The latest Investing Matters Podcast with Jean Roche, Co-Manager of Schroder UK Mid Cap Investment Trust has just been released. Listen here.

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksArmadale Capital Regulatory News (ACP)

Share Price Information for Armadale Capital (ACP)

London Stock Exchange
Share Price is delayed by 15 minutes
Get Live Data
Share Price: 0.75
Bid: 0.70
Ask: 0.80
Change: 0.00 (0.00%)
Spread: 0.10 (14.286%)
Open: 0.75
High: 0.75
Low: 0.75
Prev. Close: 0.75
ACP Live PriceLast checked at -

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

Initial Assay Results Confirm High-Grade Graphite Mineralisation up to 26% TGC

8 Nov 2016 07:00

Armadale Capital Plc / Index: AIM / Epic: ACP / Sector: Investment Company

8 November 2016

Armadale Capital Plc (‘Armadale’ or ‘the Company’)

Initial assay results confirm high-grade graphite mineralisation up to 26% TGC

Armadale, the AIM quoted investment company focused on natural resource projects, is pleased to announce initial assay results with high-grade graphite mineralisation up to 26% Total Graphitic Carbon (‘TGC’) commencing from or near the surface at the Mahenge Liandu Graphite Project in Tanzania (‘Mahenge Liandu’ or ‘the Project’).

Summary:

Initial assay results returned from the 2016 drilling campaign across a range of intervals, up to 47m in width, including: LDRC0004 42m @ 10.2% TGC from 1m including 8m @14.5% from 6m LDRC0007 32m @ 9.3% TGC including 4m @ 22.4 $ TGC and 1m @26.1% TGC LDRC000847m @ 7.4% TGC including 5m @ 14.9% from 3m and 5m @ 15.5% from 42m; Grades are consistent with trends evident from the 2015 assay results, which encompassed 60m @ 10.7% TGC including 24m @ 12.9% TGC and 5m @ 21.5% TGC; The remaining assay results for 2016 will be finalised and announced shortly; Further feedback on JORC modelling, due for completion by the end of Q4 2016, continues to indicate a substantial graphite resource; and, Metallurgical test-work to ascertain initial purity and flake size distribution of graphite concentrate is ongoing.

William Frewen, Chairman of Armadale said:

“These initial assay results are very promising. Of particular importance is the confirmation of near surface high-grade graphite mineralisation at up to 26% TGC at intervals ranging from 1m up to 47m. The wide intervals and high grade nature of the results are encouraging and should positively impact the extraction costs given the close proximity to the surface of the mineralisation. The Board is confident the remaining assay results will further reinforce the Project’s upside potential, which will in turn be further bolstered by ongoing JORC modelling. With demand for natural graphite forecast to accelerate significantly as new lithium-ion battery giga-factories come on stream, Armadale is ideally positioned to capitalise on this compelling supply-demand market fundamentals.

“The Board is delighted with these results, which further reinforces the potential for commercial viability of the Mahenge Liandu graphite project, against a highly favourable macro outlook.”

Assay Results Demonstrate High Quality Graphite Mineralisation

The initial assay results demonstrate Mahenge Liandu has a high-quality, sizeable graphite resource that should meet the strict quality requirements demanded by lithium-ion battery manufacturers. The assay results have confirmed high-grade graphite mineralisation over wide intercepts. It should be noted that Tanzanian graphite usually liberates from a simple crushing and flotation process, without the use of expensive and toxic industrial chemicals. This is beneficial as downstream users are increasingly showing a preference for graphite feedstock which is more environmentally friendly.

Armadale’s team in Tanzania has undertaken a preliminary review of infrastructure and logistical requirements for mining operations to commence and to get product to market. The findings for Mahenge Liandu are encouraging and include:

1) Mains power supply is within 5km;

2) Ground water is plentiful;

3) The Project is circa 80km by road to a central rail hub at Ifakara then 320km direct to the deep sea port at Dar es Salaam; and

4) Labour and materials available within 10km at Mahenge township.

Further Information on Mahenge Liandu

The Mahenge Liandu project is located in the Ulanga District in south east Tanzania, which is approximately 300km south west of Morogoro and 10km from the town Mahenge. High grade graphite mineralisation of up to 33.8% TGC has been demonstrated through analysis of rock-chip samples taken from Mahenge Liandu in June 2016. The samples were taken from graphite schist outcrops over 2km in strike length identified at the Project, which remains open at depth. Previous drilling in December 2015 indicated high-grade mineralisation from the surface, with results including 60m @ 10.7% TGC including 24m @ 12.9% TGC and 5m @ 21.5% TGC.

Competent Person statement

The information in this announcement that relates to exploration results is based on information compiled by Mr Matt Bull, a competent person, who is a Member of the Australian Institute of Geoscientists. Mr Bull has sufficient experience which is relevant to the style of mineralisation and type of deposit under consideration and to the activity which he is undertaking to qualify as a competent person as defined in the 2012 Edition of the “Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves”. Mr Bull consents to the inclusion in the report of the matters based on his information in the form and context in which it appears.

The information communicated in this announcement contains inside information for the purposes of Article 7 of the Market Abuse Regulation (EU) No. 596/2014.

