Tanzania Update

17 Jul 2008 07:00

RNS Number : 2562Z
Aminex PLC
17 July 2008
 



17 JULY 2008

AMINEX PLC

TANZANIA EXPLORATION UPDATE

Aminex PLC, the oil and gas company listed in London and Dublin ("Aminex" or the "Company"), provides the following update on its Tanzanian exploration activities.

During the second period of the Nyuni/East Songo-Songo Production Sharing Agreement ("Nyuni" or "Nyuni PSA") new seismic was acquired and two wells were drilled back-to-back, the second of which, Kiliwani North-1 ("KN-1"), encountered a 60 metre gross gas column in Lower Cretaceous sands. A 20 metre interval was perforated and was later successfully production-tested. As announced on 4 June, this well test recorded a flow rate of 40 million cubic feet/day which, together with other data recorded and subsequent lab analysis, satisfies Aminex that the Kiliwani North ("KN") discovery will result in the development of a commercially viable gas field.

The Nyuni PSA is sub-divided into three work periods, the second of which ended in May 2008. The Joint Venture has now applied to the Government of Tanzania to carve out a separate appraisal area for the KN discovery comprising the discovery block and adjoining blocks, while the remainder of the Nyuni area will be explored during the third period under the PSA terms. Commercialisation of KN through the KN-1 well will be fast-tracked as a separate project with the aim of achieving early production. This will be done in parallel with further seismic and exploration drilling over the remaining exploration blocks.

The KN-1 well has now proved that the neighbouring Songo-Songo producing gas field is not a "one-off" or "stand-alone" field and that the surrounding prospects are also capable of producing commercial hydrocarbons. Specific reserves for KN are virtually impossible to establish at this stage because the KN structure extends to the north, beyond the range of existing seismic coverage. A programme of field appraisal and delineation will be conducted in parallel with the early commercialisation of the KN-1 discovery.

KN should be treated as one of several adjoining gas accumulations in acreage held by Aminex and partners which should provide the basis for development of a significant new gas business in the region. In addition to KN, the Nyuni JV is planning to explore and evaluate other prospects in the region. An internal evaluation of all of the prospects identified results in combined prospect sizes in excess of 1 trillion cubic feet of gas on a risked P50 basis. This figure results only from prospect evaluation and should not be confused with a reserves calculation. An independent review of these prospects will be carried out over the next two months which may result in a larger or smaller total. It is too early to provide a meaningful estimate of reserves for the KN discovery at this time, given the absence of structural delineation to the North.

The KN well, now completed and suspended for future production, is located on Songo-Songo Island approximately three kilometres from the Songo-Songo Gas Field's processing facilities operated by Songas, a division of CDC Globelec. From the Songas facilities a 12" subsea pipeline makes a landfall on the Tanzanian coast and then connects to a 16" pipeline which carries gas approximately 200 kilometres to Tanzania's principal city, Dar es Salaam. This common-user pipeline has been transporting gas from the Songo-Songo field since 2004 but is also available to the Nyuni joint venture under the terms of the Nyuni PSA. KN is effectively located next to an emerging gas-gathering hub and to the only major gas pipeline in the entire region. To accommodate increasing gas production, process facilities may need to be expanded and ultimately pipeline capacity may need to be increased, either through adding compression capability or through "twinning" the existing pipeline. Studies are in hand to identify fast-track, temporary alternatives for producing KN gas commercially on a shorter time scale than would be permitted by an upgrading of the Songas facilities, in order to generate early revenues and to build production history

Current gas production in Tanzania is used for power generation, where it replaces expensive imported fuel oil, for firing an important cement plant and increasingly for use by other industries in the Dar es Salaam area. It is clear that industrial and other users will respond positively to increasing supplies of gas, in a country which has traditionally been starved of energy. The Government of Tanzania has recently made it very clear that it attaches great importance to the development of a domestic gas industry as rapidly as possible.

Partners in the Nyuni PSA are: Ndovu Resources Ltd. (Aminex) 40% (operator), RAK Gas Commission (25%), Key Petroleum Ltd. (20%), East African Exploration (10%) and Bounty Oil (5%).

