Talon Resources Targets Ontario Gold Growth After AIM Move and Eagle Lake Acquisition, CEO Says.Watch here

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksAmara Mining Regulatory News (AMA)

  • There is currently no data for AMA

Update at Baomahun

18 Apr 2007 07:00

Cluff Gold PLC18 April 2007 Cluff Gold plc ("Cluff Gold" or the "Company") Drilling update at Baomahun Gold Project, Sierra Leone Highlights: • Fold hinge area at Baomahun yields high grade intercepts • Drill hole DDH103 intersects 22 metres grading 11.53g/t Au, including 5m@ 25g/t Au • Data compilation for an interim resource update underway • Second core rig commissioned on 16th April • Drilling rate with second rig to increase to between 300 and 400 metres daily Cluff Gold today announces further encouraging drilling results from theBaomahun Gold Project ('Baomahun') in Sierra Leone, where more than a quarter ofthe planned 30,000 metres of core drilling has been completed. The totalprogramme will consist of 15,000 metres of infill drilling and 15,000 metres ofnew exploration drilling. The infill drilling has been designed to produce a 25 metre spaced grid on theEastern, Central and Western Zones and the focus so far has been on the southernarea of the Central Zone and an area around the eastern limits of theinterpreted fold, between the Central and Eastern Zones. Other drilling hasin-filled between the existing inferred resource drilling on the Central Zone. The exploration drilling is focussed on the identification of possibleextensions to the Western Zone and on the fold-hinge area between the Centraland Eastern Zones. Assay results from several holes drilled in the newfold-hinge area are being received. The fold-hinge area will be included in theinterim resource update currently underway. Below is a summary of some of the additional intersections recorded so far thisyear: Hole ID Dip Azimuth Intercept From (m) To Zone Comment (m) DDH083 60 252 3m @ 9.21g/t 149 152 Central Zone DDH 45 316 5m @ 7.64g/t 71 76 Fold Area094 4m @ 1.03g/t 105 109 Fold Area DDH096 55 342 3m @ 2.15g/t 193 196 Fold Area 15m @ 2.69g/t 229 244 Fold Area Includes 8m @ 4.19g/t DDH 2m @ 3.29g/t 86 88 Fold Area097 DDH 19m @ 6.38g/t 28 47 Fold Area Includes 3m @ 16.89g/t 098 11m @ 1.05g/t 73 84 Fold Area DDH 45 162 Fold Area Results pending099 DDH 55 342 14m @ 3.56g/t 24 38 Fold Area Includes 3m @ 9.53g/t100 DDH101 45 342 6m @ 1.34g/t 184 190 Fold Area DDH Fold Area Results pending102 DDH103 45 58 12m @ 6.12g/t 50 62 Eastern Zone 3m @ 3.27 114 117 Eastern Zone 22m @ 11.53g/t 152 174 Eastern Zone Includes 5m @ 25g/t The second core rig has now been commissioned and Cluff Gold therefore expectsdrilling to increase from this week to a rate of between 300 and 400 metresdaily. The Company also announced recently that it has requested bids from variousconsultants to undertake a pre-feasibility study on Baomahun and the decision onan appointment will be made before the end of April. The study will look at thevarious mine development options and issues raised in the study would beaddressed in a full feasibility study planned for 2008. The pre-feasibilitystudy is planned to be completed in the 4th quarter of 2007. Mr. Douglas Chikohora, Technical Director of Cluff Gold plc comments, "We aredelighted with the latest assay results, particularly from the new fold-hingezone. The high grade intersections further support our belief that Baomahun hassignificant potential to evolve into a substantial gold deposit with furtherexploration and drilling." Qualified Person: Douglas D Chikohora has reviewed the information contained in this announcement.Douglas D Chikohora, Msc, MIMMM, CEng, is the Technical Director of the Company. For further information, please contact: Cluff Gold