Less Ads, More Data, More Tools Register for FREE

Pin to quick picksAmara Mining Regulatory News (AMA)

  • There is currently no data for AMA

Baomahun Drilling Programme Results

8 Sep 2009 07:00

RNS Number : 6659Y
Cluff Gold PLC
08 September 2009
 



AIM:CLF

TSX;CFG

For release on Tuesday 8 September, 2009, at 7.00 a.m BST

Cluff Gold plc

Results from the Drilling Programme at the Baomahun gold project in Sierra Leone show strong potential

 

London, England, 8 September, 2009 - Cluff Gold plc (AIM: CLF; TSX: CFG) ("Cluff" or "the Company"), the West African focused gold mining company, announces the successful completion of the 7,000 metre drilling programme at Baomahun, its flagship gold project located in Sierra Leone. The drill holes were programmed to intersect depth extensions of known mineralised ore shoots as announced on 20th April 2009.

All assay results have been received from the eleven completed holes. The results demonstrate the down dip continuity of mineralisation at grades and widths which the Company considers show strong potential to support an underground operation either alongside or subsequent to an open pit operation.

Highlights:

Baomahun gold project, Sierra Leone: (100% ownership)

Nine holes intersect mineralisation at depth.

High grade intersections were reported in DDH 299A which intersected 32 metres grading at 2.69g/t including 11 metres at 5.57g/t from 350 metre inclined depth; DDH 304 which intersected 60 metres at 3.89g/t from 632 metres down the hole including 6 metres at 11.7g/t from 657 metres; and DDH 305 which intersected 18 metres at 4.04g/t from 526 metres down the hole including 5 metres at 10.8g/t from 532 metres.

Results to be incorporated into a new resource update which is likely to be published during October 2009.

 

Commenting on these results, Mr Douglas Chikohora, Technical Director of Cluff Gold said, "We are extremely pleased with these drill results which demonstrate that mineralisation, with excellent grades, extends to a vertical depth of at least 600 metres. We believe that these results illustrate the possibility of underground operations at the Baomahun gold project. A resource update is currently being prepared and it is expected that it will be released in October 2009."

Below is a table summarising the significant mineralised intersections:

Hole ID

Dip(0)

Azimuth (0Mag)

Intercept

From (m)

Zone

Comments

DDH296

80

227

2m @ 1.20g/t

53

Eastern Zone

 

 

 

 

2m @ 1.26g/t

519

 

 

 

 

 

7m @ 2.02g/t

561

 

 

 

 

 

11m @ 3.23g/t

578

 

includes 2m @ 7.80g/t from 581m

DDH297

79

220

3m @ 2.60g/t

42

Eastern Zone

 

 

 

 

3m @ 3.06g/t

386

 

 

 

 

 

8m @ 1.33g/t

486

 

 

 

 

 

2m @ 2.97g/t

511

 

 

DDH298

79

220

3m @ 5.32g/t

400

Eastern Zone

including 1m @ 14.1g/t from 400m

 

 

 

9m @ 5.97g/t

467

 

including 1m @ 22.5g/t from 468m

DDH299A

81

214

6m @ 1.84g/t

94

Eastern Zone

 

 

 

 

4m @ 1.81g/t

260

 

 

 

 

 

32m @ 2.69g/t

331

 

includes 11m @ 5.57g/t from 350m

 

 

 

4m @ 2.36g/t

372

 

 

 

 

 

6m @ 2.38g/t

380

 

 

 

 

 

5m @ 4.76g/t

393

 

 

 

 

 

5m @ 3.37g/t

439

 

includes 2m @ 6.74g/t from 442m

DDH300

78

231

2m @ 1.35g/t

41

Central Zone

 

 

 

 

4m @ 2.11g/t

56

 

 

 

 

 

6m @ 5.51g/t

441

 

includes 3m @ 9.48g/t from 442m

 

 

 

3m @3.76g/t

476

 

 

 

 

 

3m @3.85g/t

521

 

 

DDH301

70

247

3m @2.56g/t

458

Central Zone

 

 

 

 

10m @10.5g/t

487

 

 

DDH303A

75

252

3m @ 4.25g/t

69

Central Zone

 

 

 

 

3m @ 1.21 g/t

399

 

 

DDH304

64

66.5

60m @ 3.89g/t

632

Central Zone

includes 6m @ 11.7 g/t from 657m

 

 

 

 

 

 

includes 4m @ 10.0g/t from 639m

 

 

 

9m @ 2.9g/t

726

 

 

DDH305

57

52

18m @ 4.04 g/t

526

Central Zone

Includes 5m @ 10.8 g/t from 532m

 

 

 

4m @ 1.88 g/t

584

 

 

 

True thickness of mineralisation may vary from 40% to 70% of intersected widths. 

Drill cores for assaying were taken at a maximum of one metre intervals and were cut with a diamond saw and one half of the core placed in sealed bags and sent to the Company's sample preparation facility at Baomahun, Sierra Leone. The core samples werthen crushed to minus 6mm, and split with half of the sample pulverised down to 80% passing 106 microns. Approximately 120 grams of the pulverised sample were then shipped to the SGS Laboratory (which is independent of the company) in SiguiriGuinea where the samples were analysed for gold by fire assay using a 50g charge. As part of the Company's QA/QC procedures, internationally recognised standards, duplicates and blanks were inserted into the sample batches.

Douglas D Chikohora has reviewed and approved the information contained in this announcement. Douglas D Chikohora, (MSc, MIMMM, CEng) is Technical Director of the Company.

