We would love to hear your thoughts about our site and services, please take our survey here.

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksArmadale Capital Regulatory News (ACP)

Share Price Information for Armadale Capital (ACP)

London Stock Exchange
Share Price is delayed by 15 minutes
Get Live Data
Share Price: 0.725
Bid: 0.70
Ask: 0.75
Change: 0.00 (0.00%)
Spread: 0.05 (7.143%)
Open: 0.725
High: 0.725
Low: 0.725
Prev. Close: 0.725
ACP Live PriceLast checked at -

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

Downstream Test-Work Commenced

4 Sep 2019 11:30

 

Armadale Capital Plc / Index: AIM / Epic: ACP / Sector: Investment Company

4 September 2019

Armadale Capital Plc (‘Armadale’ or ‘the Company’)

Downstream Test-Work Commenced at Mahenge Liandu Graphite Project

As Part of Advanced Commercialisation Strategy

Armadale Capital Plc, the AIM quoted investment group focused on natural resource projects in Africa, is pleased to provide an update on its Mahenge Liandu Graphite Project (‘Mahenge Liandu’) in Tanzania, as it rapidly progresses all key steps critical to building a viable commercial operation.

Highlights

Commissioned Batterylimits in Perth, Australia, to expand scope of Definitive Feasibility Study (‘DFS’) to include downstream analysis on high-quality, high-purity flake graphite concentrate produced from Mahenge Liandu during the metallurgical test-work programmeThe downstream test-work includes:Spheroidisation of flake graphite concentrate;Purification of spherical graphite;Electrical characterisation of purified spherical graphite; andProduction of battery cellsResults critical in highlighting the extent to which graphite concentrate from Mahenge Liandu can be used to produce battery cells, a key data point for prospective Chinese off-take partnersBoard optimistic that results will replicate excellent downstream test-work results announced by peers in the region such as ASX listed Black Rock Mining (ASX: BKT; Release dated 14 August 2019) that exceed the industry standard for battery anode materials

Nick Johansen Director of Armadale said: “Our priority in the lead up to the DFS being released towards the end of 2019 is to demonstrate that our commercialisation strategy is gaining momentum. To this end, we are delighted to commence downstream analysis of graphite concentrate, which will generate key data for our prospective Chinese off-take partners. With others in the region, such as Black Rock Mining, achieving their own excellent downstream test-work results, we are optimistic that Mahenge Liandu will deliver similar results to further enhance its already robust economics.”

DetailsArmadale continues to make excellent progress advancing one of the largest high-grade resources in Tanzania, the wholly owned Mahenge Liandu Graphite Project, which has a JORC compliant indicated and inferred mineral resource estimate of 51.1Mt at 9.3% TGC, including 38.7Mt Indicted at 9.3% and 12.4Mt at 9.1% TGC.

Work to date has demonstrated the Project’s potential as a commercially viable deposit, with significant tonnage, high-grade coarse flake and near surface mineralisation (implying a low strip ratio) contained within one contiguous ore body.

Currently, Armadale is completing a DFS based on the results of a Scoping Study that was completed in March 2018. In line with this, Armadale has commissioned Batterylimits in Perth, Australia, to expand the scope of the DFS to include downstream analysis on high-quality, high-purity flake graphite concentrate produced from Mahenge Liandu during the metallurgical test-work programme to verify it meets the stringent requirements of prospective Chinese off-take partners. In turn, a leading graphite processing specialist will undertake a series of tests to determine which high value products can be produced from the finished graphite concentrate product.

Notably, ASX listed Black Rock Mining (ASX: BKT), which also operates in the region, released excellent downstream test-work results on 14 August 2019 that exceed the industry standard for battery anode materials.

The Scoping Study verified Mahenge Liandu could produce a coarse flake, high-purity graphite product underpinning a compelling business case to progress commercialisation plans. Based on a 400,000tpa throughput, it highlighted the following key positive metrics:

Producing an average of 49,000tpa of high-quality graphite products for a 32-year mine life;The near surface nature of the deposit produced a low 1:1 strip ratio for the life of the mine;The Project has a low operating cost of US$408/t, based on an average 12.5% TGC life of mine grade;The Project has a pre-tax IRR of 122% and NPV of US$349m, with a low development capex of US$35m; andThe maximum draw-down during the construction of the Project is US$34.9m and the after-tax payback period is 1.2 years.

There remains significant scope to further improve returns, with staged expansions as the current mine plan is based on circa 25% of the total resource.

The information communicated in this announcement contains inside information for the purposes of Article 7 of the Market Abuse Regulation (EU) No. 596/2014.

