If you would like to learn more about future focusIR related events and roundtables, please submit your details here

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksAminex Regulatory News (AEX)

Share Price Information for Aminex (AEX)

Share Price is delayed by 15 minutes
Get Live Data
2.525    0.00 (0.00%)
Bid:
2.40
Ask:
2.65
Spread: 0.25 (10.417%)
Market Cap: £112.99m
AEX Live PriceLast checked at - London Stock Exchange

Intraday Aminex Share Chart

Tanzania Update

17 Jul 2008 07:00

RNS Number : 2562Z
Aminex PLC
17 July 2008
 



17 JULY 2008

AMINEX PLC

TANZANIA EXPLORATION UPDATE

Aminex PLC, the oil and gas company listed in London and Dublin ("Aminex" or the "Company"), provides the following update on its Tanzanian exploration activities.

During the second period of the Nyuni/East Songo-Songo Production Sharing Agreement ("Nyuni" or "Nyuni PSA") new seismic was acquired and two wells were drilled back-to-back, the second of which, Kiliwani North-1 ("KN-1"), encountered a 60 metre gross gas column in Lower Cretaceous sands. A 20 metre interval was perforated and was later successfully production-tested. As announced on 4 June, this well test recorded a flow rate of 40 million cubic feet/day which, together with other data recorded and subsequent lab analysis, satisfies Aminex that the Kiliwani North ("KN") discovery will result in the development of a commercially viable gas field.

The Nyuni PSA is sub-divided into three work periods, the second of which ended in May 2008. The Joint Venture has now applied to the Government of Tanzania to carve out a separate appraisal area for the KN discovery comprising the discovery block and adjoining blocks, while the remainder of the Nyuni area will be explored during the third period under the PSA terms. Commercialisation of KN through the KN-1 well will be fast-tracked as a separate project with the aim of achieving early production. This will be done in parallel with further seismic and exploration drilling over the remaining exploration blocks.

The KN-1 well has now proved that the neighbouring Songo-Songo producing gas field is not a "one-off" or "stand-alone" field and that the surrounding prospects are also capable of producing commercial hydrocarbons. Specific reserves for KN are virtually impossible to establish at this stage because the KN structure extends to the north, beyond the range of existing seismic coverage. A programme of field appraisal and delineation will be conducted in parallel with the early commercialisation of the KN-1 discovery.

KN should be treated as one of several adjoining gas accumulations in acreage held by Aminex and partners which should provide the basis for development of a significant new gas business in the region. In addition to KN, the Nyuni JV is planning to explore and evaluate other prospects in the region. An internal evaluation of all of the prospects identified results in combined prospect sizes in excess of 1 trillion cubic feet of gas on a risked P50 basis. This figure results only from prospect evaluation and should not be confused with a reserves calculation. An independent review of these prospects will be carried out over the next two months which may result in a larger or smaller total. It is too early to provide a meaningful estimate of reserves for the KN discovery at this time, given the absence of structural delineation to the North.

The KN well, now completed and suspended for future production, is located on Songo-Songo Island approximately three kilometres from the Songo-Songo Gas Field's processing facilities operated by Songas, a division of CDC Globelec. From the Songas facilities a 12" subsea pipeline makes a landfall on the Tanzanian coast and then connects to a 16" pipeline which carries gas approximately 200 kilometres to Tanzania's principal city, Dar es Salaam. This common-user pipeline has been transporting gas from the Songo-Songo field since 2004 but is also available to the Nyuni joint venture under the terms of the Nyuni PSA. KN is effectively located next to an emerging gas-gathering hub and to the only major gas pipeline in the entire region. To accommodate increasing gas production, process facilities may need to be expanded and ultimately pipeline capacity may need to be increased, either through adding compression capability or through "twinning" the existing pipeline. Studies are in hand to identify fast-track, temporary alternatives for producing KN gas commercially on a shorter time scale than would be permitted by an upgrading of the Songas facilities, in order to generate early revenues and to build production history

Current gas production in Tanzania is used for power generation, where it replaces expensive imported fuel oil, for firing an important cement plant and increasingly for use by other industries in the Dar es Salaam area. It is clear that industrial and other users will respond positively to increasing supplies of gas, in a country which has traditionally been starved of energy. The Government of Tanzania has recently made it very clear that it attaches great importance to the development of a domestic gas industry as rapidly as possible.

