If you would like to learn more about future focusIR related events and roundtables, please submit your details here

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksAmara Mining Regulatory News (AMA)

  • There is currently no data for AMA

Update at Baomahun

18 Apr 2007 07:00

Cluff Gold PLC18 April 2007 Cluff Gold plc ("Cluff Gold" or the "Company") Drilling update at Baomahun Gold Project, Sierra Leone Highlights: • Fold hinge area at Baomahun yields high grade intercepts • Drill hole DDH103 intersects 22 metres grading 11.53g/t Au, including 5m@ 25g/t Au • Data compilation for an interim resource update underway • Second core rig commissioned on 16th April • Drilling rate with second rig to increase to between 300 and 400 metres daily Cluff Gold today announces further encouraging drilling results from theBaomahun Gold Project ('Baomahun') in Sierra Leone, where more than a quarter ofthe planned 30,000 metres of core drilling has been completed. The totalprogramme will consist of 15,000 metres of infill drilling and 15,000 metres ofnew exploration drilling. The infill drilling has been designed to produce a 25 metre spaced grid on theEastern, Central and Western Zones and the focus so far has been on the southernarea of the Central Zone and an area around the eastern limits of theinterpreted fold, between the Central and Eastern Zones. Other drilling hasin-filled between the existing inferred resource drilling on the Central Zone. The exploration drilling is focussed on the identification of possibleextensions to the Western Zone and on the fold-hinge area between the Centraland Eastern Zones. Assay results from several holes drilled in the newfold-hinge area are being received. The fold-hinge area will be included in theinterim resource update currently underway. Below is a summary of some of the additional intersections recorded so far thisyear: Hole ID Dip Azimuth Intercept From (m) To Zone Comment (m) DDH083 60 252 3m @ 9.21g/t 149 152 Central Zone DDH 45 316 5m @ 7.64g/t 71 76 Fold Area094 4m @ 1.03g/t 105 109 Fold Area DDH096 55 342 3m @ 2.15g/t 193 196 Fold Area 15m @ 2.69g/t 229 244 Fold Area Includes 8m @ 4.19g/t DDH 2m @ 3.29g/t 86 88 Fold Area097 DDH 19m @ 6.38g/t 28 47 Fold Area Includes 3m @ 16.89g/t 098 11m @ 1.05g/t 73 84 Fold Area DDH 45 162 Fold Area Results pending099 DDH 55 342 14m @ 3.56g/t 24 38 Fold Area Includes 3m @ 9.53g/t100 DDH101 45 342 6m @ 1.34g/t 184 190 Fold Area DDH Fold Area Results pending102 DDH103 45 58 12m @ 6.12g/t 50 62 Eastern Zone 3m @ 3.27 114 117 Eastern Zone 22m @ 11.53g/t 152 174 Eastern Zone Includes 5m @ 25g/t The second core rig has now been commissioned and Cluff Gold therefore expectsdrilling to increase from this week to a rate of between 300 and 400 metresdaily. The Company also announced recently that it has requested bids from variousconsultants to undertake a pre-feasibility study on Baomahun and the decision onan appointment will be made before the end of April. The study will look at thevarious mine development options and issues raised in the study would beaddressed in a full feasibility study planned for 2008. The pre-feasibilitystudy is planned to be completed in the 4th quarter of 2007. Mr. Douglas Chikohora, Technical Director of Cluff Gold plc comments, "We aredelighted with the latest assay results, particularly from the new fold-hingezone. The high grade intersections further support our belief that Baomahun hassignificant potential to evolve into a substantial gold deposit with furtherexploration and drilling." Qualified Person: Douglas D Chikohora has