plcJ.G. Cluff / Douglas ChikohoraChairman / Technical DirectorTel: +44 (0)20 7340 9790 WH Ireland LimitedDavid YoungmanTel: +44 (0)161 832 2174 Parkgreen CommunicationsCathy Malins / Annabel LeatherTel: +44 (0)20 7851 7480 Notes to Editors: The Baomahun Gold Project covers an area of about 137 km-2 and is located about180 kilometres east of Freetown, in the Southern Province of Sierra Leone. Thegeological setting is similar to the Lake Victoria goldfields in Tanzania.According to the terms of a joint venture agreement with the owner of Baomahun,Winston Mines Limited, Cluff Gold has recently completed an earn-in of a 60%interest in the Baomahun prospect by spending US$5 million on exploration /development funding. A JORC resource of 880,000 ounces has so far beendelineated at Baomahun, though 70% of the defined mineralised zone is yet to bedrilled. Cluff Gold expects to provide a revised mineral resource estimatebefore June 2007. This information is provided by RNS The company news service from the London Stock Exchange
Date   Source Headline
16th Jul 20137:00 amRNSYaoure Gold Project Update
8th Jul 20131:40 pmRNSDIRECTORS' DEALINGS
3rd Jul 20134:40 pmRNSDIRECTORS' DEALINGS
2nd Jul 20137:00 amRNSBaomahun Feasibility Study
27th Jun 201310:10 amRNSNOTICE OF BAOMAHUN FEASIBILITY STUDY
12th Jun 20134:35 pmRNSPrice Monitoring Extension
5th Jun 201311:59 amRNSResult of AGM
22nd May 20137:00 amRNSQ1 2013 RESULTS
21st May 20137:00 amRNSGRANTING OF ENVIRONMENTAL PERMIT FOR SEGA PROJECT
13th May 20137:00 amRNSPOSTING OF ANNUAL REPORT AND NOTICE OF AGM
10th May 20137:00 amRNSFILING OF YAOURE TECHNICAL REPORT
30th Apr 20137:00 amRNSRECEIPT OF PERMITS FOR KALSAKA/SEGA HAUL ROAD
10th Apr 20134:00 pmRNSDirectors' Dealings
5th Apr 20134:35 pmRNSPrice Monitoring Extension
2nd Apr 20133:30 pmRNSDirectors' Dealings
27th Mar 20137:00 amRNS2012 AUDITED FULL YEAR RESULTS
25th Mar 20137:00 amRNSResource Update for Yaoure Gold Project
16th Oct 20127:00 amRNSPEA and Exploration Update for the Sega Project
3rd Oct 20127:00 amRNSConfirmation of change of ticker
1st Oct 20127:00 amRNSChange of name and corporate update
12th Sep 20127:00 amRNSStrategic Alliance between Cluff Gold and Samsung
24th Feb 20115:33 pmRNSResignation of Non-Executive Director
26th Jan 20117:00 amRNSOperational and Strategic Review for 2011
23rd Dec 20103:04 pmRNSAdditional Listing of 182,565 ordinary shares
22nd Dec 20103:59 pmRNSDirector's Dealings
21st Dec 20104:21 pmRNSDirectors' Shareholdings
1st Dec 20107:00 amRNSFinal VTEM Results for Baomahun Gold Project
30th Nov 20107:00 amRNSKalsaka Exploration Drilling Update
1st Nov 201011:06 amRNSAdditional Listing
28th Oct 20107:00 amRNSUS$15M Private Placement with Macquarie Bank
12th Oct 20105:00 pmRNSHolding(s) in Company
12th Oct 201011:49 amRNSHolding(s) in Company
8th Oct 20101:05 pmRNSHolding(s) in Company
6th Oct 20104:24 pmRNSAdditional Listing
29th Sep 20107:00 amRNS2010 Interim Results
9th Sep 20107:00 amRNSH1 2010 Trading Update
3rd Sep 20107:00 amRNSDirectorate Change
13th Aug 20105:42 pmRNSTECHNICAL REPORT ON BAOMAHUN FILED ON SEDAR
28th Jul 20105:10 pmRNSDirector/PDMR Shareholding
6th Jul 20109:49 amRNSGrant of Options to Directors
30th Jun 201011:58 amRNSResults of the Prelim Assessment for Baomahun Gold
29th Jun 20107:00 amRNSResult of AGM and new Board appointments
15th Jun 201011:42 amRNSPosting of Annual Report
4th Jun 20107:00 amRNSIncreased Mineral Resource Estimate at Baomahun
2nd Jun 20102:57 pmRNSForm 8.3 - Cluff Gold Plc
2nd Jun 201011:37 amRNSForm 8.5 (EPT/NON-RI)
1st Jun 20105:41 pmRNSTermination of Offer Talks
1st Jun 20103:05 pmRNSForm 8.3 - Cluff Gold Plc
1st Jun 201011:11 amRNSForm 8.5 (EPT/NON-RI)
1st Jun 201010:11 amRNSForm 8.5 (EPT/RI)

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.