Results of the Prelim Assessment for Baomahun Gold

30 Jun 2010 11:58

RNS Number : 5252O
Cluff Gold PLC
30 June 2010
 



 

 

 

30 June 2010 for Immediate Release CLF/TSX: CFG

 

Cluff Gold plc

("Cluff Gold" or the "Company")

 

RESULTS OF THE PRELIMINARY ASSESSMENT FOR BAOMAHUN GOLD PROJECT

 

Cluff Gold, the dual AIM/TSX listed West African-focused gold mining company, announces the results of the Preliminary Assessment (Scoping Study) at its 100% owned Baomahun Gold Project ("Baomahun") in Sierra Leone.

 

The Preliminary Assessment, which was undertaken by various independent consultants (see below for details), has confirmed the commercial viability of Baomahun. On 4 June 2010, the Company announced that the Measured and Indicated mineral resources at Baomahun had increased to 1.42 million ounces of gold (15.1Mt at 2.92g/t).

 

The highlights of the Preliminary Assessment are:

·; Total cash flow of US$438 million, a pre-tax net present value ("NPV") of US$172 million and an internal rate of return ("IRR") of 31% using a gold price of US$1,100/oz and a discount rate of 10%

·; Average production of 157,000 oz per annum over the 8 year initial mine life which has been outlined from the current defined resources

·; Total cash cost per ounce of US$500 over the 8 year mine life

·; Capital expenditure of US$195 million with a 2.3 year pay-back from the start of production

 

Mr Douglas Chikohora, Technical Director of Cluff Gold plc, commented:

 

"The results of the Preliminary Assessment are very encouraging and indicate that Baomahun will become Cluff Gold's flagship asset. With a net present value of US$172 million and forecast average gold production of 157,000 ounces per annum, the project has continued to confirm our expectations. At the current gold price of US$1,240/oz the project would deliver over US$600m of total cash flow with a net present value of US$263m over the eight year life. Our focus is now on further improving Baomahun's economics by expanding the resource base and optimising various aspects of the project. We believe that Cluff Gold will be able to develop Baomahun and transition the Company to a 250,000 ounces per annum producer."

 

The feasibility study work is now well advanced, with significant areas including metallurgical testwork and the processing methodology nearing completion. Our in-fill drilling programme is continuing, which has to date delivered excellent results in converting Inferred resources to Measured and Indicated categories. The final feasibility study is planned to be completed in 2011.

 

Significant opportunities exist to improve the overall economics of the project prior to completion of the feasibility study. These include:

 

·; Considerable exploration potential exists at Baomahun, with the current resources located in only 3km of the total 12km prospective trend, which was covered by the recently completed VTEM (Versatile Time-Domain Electromagnetic) geophysical survey

·; Initial interpretation results from the VTEM survey have identified potential prospective locations for further exploration on the 12km trend. The final results and detailed report of this survey are expected in August 2010

·; Further exploration drilling to increase the resource base for Baomahun continues with a second rig expected at site in due course

·; Further optimisation of key project parameters to further reduce operating costs, for example open pit and underground mining will be studied to reduce the anticipated strip ratio for the open pit

·; The Preliminary Assessment is based on a heavy fuel oil power plant. However, there is good hydroelectric potential in the general area of Baomahun which has the potential to significantly reduce power costs. A heavy fuel oil power facility would still be required to augment hydro-electric generation during the dry season. A hydro-electric facility would also deliver a lasting and environmentally sustainable benefit for Sierra Leone

 

The Preliminary Assessment has been prepared with input from a number of independent consultants including SRK Consulting, Johannesburg (mining), AMEC, UK (environmental), SGS South Africa, Johannesburg (metallurgical testwork), and SENET, Johannesburg (processing and infrastructure).

 

Mineral Resources

 

Baomahun's Mineral Resources (which are set out in the following table) have been derived from resource drilling and assays received before June 2010 and are as reported in the Company's press release dated 4 June 2010. These Mineral Resource estimates were prepared in accordance with National Instrument 43-101.

 

Baomahun Mineral Resources

 

 

Tonnes

Au

(g/t)

Ounces

Measured

 

5,454,000

2.90

508,000

Indicated

 

9,642,000

2.93

909,000

Total Measured and Indicated

 

15,096,000

2.92

1,417,000

Inferred

 

12,168,000

2.64

1,033,000

(Using a 1.0 g/t Au cut-off).