reviewed the information contained in this announcement.Douglas D Chikohora, Msc, MIMMM, CEng, is the Technical Director of the Company. For further information, please contact: Cluff Gold plcJ.G. Cluff / Douglas ChikohoraChairman / Technical DirectorTel: +44 (0)20 7340 9790 WH Ireland LimitedDavid YoungmanTel: +44 (0)161 832 2174 Parkgreen CommunicationsCathy Malins / Annabel LeatherTel: +44 (0)20 7851 7480 Notes to Editors: The Baomahun Gold Project covers an area of about 137 km-2 and is located about180 kilometres east of Freetown, in the Southern Province of Sierra Leone. Thegeological setting is similar to the Lake Victoria goldfields in Tanzania.According to the terms of a joint venture agreement with the owner of Baomahun,Winston Mines Limited, Cluff Gold has recently completed an earn-in of a 60%interest in the Baomahun prospect by spending US$5 million on exploration /development funding. A JORC resource of 880,000 ounces has so far beendelineated at Baomahun, though 70% of the defined mineralised zone is yet to bedrilled. Cluff Gold expects to provide a revised mineral resource estimatebefore June 2007. This information is provided by RNS The company news service from the London Stock Exchange
Date   Source Headline
21st Apr 20092:39 pmRNSHolding(s) in Company
20th Apr 20097:00 amRNSCommissioning of Kalsaka Mine
6th Apr 20094:08 pmRNSDirector/PDMR Shareholding
31st Mar 20097:00 amRNSTotal Voting Rights
30th Mar 20093:18 pmRNSCompletion of Placing
27th Mar 200911:38 amRNSResults of General Meeting
4th Mar 20092:35 pmRNSPlacing and Notice of General Meeting
24th Feb 20097:00 amRNSProposed private placing of US$10 million
24th Feb 20097:00 amPRNCluff Gold plc - Proposed private placement
18th Feb 20094:04 pmRNSTSX Trading Symbol
17th Feb 20097:00 amRNSCluff Gold Begins Trading on the TSX
9th Jan 200912:33 pmRNSStandby Loan Facility
31st Dec 20087:00 amRNSTotal Voting Rights
18th Dec 20087:48 amRNSChange of Adviser
3rd Dec 200812:19 pmRNSHolding(s) in Company
2nd Dec 20084:01 pmRNSDirector/PDMR Shareholding
27th Nov 20084:03 pmRNSDrilling Report
7th Nov 200812:04 pmRNSGrant of Options
5th Nov 20084:38 pmRNSDirector/PDMR Shareholding
3rd Nov 20087:00 amRNSAnnounces first gold pour at its Kalsaka Project
22nd Oct 200810:50 amRNSDirector/PDMR Shareholding
15th Oct 20089:47 amRNSDirector/PDMR Shareholding
6th Oct 20081:02 pmRNSGrant of Options to Directors
3rd Oct 200812:46 pmRNSDirector/PDMR Shareholding
1st Oct 20087:00 amRNSDirectorate Change
30th Sep 20087:00 amRNSDrilling Report
26th Sep 20087:00 amRNSInterim Results
25th Sep 200812:47 pmRNSStandby Loan Facility
15th Sep 20084:54 pmRNSHolding(s) in Company
3rd Sep 20082:55 pmRNSTotal Voting Rights
27th Aug 20087:37 amRNSKalsaka Gold Project Update
4th Aug 20081:13 pmRNSAcquisition
31st Jul 20088:59 amRNSTotal Voting Rights
25th Jul 200811:06 amRNSIssue of Equity
17th Jul 20089:14 amRNSGrant of Mining Lease Sierra
27th Jun 200812:08 pmRNSDirector/PDMR Shareholding
25th Jun 20087:00 amRNSDrilling Report
19th Jun 200811:42 amRNSResult of AGM
19th Jun 20089:55 amRNSAGM Statement
6th Jun 20089:46 amRNSIssue of Options
29th May 20083:59 pmRNSDirector/PDMR Shareholding
30th Apr 20083:53 pmRNSTotal Voting Rights
28th Apr 20087:00 amRNSFinal Results
25th Apr 20084:19 pmRNSDirectorate Change
11th Apr 20082:49 pmRNSIssue of Equity
7th Apr 20082:21 pmRNSTotal Voting Rights
19th Mar 20087:00 amRNSOperational Update
6th Mar 20088:01 amRNSHolding(s) in Company
29th Feb 20084:19 pmRNSCompletion of Placing
29th Feb 20081:58 pmRNSEGM Statement

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.