In addition to the Nyuni PSA, Aminex has a 50% interest in the recently awarded Songo-Songo West Production Sharing Agreement in partnership with Key Petroleum Ltd. which acts as operator. Aminex therefore has interests in acreage which virtually surrounds the Songo-Songo producing gas field.

Elsewhere in Tanzania, good progress is being made in preparation for first drilling in the 12,000 square kilometre Ruvuma Basin Production Sharing Agreement where Aminex is in 50-50 partnership with Tullow Oil. The first of two commitment wells is expected to be spudded early in 2009.

For further information:

Brian Hall

Aminex

London

020 7291 3100

Archie Berens

Pelham PR

London

020 7743 6679

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
DRLVQLFFVDBFBBB
Date   Source Headline
21st Dec 20117:00 amRNSDirector/PDMR Shareholding
19th Dec 20117:00 amRNSDirector/PDMR Shareholding
16th Dec 20117:00 amRNSDirector/PDMR Shareholding
16th Dec 20117:00 amRNSDirectorate Change
5th Dec 20117:00 amRNSOperational Update
16th Nov 20117:00 amRNSInterim Management Statement
31st Oct 20117:00 amRNSNew Production Sharing Agreement Offshore Tanzania
6th Oct 20117:00 amRNSDrilling Update
20th Sep 20113:15 pmRNSDirector Declaration
20th Sep 20117:00 amRNSAppointment of Chief Executive
16th Sep 20117:00 amRNSNyuni-2 Well Update, Tanzania
8th Sep 20117:00 amRNSReorganisation of Ruvuma PSA, Tanzania
31st Aug 20117:00 amRNSHalf Yearly Report
26th Aug 20117:00 amRNSNyuni-2 Well Update
1st Jul 20117:00 amRNSDirector/PDMR Shareholding
30th Jun 201110:59 amRNSDirector/PDMR Shareholding
30th Jun 20117:00 amRNSDirector/PDMR Shareholding
27th Jun 20113:56 pmRNSDirector/PDMR Shareholding
17th Jun 20117:00 amRNSNew Well Starts Drilling in Tanzania
8th Jun 20112:41 pmRNSResult of AGM
8th Jun 20117:00 amRNSAGM Presentation
7th Jun 20117:00 amRNSDrilling Plans for Ruvuma Basin Tanzania
3rd Jun 20117:00 amRNSTexas Well Update
2nd Jun 20116:24 pmRNSAnnual Information Update
19th May 20117:00 amRNSInterim Management Statement
5th May 20117:00 amRNSSuccessful Recompletion Of Texas Well
28th Apr 20117:00 amRNSAnnual Report and Notice of Annual General Meeting
28th Apr 20117:00 amRNSUS Reserves Update
21st Apr 20113:05 pmRNSHolding(s) in Company
14th Apr 20117:00 amRNSNyuni Extension Granted
12th Apr 20117:00 amRNSKiliwani North Development Licence Awarded
30th Mar 20117:00 amRNSFinal Results
21st Mar 20113:08 pmRNSDirector/PDMR Shareholding
18th Mar 20113:40 pmRNSDirector/PDMR Shareholding
17th Mar 20117:00 amRNSInvestor Presentation
16th Mar 20112:33 pmRNSHolding(s) in Company
16th Mar 20117:00 amRNSTanzania Rig Contract
15th Mar 20113:04 pmRNSTotal Voting Rights
15th Mar 20117:00 amRNSMain Securities Market Notice
14th Mar 20117:00 amRNSResult of Open Offer
28th Feb 20115:19 pmRNSHolding(s) in Company
28th Feb 20112:00 pmRNSTotal Voting Rights
25th Feb 201112:46 pmRNSResult of EGM
25th Feb 20118:24 amRNSEGM Presentation
17th Feb 20113:01 pmRNSPublication of Prospectus and Timetable
17th Feb 20117:00 amRNSOil & Gas Reserves and Resources Update
4th Feb 20117:00 amRNSIncrease of Interest in Nyuni PSA, Tanzania
2nd Feb 20117:00 amRNSPlacing and Open Offer
4th Jan 201110:01 amRNSTotal Voting Rights
18th Nov 20107:00 amRNSInterim Management Statement - Third Quarter 2010

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.