 

Mine Plan

SRK Consulting (Johannesburg office) prepared a mine plan based on Baomahun's Mineral Resources delineated to date. Open pit and underground optimisations were calculated based on the following parameters:

 

Gold price: US$950 per ounce

Diesel fuel price: US$0.75/litre

Metallurgical recovery: 92%

 

Open pit Underground

Mining dilution: 5% at zero grade 15% at zero grade

Mining recovery: 95% 80%

Cut-off grade: 0.6g/t 2.7g/t

 

In addition to the open pit, the mine schedule proposes that the underground ore will be accessed from the first year of production at a rate increasing to 400,000t per annum in the fourth year of operation. The following mined tonnages were estimated to be contained in the engineered open pit and underground design:

 

Baomahun Mined Tonnage Contained Within Mine Plan

 

Tonnes ore

Au

(g/t)

Ounces

Tonnes waste

Open pit

12,010,866

2.67

1,032,633

147,289,495

Underground

2,425,167

4.28

333,403

1,095,797

Total

14,436,033

2.94

1,366,036

148,385,292

 

Processing

Metallurgical testwork, including recovery and comminution studies, has been undertaken by SGS South Africa in Johannesburg to a standard suitable for inclusion in the feasibility study. The results indicate that the gold ores are non-refractory. Metallurgical results to date indicate an overall metallurgical recovery of 92% for all ore types.

 

Based on this testwork, SENET of Johannesburg scoped a conventional Gravity-CIL (carbon-in-leach) processing facility with annual throughput of 1.9 Mtpa, resulting in a currently defined initial mine life of 8 years.

 

Power

The Preliminary Assessment has been completed assuming a heavy fuel oil power plant for the project. Studies have also been initiated for a run-of-river hydroelectric facility, which could result in lower operating costs. Follow-up site investigations including the installation of flow gauges and detailed hydrology studies are ongoing as part of the feasibility studies.

 

The Company will open discussions with third parties to invest in a run-of-river hydro-electric facility subject to an off-take agreement for the life of the project. This option would still require the Company to invest in a heavy fuel oil power plant for the dry season.

 

Capital Costs and Infrastructure

The following table summarises expected capital costs for the Baomahun project estimated by the independent consultants, which are considered to be accurate within 15% and includes preliminary discussions with equipment providers together with knowledge gained from current projects in Africa. Costs currently assume an owner operated mining fleet.

 

Baomahun Project Capital Costs

US$ million

Process plant direct costs

69.9

Infrastructure costs

35.2

Owner's costs

9.8

EPCM

24.5

Open pit mining fleet

16.8

Underground mining equipment

8.6

Underground pre-production costs

1.9

Tailings management facility

10.0

Contingency

18.0

Total Project Initial Capital Costs

194.7

Ongoing Capital

52.3

 

Operating Costs

The following operating costs were estimated and incorporated into the financial analysis:

 

Life of Mine Total Operating Costs Per Ounce

(US$/ounce)

Mining

325.49

Processing

152.56

G & A

18.38

Refining

3.20

Total

499.63

 

Project Economics and Financial Analysis

 

The Company has produced a cash flow valuation model for the Baomahun project based upon the geological and engineering work completed to date. The base case was developed using a long-term gold price of US$1,100 per ounce and includes applicable royalties in accordance with Sierra Leonean law.

 

Calculated sensitivities show the robust nature of the projected economics to operating assumptions.

 

Sensitivities

IRR

NPV (US$ M)

(%)

0%

5%

10%

Gold price (US$/oz)

1,000

24%

318.7

189.1

106.9

1,100

31%

438.1

276.0

171.9

1,200

38%

557.5

362.9

236.9

Capital Costs

+ 10%

27%

413.6

254.3

152.3

- 10%

36%

462.6

297.8

191.5

Operating Costs

+ 10%

27%

375.5

230.1

137.4

- 10%

35%

500.7

321.9

206.4

 

The above financial analysis does not take into account ongoing exploration, feasibility, financing or interest costs and is set out before taxation.

 

Qualified Person

The Preliminary Economic Assessment was prepared under the supervision of the Company's Technical Director, Douglas Chikohora, a "qualified person", as such term is defined in National Instrument 43-101. Mr. Chikohora has reviewed and approved the contents of this press release.

