If you would like to learn more about future focusIR related events and roundtables, please submit your details here

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksAminex Regulatory News (AEX)

Share Price Information for Aminex (AEX)

Share Price is delayed by 15 minutes
Get Live Data
2.45    0.075 (2.97%)
Bid:
2.40
Ask:
2.50
Spread: 0.10 (4.167%)
Market Cap: £116.35m
AEX Live PriceLast checked at - London Stock Exchange

Intraday Aminex Share Chart

Tanzania Update

17 Jul 2008 07:00

RNS Number : 2562Z
Aminex PLC
17 July 2008
Β 

ο»Ώ

17 JULY 2008

AMINEX PLC

TANZANIAΒ EXPLORATION UPDATE

Aminex PLC, the oil and gas company listed inΒ LondonΒ andΒ DublinΒ ("Aminex" or the "Company"), provides the following update on its Tanzanian exploration activities.

During the second period of the Nyuni/East Songo-Songo Production Sharing Agreement ("Nyuni" or "Nyuni PSA") new seismic was acquired and two wells were drilled back-to-back, the second of which, Kiliwani North-1 ("KN-1"), encountered a 60 metre gross gas column in Lower Cretaceous sands. A 20 metre interval was perforated and was later successfully production-tested. As announced on 4 June, this well test recorded a flow rate of 40 million cubic feet/day which, together with other data recorded and subsequent lab analysis, satisfies Aminex that the Kiliwani North ("KN") discovery will result in the development of a commercially viable gas field.

The Nyuni PSA is sub-divided into three work periods, the second of which ended in May 2008. The Joint Venture has now applied to the Government of Tanzania to carve out a separate appraisal area for the KN discovery comprising the discovery block and adjoining blocks, while the remainder of the Nyuni area will be explored during the third period under the PSA terms. Commercialisation of KN through the KN-1 well will be fast-tracked as a separate project with the aim of achieving early production. This will be done in parallel with further seismic and exploration drilling over the remaining exploration blocks.

The KN-1 well has now proved that the neighbouring Songo-Songo producing gas field is not a "one-off" or "stand-alone" field and that the surrounding prospects are also capable of producing commercial hydrocarbons. Specific reserves for KN are virtually impossible to establish at this stage because the KN structure extends to the north, beyond the range of existing seismic coverage. A programme of field appraisal and delineation will be conducted in parallel with the early commercialisation of the KN-1 discovery.

KN should be treated as one of several adjoining gas accumulations in acreage held by Aminex and partners which should provide the basis for development of a significant new gas business in the region. In addition to KN, the Nyuni JV is planning to explore and evaluate other prospects in the region. An internal evaluation of all of the prospects identified results in combined prospect sizes in excess of 1 trillion cubic feet of gas on a risked P50 basis. This figure results only from prospect evaluation and should not be confused with a reserves calculation. An independent review of these prospects will be carried out over the next two months which may result in a larger or smaller total. It is too early to provide a meaningful estimate of reserves for the KN discovery at this time, given the absence of structural delineation to the North.

The KN well, now completed and suspended for future production, is located on Songo-Songo Island approximately three kilometres from the Songo-Songo Gas Field's processing facilities operated by Songas, a division of CDC Globelec. From the Songas facilities a 12" subsea pipeline makes a landfall on the Tanzanian coast and then connects to a 16" pipeline which carries gas approximately 200 kilometres toΒ Tanzania'sΒ principal city,Β Dar es Salaam. This common-user pipeline has been transporting gas from the Songo-Songo field since 2004 but is also available to the Nyuni joint venture under the terms of the Nyuni PSA. KN is effectively located next to an emerging gas-gathering hub and to the only major gas pipeline in the entire region. To accommodate increasing gas production, process facilities may need to be expanded and ultimately pipeline capacity may need to be increased, either through adding compression capability or through "twinning" the existing pipeline. Studies are in hand to identify fast-track, temporary alternatives for producing KN gas commercially on a shorter time scale than would be permitted by an upgrading of the Songas facilities, in order to generate early revenues and to build production history

Current gas production inΒ TanzaniaΒ is used for power generation, where it replaces expensive imported fuel oil, for firing an important cement plant and increasingly for use by other industries in theΒ Dar es SalaamΒ area. It is clear that industrial and other users will respond positively to increasing supplies of gas, in a country which has traditionally been starved of energy. The Government of Tanzania has recently made it very clear that it attaches great importance to the development of a domestic gas industry as rapidly as possible.