**ENDS**

Enquiries:
Armadale Capital Plc

Charles Zorab, Company Secretary

+44 20 7233 1462
Nomad and broker: finnCap Ltd

Christopher Raggett / Simon Hicks

+44 20 7220 0500
Joint Broker: Beaufort Securities Limited

Jon Belliss

+44 20 7382 8300
Press Relations: St Brides Partners Ltd

Charlotte Page / Susie Geliher

+44 20 7236 1177

Notes

Armadale Capital Plc is focused on investing in and developing a portfolio of investments, targeting the natural resources and/or infrastructure sectors in Africa. The company, led by a team with operational experience and a strong track record in Africa, has a strategy of identifying high growth businesses where it can take an active role in their advancement.

The Company owns the Mahenge Liandu graphite project in south-east Tanzania, which is now its main focus. The project is located in a highly prospective region with proven coarse flake, high grade graphite.

Other assets Armadale has an interest in include the Mpokoto Gold project in the DRC and a portfolio of quoted investments.

More information can be found on the website www.armadalecapitalplc.com.

View source version on businesswire.com: http://www.businesswire.com/news/home/20161107006642/en/

Copyright Business Wire 2016

Date   Source Headline
3rd Oct 20197:00 amRNSNew Corporate Presentation
26th Sep 20197:00 amBUSFurther Offtake Agreement MOU
25th Sep 20192:20 pmRNSInvestor Presentation Evening
16th Sep 20191:41 pmBUSStrategic Financing
16th Sep 201911:14 amBUSInterim Results
11th Sep 20197:00 amBUSMineral Resource Update Nearing Completion
5th Sep 20192:00 pmRNSPrice Monitoring Extension
4th Sep 201911:30 amBUSDownstream Test-Work Commenced
28th Aug 20197:04 amBUSHigh-Grade Assay Results Demonstrate Commercial Potential of Large Graphite Project
22nd Aug 20197:45 amBUSMetallurgical Test-work Completes with Highly Encouraging Results
8th Aug 20197:00 amBUSExceptionally High Purity – Metallurgical Test-work
16th Jul 20197:00 amBUSPositive Metallurgical Test-Work Results
27th Jun 201912:15 pmBUSResult of AGM
27th Jun 20197:00 amBUSAGM Statement
25th Jun 20197:00 amBUSExceptionally High-Grade Assay Results
3rd Jun 20193:00 pmBUSDirector Share Purchase
29th May 201910:15 amBUSFast-tracking Commercialisation Plans
28th May 20197:00 amBUSFinal Results and Notice of AGM
20th May 201910:45 amBUSNew Corporate Presentation
15th May 20197:00 amBUSMahenge Liandu Project DFS Update
26th Apr 20197:00 amBUSMahenge Liandu Graphite Project DFS Update
16th Apr 20197:45 amBUSMahenge Liandu Graphite Project Update
20th Mar 201910:53 amRNSHolding(s) in Company
11th Mar 20197:00 amBUSAppointment of Non-executive Director
27th Feb 201910:15 amBUSStrategic Financing & Corporate Update
19th Feb 20197:00 amBUSMOU Signed for Mahenge Liandu Graphite Project
11th Jan 20197:00 amBUSFormal Agreement Reached for the Sale of the non-core Mpokoto Gold Project
24th Oct 20189:08 amBUSProposed Sale of the non-core Mpokoto Gold Project
21st Sep 20187:00 amBUSAppointment of Marketing Consultant
20th Sep 20187:00 amBUSInterim Results
21st Jun 20183:33 pmBUSResult of AGM
6th Jun 20187:00 amBUSReserve Definition Drilling Commences at Mahenge Liandu Graphite Project
23rd May 20187:00 amBUSFinal Results
21st May 20184:00 pmBUSChange of registered address
3rd May 20187:00 amBUSCommencement of Feasibility Study at Mahenge Liandu
9th Apr 201811:00 amBUSPlacing to Raise £963,500
27th Mar 20188:15 amBUSMahenge Liandu Scoping Study Delivers NPV of US$349m with 122% IRR
19th Mar 20187:00 amBUS31 Year Mine Plan Completed for Mahenge Liandu Graphite Project
2nd Mar 20181:16 pmBUSStatement re Broker
7th Feb 201810:00 amBUSMahenge Liandu Resource Upgrade to 51.1Mt at 9.3% TGC with 75% now in the Indicated Category
29th Jan 20187:00 amBUSExploration Update and Licencing Applications Commence at Mahenge Liandu
12th Jan 20187:00 amBUSArmadale agrees to sell non-core Mpokoto Project
2nd Jan 20187:00 amBUS98.2% Purity Achieved from Bulk Test Work at Mahenge Liandu
19th Dec 20179:00 amBUSIssue of Equity
27th Nov 20177:00 amBUSIssue of Equity
23rd Nov 201710:30 amBUSAppointment of Study Manager and Development Update
7th Nov 20178:31 amBUSExcellent Drilling Results Continue at Mahenge Liandu
20th Oct 20178:30 amBUSFunding Secured to Advance Development of Mahenge Liandu Graphite Project
29th Sep 20177:00 amBUSHigh Value Graphite Concentrate with +48% in Super Jumbo, Jumbo and Large Flake Size Produced
26th Sep 20177:00 amBUSInterim Results

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.