 

Full details of the Preliminary Economic Assessment in the form of a National Instrument 43-101 technical report will be filed on SEDAR within the next 45 days. 

 

About Cluff Gold

 

Cluff Gold is focused on the identification, acquisition and development of gold deposits in West Africa that are amenable to open-pit mining and low cost production techniques. The Company has assembled a portfolio of mineral interests at various stages of development in Côte d'Ivoire, Burkina Faso and Sierra Leone. Cluff Gold progressed from being an explorer to a producer in Q1 2008 and is expected to produce a total of 100,000 ounces of gold in 2010 from its Angovia Gold Mine in Côte d'Ivoire and its Kalsaka Gold Mine in Burkina Faso. Cluff Gold is actively evaluating known satellite deposits to expand the resource base at both mines. The Company has completed a preliminary assessment at its wholly-owned Baomahun project in Sierra Leone where a measured and indicated resource estimated to contain over 1.4 million ounces of gold, in accordance with NI 43-101, has been announced to date (508,000ozs at 2.92g/t Measured; 909,000ozs at 2.93 g/t Indicated; plus an additional 1,033,000ozs at 2.64g/t Inferred).

 

For further information, please contact:

 

Cluff Gold plc

J.G. Cluff - Chairman and Chief Executive

Douglas Chikohora - Technical Director

Tel: +44 (0) 20 7340 9790

Evolution Securities Limited

Rob Collins

Tim Redfern

Tel: +44 (0) 20 7071 4300

 

Pelham Bell Pottinger

 

Investor Relations (Global)

Charles Vivian

Klara Kaczmarek

Tel: +44 (0) 20 7861 3232

Farm Street Communications Ltd 

 

Press Relations (U.K.)

Simon Robinson

+44 (0) 7593 340 107

simon.robinson@farmstreetmedia.com

NO REGULATORY AUTHORITY HAS APPROVED OR DISAPPROVED THE CONTENT OF THIS PRESS RELEASE.

 

This News Release includes certain "forward-looking information" within the meaning of applicable Canadian securities legislation. All statements other than statements of historical fact, included in this release, including, without limitation, the positioning of the Company for future success, statements regarding potential future production at Angovia and Kalsaka, exploration and drilling results at Baomahun, and future capital plans and objectives of Cluff Gold, are forward-looking information that involve various risks and uncertainties. There can be no assurance that such statements will prove to be accurate and actual results and future events could differ materially from those anticipated in such statements. Important factors that could cause actual results to differ materially from Cluff Gold's expectations include, among others, risks related to international operations, the actual results of current exploration and drilling activities, changes in project parameters as plans continue to be refined as well as future price of gold. Although Cluff Gold has attempted to identify important factors that could cause actual results to differ materially, there may be other factors that cause results not to be as anticipated, estimated or intended. There can be no assurance that such statements will prove to be accurate as actual results and future events could differ materially from those anticipated in such statements. Accordingly, readers should not place undue reliance on forward-looking statements. Cluff Gold does not undertake to update any forward-looking statements that are included herein, except in accordance with applicable securities laws.

 

Douglas D Chikohora has reviewed and approved the information contained within this announcement. Mr Chikohora (MSc., MIMMM., CEng) is the Technical Director of the Company.

 

A technical report prepared by SRK Consulting (UK) Limited entitled "Technical Review of the Baomahun Gold Exploration Project, Sierra Leone", was filed on 17 February 2009 at www.sedar.com.

 

Cautionary Statement:

The Preliminary Economic Assessment is preliminary in nature and includes Inferred Mineral Resources that are considered too speculative geologically to have the economic considerations applied to them that would enable them to be categorized as Mineral Reserves. There is no certainty that the conclusions reached in the Preliminary Economic Assessment will be realized. Mineral Resources that are not Mineral Reserves do not have demonstrated economic viability.

