr 20157:00 amRNSYaoure NI 43-101 Technical Report
7th Apr 20157:00 amRNS2014 Audited Full Year Results
13th Mar 20154:40 pmRNSSecond Price Monitoring Extn
13th Mar 20154:35 pmRNSPrice Monitoring Extension
12th Feb 20151:46 pmRNSNotification of Interest in Shares
11th Feb 20151:19 pmRNSHolding(s) in Company
6th Feb 20151:44 pmRNSResults of General Meeting
3rd Feb 20155:10 pmRNSDirector Dealings
21st Jan 20157:00 amRNSResults of Upsized Placing
20th Jan 20154:41 pmRNSPROPOSED PLACING TO RAISE APPROX £13.2M
6th Jan 20157:00 amRNS63% increase in Indicated Resources at Yaoure
4th Dec 20144:40 pmRNSSecond Price Monitoring Extn
4th Dec 20144:35 pmRNSPrice Monitoring Extension
17th Nov 20147:00 amRNSDirectors Dealings
5th Nov 201411:09 amRNSDirector Dealings
5th Nov 20147:00 amRNSFinal drilling results from Yaoure Gold Project
29th Oct 20147:00 amRNSEvent for Private Investors
27th Oct 20144:27 pmRNSDirector Dealing
21st Oct 20147:00 amRNSCompletion of drilling programme at Yaoure
17th Oct 201411:05 amRNSTR-1 Notification of Major Interest in Shares
15th Oct 20147:00 amRNSFurther encouraging drill results from Yaoure
10th Oct 20145:07 pmRNSDirector/PDMR Shareholding
1st Oct 20147:00 amRNSSite Visit to Yaoure Gold Project
29th Sep 20147:00 amRNSYaoure Mineral Resource Update
22nd Sep 20147:00 amRNSYaoure High Grade CMA Zone
10th Sep 201412:25 pmRNSDirector/PDMR Shareholding
9th Sep 20149:55 amRNSGrant of Options
5th Sep 20148:46 amRNSDirector Dealing
3rd Sep 20147:00 amRNSHigh grade drilling results from Yaoure's CMA zone
28th Aug 20147:00 amRNSH1/Q2 2014 Results
13th Aug 20147:00 amRNSExceptional Drilling Results from Yaoure
6th Aug 20147:00 amRNSCessation of Mining at Kalsaka/Sega Gold Mine
6th Aug 20147:00 amRNSFurther encouraging Yaoure drilling results
8th Jul 20147:00 amRNSFurther encouraging Yaoure drilling results
24th Jun 201410:30 amRNSTR-1 Notification of Major Interest in Shares

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.