Partners in the Nyuni PSA are: Ndovu Resources Ltd. (Aminex) 40% (operator), RAK Gas Commission (25%), Key Petroleum Ltd. (20%),Β East African Exploration (10%)Β and Bounty Oil (5%).

In addition to the Nyuni PSA, Aminex has a 50% interest in the recently awarded Songo-Songo West Production Sharing AgreementΒ in partnership with Key Petroleum Ltd. which acts as operator. Aminex therefore has interests in acreage which virtually surrounds the Songo-Songo producing gas field.

Elsewhere inΒ Tanzania, good progress is being made in preparation for first drilling in the 12,000 square kilometre Ruvuma Basin ProductionΒ SharingΒ AgreementΒ where Aminex is in 50-50 partnership with Tullow Oil. The first of two commitment wells is expected to be spudded early in 2009.

For further information:

Brian Hall

Aminex

London

020 7291 3100

Archie Berens

Pelham PR

London

020 7743 6679

This information is provided by RNS
The company news service from the London Stock Exchange
Β 
END
Β 
Β 
DRLVQLFFVDBFBBB
Date   Source Headline
21st Aug 20087:00 amRNSGas Discovery in Texas
5th Aug 20083:08 pmRNSHolding(s) in Company
24th Jul 20089:43 amRNSListing of New Shares
17th Jul 20087:00 amRNSTanzania Update
2nd Jul 20088:00 amRNSNew Well Spudded in USA
30th Jun 20086:28 pmRNSAnnual Information Update
20th Jun 200811:57 amRNSDisposal of Madagascar Intere
11th Jun 20084:38 pmRNSBlocklisting Interim Review
6th Jun 200812:30 pmRNSDrilling Report
4th Jun 20084:54 pmRNSAGM - Listing Rules 6.6.2 (Ir
4th Jun 20084:00 pmRNSResult of AGM
4th Jun 200811:00 amRNSResult Of Well Test
2nd Jun 20087:00 amRNSNew Tanzania Licence Award
30th May 200810:19 amRNSTanzania Testing Update
15th May 20087:00 amRNSInterim Management Statement
13th May 20083:44 pmRNSDocument Availability
13th May 20081:27 pmRNSDirectors/PDMR Shareholding
29th Apr 20089:00 amRNSSpudding Of 2nd Egypt Well
16th Apr 200811:22 amRNSResult of Egypt Well
3rd Apr 200812:00 pmRNSOilbarrel Presentation
31st Mar 20089:49 amRNSFinal Results - Correction
28th Mar 20087:01 amRNSIncrease in US Reserves
28th Mar 20087:01 amRNSFinal Results
17th Mar 20087:02 amRNSTanzania Gas Discovery
25th Feb 20087:01 amRNSDrilling Update
11th Feb 20087:01 amRNSDrilling Report
5th Feb 20087:00 amRNSMain Market Notice
31st Jan 20084:59 pmRNSTotal Voting Rights
29th Jan 200812:08 pmRNSListing of New Shares
28th Jan 20087:00 amRNSEgyptian Progress Report
14th Jan 20087:01 amRNSTexas Drilling Update
21st Dec 20077:01 amRNSNew Drilling In Texas
20th Dec 20073:56 pmRNSInvestor Presentation
12th Dec 20075:19 pmRNSAdditional Listing
11th Dec 200712:34 pmRNSBlocklisting Interim Review
6th Dec 20071:37 pmRNSKiliwani Update
29th Nov 20073:14 pmRNSAdditional Listing - replace
21st Nov 20073:23 pmRNSAdditional Listing
16th Nov 20077:01 amRNSSpudding Of Well
5th Nov 20077:01 amRNSDelivery Of Rig
25th Oct 20077:01 amRNSNew PSC In Kenya
27th Sep 20077:01 amRNSInterim Results
24th Sep 20077:02 amRNSUS Drilling Update
28th Aug 200712:58 pmRNSChange of Corporate Broker
20th Aug 20077:01 amRNSExtension Of Tanzania Licence
9th Aug 200711:44 amRNSHolding in Company
7th Aug 20077:52 amRNSHolding in Company
7th Aug 20077:00 amRNSRig Update
2nd Aug 20077:00 amRNSOL Notice - Cancellation
1st Aug 20077:00 amRNSBoard Changes

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.