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
MSCLLFEIRSIIVII
Date   Source Headline
18th Apr 20161:28 pmRNSForm 8.3 - Perseus Mining Limited
18th Apr 201611:45 amRNSForm 8.3 - Perseus Mining Limited
18th Apr 201611:27 amRNSForm 8.5 (EPT/RI) - Amara Mining PLC
18th Apr 201610:54 amRNSSCHEME OF ARRANGEMENT BECOMES EFFECTIVE
18th Apr 201610:12 amRNSForm 8.5 (EPT/NON-RI)
18th Apr 20169:23 amRNSForm 8.3 - Perseus Mining Ltd
18th Apr 20167:30 amRNSSuspension - Amara Mining Plc
15th Apr 201611:59 amRNSForm 8.5 (EPT/RI) - Amara Mining PLC
15th Apr 201611:58 amRNSCOURT SANCTION OF SCHEME ARRANGEMENT
15th Apr 201611:46 amRNSForm 8.3 - Perseus Mining Limited
14th Apr 20161:34 pmRNSForm 8.5 (EPT/RI) - Amara Mining PLC
14th Apr 201611:50 amRNSForm 8.3 - Perseus Mining Limited - Replacement
14th Apr 201611:42 amRNSForm 8.3 - Perseus Mining Limited
14th Apr 201610:33 amRNSForm 8.5 (EPT/NON-RI) - Amara Mining plc
13th Apr 201611:59 amRNSForm 8.5 (EPT/RI) - Amara Mining PLC
13th Apr 201611:42 amRNSForm 8.3 - Perseus Mining Limited
12th Apr 201611:59 amRNSForm 8.5 (EPT/RI) - Amara Mining PLC
12th Apr 201611:44 amRNSForm 8.3 - Perseus Mining Ltd
11th Apr 20164:53 pmRNSForm 8.3 - Amara Minig
11th Apr 201612:01 pmRNSForm 8.3 - Perseus Mining Limited
11th Apr 201611:08 amRNSHolding(s) in Company
11th Apr 201610:56 amRNSForm 8.3 - [Amara Mining Plc]
11th Apr 201610:24 amRNSForm 8.5 (EPT/NON-RI) - Amara Mining plc
11th Apr 20169:07 amRNSForm 8.5 (EPT/RI) - Amara Mining PLC
8th Apr 20168:00 pmEQSDGAP-Regulatory: Form 8.3 - Amara Mining PLC
8th Apr 20161:25 pmRNSRESULTS OF COURT AND GENERAL MEETING
8th Apr 20161:20 pmRNSForm 8.3 - Amara Mining PLC
8th Apr 201611:57 amRNSForm 8.5 (EPT/RI) - Amara Mining PLC
8th Apr 201611:56 amRNSForm 8.3 - Perseus Mining Limited
8th Apr 201610:57 amRNSForm 8.3 - [Amara Mining Plc]
8th Apr 201610:56 amRNSHolding(s) in Company
7th Apr 20161:19 pmRNSForm 8.3 - Amara Mining PLC
7th Apr 201611:56 amRNSForm 8.5 (EPT/RI) - Amara Mining PLC
6th Apr 20162:32 pmRNSForm 8.3 - Amara Mining PLC
6th Apr 201611:31 amRNSForm 8.3 - Perseus Mining Limited
6th Apr 20169:46 amRNSForm 8.5 (EPT/RI) - Amara Mining PLC
5th Apr 20161:56 pmRNSForm 8.3 - Perseus Mining Limited - Acorn Capital
5th Apr 20161:17 pmRNSForm 8.3 - Amara Mining PLC
5th Apr 20169:18 amRNSForm 8.5 (EPT/RI) - Amara Mining PLC
4th Apr 20163:03 pmRNSForm 8.3 - Amara Mining PLC
4th Apr 201611:43 amRNSForm 8.5 (EPT/RI) - Amara Mining PLC
4th Apr 20169:51 amRNSForm 8.5 (EPT/NON-RI) - Amara Mining plc
1st Apr 20165:29 pmRNSForm 8.3 - Amara Mining PLC
1st Apr 20163:31 pmRNSForm 8.3 - Perseus Mining Limited
1st Apr 201611:59 amRNSForm 8.5 (EPT/RI) - Amara Mining PLC
1st Apr 201611:48 amRNSForm 8.3 - Perseus Mining Ltd
1st Apr 20167:00 amRNSForm 8.3 - Amara Mining PLC
31st Mar 201612:56 pmRNSForm 8.3 - Perseus Mining Ltd
31st Mar 201610:51 amRNSForm 8.5 (EPT/NON-RI) - Amara Mining plc
31st Mar 201610:49 amRNSForm 8.5 (EPT/RI) - Amara Mining PLC

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.