Partners in the Nyuni PSA are: Ndovu Resources Ltd. (Aminex) 40% (operator), RAK Gas Commission (25%), Key Petroleum Ltd. (20%), East African Exploration (10%) and Bounty Oil (5%).

In addition to the Nyuni PSA, Aminex has a 50% interest in the recently awarded Songo-Songo West Production Sharing Agreement in partnership with Key Petroleum Ltd. which acts as operator. Aminex therefore has interests in acreage which virtually surrounds the Songo-Songo producing gas field.

Elsewhere in Tanzania, good progress is being made in preparation for first drilling in the 12,000 square kilometre Ruvuma Basin Production Sharing Agreement where Aminex is in 50-50 partnership with Tullow Oil. The first of two commitment wells is expected to be spudded early in 2009.

For further information:

Brian Hall

Aminex

London

020 7291 3100

Archie Berens

Pelham PR

London

020 7743 6679

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
DRLVQLFFVDBFBBB
Date   Source Headline
18th Nov 20097:00 amRNSInterim Management Statement
16th Nov 20097:00 amRNSFarm Out of Interest in Ruvuma
9th Nov 20097:00 amRNSRetirement of Finance Director
28th Oct 200910:30 amRNSOilbarrel Presentation
27th Oct 20097:00 amRNSSouth Malak-1 Well to be Tested
8th Oct 20097:00 amRNSAppointment of Non-Executive Director
7th Oct 200912:00 pmRNSEgypt - South Malak-1 Well Update
1st Oct 20094:53 pmRNSDirector/PDMR Shareholding
1st Oct 20094:35 pmRNSTotal Voting Rights
9th Sep 20097:00 amRNSIncreased Interest in Nyuni PSA
26th Aug 200912:31 pmRNSExtension of Warrant Subscription Period
25th Aug 20097:00 amRNSHalf Yearly Report
18th Aug 20097:00 amRNSEgyptian Well Spudded
17th Aug 20091:03 pmRNSHolding in Company
14th Aug 200910:27 amRNSHolding(s) in Company
10th Aug 200910:15 amRNSFurther Placing
10th Aug 20097:00 amRNSMain Market Notice
7th Aug 20097:00 amRNSNotice of EGM of Warrant Holders
6th Aug 20095:40 pmRNSDocument Availability
6th Aug 20097:00 amRNSCORRECTION - Result of Open Offer
5th Aug 20097:00 amRNSResult of Open Offer
28th Jul 20099:08 amRNSNotification of Shareholding
24th Jul 20097:00 amRNSMain Market Notice
23rd Jul 200912:47 pmRNSResult of EGM
23rd Jul 20097:00 amRNSPresentation at EGM
17th Jul 20097:00 amRNSPlacing and Open Offer Update
30th Jun 20095:42 pmRNSAnnual Information Update
30th Jun 20097:00 amRNSPlacing and Open Offer
23rd Jun 20092:27 pmRNSBlocklisting Interim Review
10th Jun 20092:42 pmRNSResult of AGM
10th Jun 200911:00 amRNSPresentation at AGM
19th May 20097:00 amRNSInterim Management Statement
30th Apr 20097:00 amRNSAnnual Report and Notice of AGM
1st Apr 20094:00 pmRNSInvestor Presentation
31st Mar 20097:00 amRNSFinal Results
12th Feb 20094:06 pmRNSHolding(s) in Company
23rd Jan 20097:00 amRNSSuccessful Gas Well at South Weslaco, Texas
11th Dec 200812:01 pmRNSBlocklisting Interim Review
8th Dec 20087:00 amRNSSouth Weslaco Well Spud
19th Nov 200812:00 pmRNSAnalyst Presentation
14th Nov 20087:00 amRNSInterim Management Statement
30th Oct 20087:00 amRNSSignificant Well Test Results
28th Oct 20087:00 amRNSMain Market Notice
24th Oct 20089:31 amRNSHolding in Company
22nd Oct 200811:34 amRNSListing of New Shares
20th Oct 20087:00 amRNSAppointment of General Manager for Operations
14th Oct 20087:00 amRNSDirector's Dealings
2nd Oct 20087:00 amRNSDirector's Dealings
10th Sep 20087:00 amRNSUS Update
29th Aug 20087:00 amRNSInterim Results

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.