About Cluff Gold

Cluff Gold is focused on the identification, acquisition and development of gold deposits in West Africa that are amenable to open-pit mining and low cost production techniques. The Company has assembled a portfolio of mineral interests at various stages of development in Côte d'IvoireBurkina FasoSierra Leone and Mali. Cluff Gold progressed from being an explorer to a producer in Q1 2008 and is expected to produce 100,000 ounces of gold on an annualised basis for 2009 from its Angovia Gold Mine in Cote d'Ivoire and from its Kalsaka Gold Mine in Burkina Faso. Cluff Gold is actively evaluating known satellite deposits to expand the resource base at both mines.

This News Release includes certain "forward-looking information" within the meaning of applicable Canadian securities legislation. All statements other than statements of historical fact, included in this release, including, without limitation, the positioning of the Company for future success, statements regarding potential future production at Angovia and Kalsaka, exploration and drilling results at Baomahun, and future capital plans and objectives of Cluff Gold, are forward-looking information that involve various risks and uncertainties. There can be no assurance that such statements will prove to be accurate and actual results and future events could differ materially from those anticipated in such statements. Important factors that could cause actual results to differ materially from Cluff Gold's expectations include, among others, risks related to international operations, the actual results of current exploration and drilling activities, changes in project parameters as plans continue to be refined as well as future price of gold. Although Cluff Gold has attempted to identify important factors that could cause actual results to differ materially, there may be other factors that cause results not to be as anticipated, estimated or intended.

 

There can be no assurance that such statements will prove to be accurate as actual results and future events could differ materially from those anticipated in such statements. Accordingly, readers should not place undue reliance on forward-looking statements. Cluff Gold does not undertake to update any forward-looking statements that are included herein, except in accordance with applicable securities laws.

NO REGULATORY AUTHORITY HAS APPROVED OR DISAPPROVED THE CONTENT OF THIS PRESS RELEASE.

For further information, please contact:

Cluff Gold plc 

J.G. Cluff/Douglas Chikohora

Chairman/Technical Director

Tel: +44 (0) 20 7340 9790

Evolution Securities Limited

Rob Collins

Tim Redfern

Tel: +44 (0) 20 7071 4300

Joanna Longo

Investor Relations (Canada)

The Equicom Group

+1 416 815 0700 ext 233

jlongo@equicomgroup.com

Simon Robinson

Investor Relations (U.K.)

Farm Street Communications Ltd

+44 (0) 20 7099 2212

simon.robinson@farmstreetmedia.com

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
DRLEAXNXEAANEFE
Date   Source Headline
21st Apr 20092:39 pmRNSHolding(s) in Company
20th Apr 20097:00 amRNSCommissioning of Kalsaka Mine
6th Apr 20094:08 pmRNSDirector/PDMR Shareholding
31st Mar 20097:00 amRNSTotal Voting Rights
30th Mar 20093:18 pmRNSCompletion of Placing
27th Mar 200911:38 amRNSResults of General Meeting
4th Mar 20092:35 pmRNSPlacing and Notice of General Meeting
24th Feb 20097:00 amRNSProposed private placing of US$10 million
24th Feb 20097:00 amPRNCluff Gold plc - Proposed private placement
18th Feb 20094:04 pmRNSTSX Trading Symbol
17th Feb 20097:00 amRNSCluff Gold Begins Trading on the TSX
9th Jan 200912:33 pmRNSStandby Loan Facility
31st Dec 20087:00 amRNSTotal Voting Rights
18th Dec 20087:48 amRNSChange of Adviser
3rd Dec 200812:19 pmRNSHolding(s) in Company
2nd Dec 20084:01 pmRNSDirector/PDMR Shareholding
27th Nov 20084:03 pmRNSDrilling Report
7th Nov 200812:04 pmRNSGrant of Options
5th Nov 20084:38 pmRNSDirector/PDMR Shareholding
3rd Nov 20087:00 amRNSAnnounces first gold pour at its Kalsaka Project
22nd Oct 200810:50 amRNSDirector/PDMR Shareholding
15th Oct 20089:47 amRNSDirector/PDMR Shareholding
6th Oct 20081:02 pmRNSGrant of Options to Directors
3rd Oct 200812:46 pmRNSDirector/PDMR Shareholding
1st Oct 20087:00 amRNSDirectorate Change
30th Sep 20087:00 amRNSDrilling Report
26th Sep 20087:00 amRNSInterim Results
25th Sep 200812:47 pmRNSStandby Loan Facility
15th Sep 20084:54 pmRNSHolding(s) in Company
3rd Sep 20082:55 pmRNSTotal Voting Rights
27th Aug 20087:37 amRNSKalsaka Gold Project Update
4th Aug 20081:13 pmRNSAcquisition
31st Jul 20088:59 amRNSTotal Voting Rights
25th Jul 200811:06 amRNSIssue of Equity
17th Jul 20089:14 amRNSGrant of Mining Lease Sierra
27th Jun 200812:08 pmRNSDirector/PDMR Shareholding
25th Jun 20087:00 amRNSDrilling Report
19th Jun 200811:42 amRNSResult of AGM
19th Jun 20089:55 amRNSAGM Statement
6th Jun 20089:46 amRNSIssue of Options
29th May 20083:59 pmRNSDirector/PDMR Shareholding
30th Apr 20083:53 pmRNSTotal Voting Rights
28th Apr 20087:00 amRNSFinal Results
25th Apr 20084:19 pmRNSDirectorate Change
11th Apr 20082:49 pmRNSIssue of Equity
7th Apr 20082:21 pmRNSTotal Voting Rights
19th Mar 20087:00 amRNSOperational Update
6th Mar 20088:01 amRNSHolding(s) in Company
29th Feb 20084:19 pmRNSCompletion of Placing
29th Feb 20081:58 pmRNSEGM Statement

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.