If you would like to learn more about future focusIR related events and roundtables, please submit your details here

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksAminex Regulatory News (AEX)

Share Price Information for Aminex (AEX)

Share Price is delayed by 15 minutes
Get Live Data
2.525    0.00 (0.00%)
Bid:
2.40
Ask:
2.65
Spread: 0.25 (10.417%)
Market Cap: £112.99m
AEX Live PriceLast checked at - London Stock Exchange

Intraday Aminex Share Chart

Tanzania Update

17 Jul 2008 07:00

RNS Number : 2562Z
Aminex PLC
17 July 2008
 



17 JULY 2008

AMINEX PLC

TANZANIA EXPLORATION UPDATE

Aminex PLC, the oil and gas company listed in London and Dublin ("Aminex" or the "Company"), provides the following update on its Tanzanian exploration activities.

During the second period of the Nyuni/East Songo-Songo Production Sharing Agreement ("Nyuni" or "Nyuni PSA") new seismic was acquired and two wells were drilled back-to-back, the second of which, Kiliwani North-1 ("KN-1"), encountered a 60 metre gross gas column in Lower Cretaceous sands. A 20 metre interval was perforated and was later successfully production-tested. As announced on 4 June, this well test recorded a flow rate of 40 million cubic feet/day which, together with other data recorded and subsequent lab analysis, satisfies Aminex that the Kiliwani North ("KN") discovery will result in the development of a commercially viable gas field.

The Nyuni PSA is sub-divided into three work periods, the second of which ended in May 2008. The Joint Venture has now applied to the Government of Tanzania to carve out a separate appraisal area for the KN discovery comprising the discovery block and adjoining blocks, while the remainder of the Nyuni area will be explored during the third period under the PSA terms. Commercialisation of KN through the KN-1 well will be fast-tracked as a separate project with the aim of achieving early production. This will be done in parallel with further seismic and exploration drilling over the remaining exploration blocks.

The KN-1 well has now proved that the neighbouring Songo-Songo producing gas field is not a "one-off" or "stand-alone" field and that the surrounding prospects are also capable of producing commercial hydrocarbons. Specific reserves for KN are virtually impossible to establish at this stage because the KN structure extends to the north, beyond the range of existing seismic coverage. A programme of field appraisal and delineation will be conducted in parallel with the early commercialisation of the KN-1 discovery.

KN should be treated as one of several adjoining gas accumulations in acreage held by Aminex and partners which should provide the basis for development of a significant new gas business in the region. In addition to KN, the Nyuni JV is planning to explore and evaluate other prospects in the region. An internal evaluation of all of the prospects identified results in combined prospect sizes in excess of 1 trillion cubic feet of gas on a risked P50 basis. This figure results only from prospect evaluation and should not be confused with a reserves calculation. An independent review of these prospects will be carried out over the next two months which may result in a larger or smaller total. It is too early to provide a meaningful estimate of reserves for the KN discovery at this time, given the absence of structural delineation to the North.

The KN well, now completed and suspended for future production, is located on Songo-Songo Island approximately three kilometres from the Songo-Songo Gas Field's processing facilities operated by Songas, a division of CDC Globelec. From the Songas facilities a 12" subsea pipeline makes a landfall on the Tanzanian coast and then connects to a 16" pipeline which carries gas approximately 200 kilometres to Tanzania's principal city, Dar es Salaam. This common-user pipeline has been transporting gas from the Songo-Songo field since 2004 but is also available to the Nyuni joint venture under the terms of the Nyuni PSA. KN is effectively located next to an emerging gas-gathering hub and to the only major gas pipeline in the entire region. To accommodate increasing gas production, process facilities may need to be expanded and ultimately pipeline capacity may need to be increased, either through adding compression capability or through "twinning" the existing pipeline. Studies are in hand to identify fast-track, temporary alternatives for producing KN gas commercially on a shorter time scale than would be permitted by an upgrading of the Songas facilities, in order to generate early revenues and to build production history

Current gas production in Tanzania is used for power generation, where it replaces expensive imported fuel oil, for firing an important cement plant and increasingly for use by other industries in the Dar es Salaam area. It is clear that industrial and other users will respond positively to increasing supplies of gas, in a country which has traditionally been starved of energy. The Government of Tanzania has recently made it very clear that it attaches great importance to the development of a domestic gas industry as rapidly as possible.

Partners in the Nyuni PSA are: Ndovu Resources Ltd. (Aminex) 40% (operator), RAK Gas Commission (25%), Key Petroleum Ltd. (20%), East African Exploration (10%) and Bounty Oil (5%).

In addition to the Nyuni PSA, Aminex has a 50% interest in the recently awarded Songo-Songo West Production Sharing Agreement in partnership with Key Petroleum Ltd. which acts as operator. Aminex therefore has interests in acreage which virtually surrounds the Songo-Songo producing gas field.

Elsewhere in Tanzania, good progress is being made in preparation for first drilling in the 12,000 square kilometre Ruvuma Basin Production Sharing Agreement where Aminex is in 50-50 partnership with Tullow Oil. The first of two commitment wells is expected to be spudded early in 2009.

For further information:

Brian Hall

Aminex

London

020 7291 3100

Archie Berens

Pelham PR

London

020 7743 6679

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
DRLVQLFFVDBFBBB
Date   Source Headline
21st Dec 20157:00 amRNSLOAN EXTENSION & OPERATIONAL UPDATE
19th Nov 20157:01 amRNSINTERIM MANAGEMENT STATEMENT - THIRD QUARTER 2015
19th Nov 20157:00 amRNSPART DISPOSAL AND FARM OUT OF TANZANIAN ASSETS
5th Oct 20157:00 amRNSKiliwani North Update
26th Aug 20157:00 amRNSHalf Yearly Report
24th Aug 20157:00 amRNSCorporate Update
4th Aug 20157:01 amRNSHolding(s) in Company
30th Jun 20154:30 pmRNSStandard Form TR-1
30th Jun 20153:00 pmRNSTotal Voting Rights
30th Jun 20153:00 pmRNSNotification Form
25th Jun 20157:00 amRNSIssue of Equity
4th Jun 20157:00 amRNSLoan Extension and Update
20th May 20154:00 pmRNSResult of AGM
20th May 20157:00 amRNSAGM Statement
19th May 20157:00 amRNSInterim Management Statement - First Quarter
14th May 20157:00 amRNSCompletion of Competent Person's Report
27th Apr 201512:30 pmRNSAnnual Report and Notice of AGM
14th Apr 20157:00 amRNSFinal Results
1st Apr 20157:00 amRNSCorporate Update
16th Mar 20157:00 amRNSTanzania Update
9th Mar 20151:30 pmRNSEgypt West Esh el Mellaha Update
25th Feb 20157:00 amRNSKiliwani North Development Licence Sale
18th Feb 20157:00 amRNSOperations Update
3rd Feb 20157:00 amRNSKiliwani North Development Licence Sale Update
18th Dec 20147:00 amRNSUpdated Corporate Presentation
17th Dec 20147:00 amRNSKNDL - Partial Disposal Update
18th Nov 20147:00 amRNSInterim Management Statement - Q3 2014
12th Nov 20147:00 amRNSKiliwani North Development Licence
20th Oct 20143:58 pmRNSDirector/PDMR Shareholding
17th Oct 20147:00 amRNSDirectorate Change
14th Oct 20147:00 amRNSSale of up to 13% of Kiliwani North
1st Oct 20145:15 pmRNSTotal Voting Rights
24th Sep 20147:00 amRNSMain Securities Market Notice
23rd Sep 20147:00 amRNSEgyptian Operations Update
19th Sep 20147:00 amRNSMain Securities Market Notice
15th Sep 20145:10 pmRNSIssue of Equity
11th Sep 20147:00 amRNSRuvuma Operational Update
4th Sep 20147:00 amRNSNew Corporate Presentation
2nd Sep 20147:00 amRNSAppointment of Non Executive Director
28th Aug 20149:37 amRNSCorrection: Half Yearly Report
28th Aug 20147:00 amRNSHalf Yearly Report
22nd Aug 201412:00 pmRNSResult of EGM
15th Aug 20145:18 pmRNSHolding(s) in Company
6th Aug 20141:30 pmRNSCircular Re: Proposed disposal of Aminex USA Inc
30th Jun 20144:00 pmRNSTotal Voting Rights
20th Jun 20147:00 amRNSDirector/PDMR Shareholding
17th Jun 20147:00 amRNSFurther re Sale of Aminex USA
10th Jun 20145:30 pmRNSHolding(s) in Company
10th Jun 20145:30 pmRNSHolding(s) in Company
3rd Jun 20147:00 amRNSMain Securities Market Notice

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.