**ENDS**

Enquiries:

 

Armadale Capital Plc

Paul Johnson, Non-Executive Director (UK)

Tim Jones, Company Secretary

+44 (0) 20 7236 1177

Nomad and broker: FinnCap Ltd

Christopher Raggett / Max-Bullen Smith

+44 (0) 20 7220 0500

Joint Broker: SI Capital Ltd

Nick Emerson

+44 (0) 1483 413500

Press Relations: St Brides Partners Ltd

Isabel de Salis / Juliet Earl

+44 (0) 20 7236 1177

 

NotesArmadale Capital Plc is focused on investing in and developing a portfolio of investments, targeting the natural resources and/or infrastructure sectors in Africa. The Company, led by a team with operational experience and a strong track record in Africa, has a strategy of identifying high growth businesses where it can take an active role in their advancement.

The Company owns the Mahenge Liandu graphite project in south-east Tanzania, which is now its main focus. The Project is located in a highly prospective region with a high-grade JORC compliant Indicated and inferred mineral resource estimate of 51.1Mt @ 9.3% TGC, making it one of the largest high-grade resources in Tanzania, and work to date has demonstrated Mahenge Liandu’s potential as a commercially viable deposit with significant tonnage, high-grade coarse flake and near surface mineralisation (implying a low strip ratio) contained within one contiguous ore body.

Other assets Armadale has an interest in, include the Mpokoto Gold project in the Democratic Republic of Congo and a portfolio of quoted investments.

More information can be found on the website www.armadalecapitalplc.com.

View source version on businesswire.com: https://www.businesswire.com/news/home/20190904005438/en/

Copyright Business Wire 2019

Date   Source Headline
24th Apr 20248:30 amRNSProposed Investment, Subscription & Board Changes
27th Feb 20242:45 pmRNSMahenge Project Update
19th Dec 202311:15 amRNSBlock listing Interim Review
29th Sep 20237:00 amRNSHalf-year Report
20th Jun 202310:38 amRNSResult of AGM
19th Jun 20237:00 amRNSBlock listing Interim Review
12th May 20237:00 amRNSFinal Results and Notice of AGM
13th Feb 20239:00 amRNSMahenge Project Update
19th Dec 20227:00 amRNSBlock listing Interim Review
29th Sep 20227:00 amRNSHalf-year Report
20th Jun 202210:45 amRNSResult of AGM
17th Jun 20223:30 pmRNSBlock listing Interim Review
23rd May 20227:00 amRNSFinal Results and Notice of AGM
3rd May 20227:00 amRNSIssue of Equity Under Block Admission Arrangements
1st Apr 20227:00 amRNSIssue of Equity Under Block Admission Arrangements
17th Mar 20223:20 pmRNSHolding(s) in Company
11th Mar 20222:45 pmRNSDirector/PDMR Shareholding and TVR
8th Feb 20228:15 amRNSAdvancing Mining Lease and Expanded Footprint
17th Dec 20217:00 amRNSBlock listing Interim Review
15th Dec 20219:30 amRNSManagement Team Enhanced With Key Appointment
1st Dec 20217:00 amRNSIssue of Equity Under Block Admission Arrangements
1st Nov 20217:00 amRNSIssue of Equity Under Block Admission Arrangements
1st Oct 20217:00 amRNSIssue of equity under block admission arrangements
29th Sep 20217:00 amRNSHalf-year Report
3rd Sep 20219:00 amRNSMahenge Mining Licence Granted
31st Aug 20217:00 amRNSNotification of Changes in Major Holdings
6th Aug 20211:25 pmRNSConversion of Loan Notes and Director Shareholding
28th Jun 202112:40 pmRNSBlock Admission & TVR
28th Jun 202112:18 pmRNSAGM Statement
17th Jun 20217:00 amRNSBlock listing Interim Review
28th May 20213:45 pmRNSSubscription and Investment Portfolio Update
28th May 20213:18 pmRNSFinal Results And Notice of AGM
22nd Apr 202110:00 amRNSCompletion of Test Work Program
12th Apr 20219:20 amRNSChange of Adviser
30th Mar 20219:58 amRNSESIA Approval from NEMC of Tanzania
24th Mar 20217:35 amRNSBoard Change
8th Mar 202112:36 pmRNSNotification of Changes in Major Holdings
17th Feb 20214:41 pmRNSSecond Price Monitoring Extn
17th Feb 20214:35 pmRNSPrice Monitoring Extension
10th Feb 202111:00 amRNSArmadale Reports Successful Chinese EPC Test-Work
11th Jan 202111:00 amRNSCSIRO Graphite Test Work Results
17th Dec 20207:00 amRNSBlock listing Interim Review
24th Nov 202012:03 pmRNSTest-Work Commenced with Leading EPC Contractor
20th Nov 20204:41 pmRNSSecond Price Monitoring Extn
20th Nov 20204:36 pmRNSPrice Monitoring Extension
13th Oct 202010:00 amBUSMahenge Graphite Project Update
6th Oct 20204:41 pmRNSSecond Price Monitoring Extn
6th Oct 20204:36 pmRNSPrice Monitoring Extension
29th Sep 20208:46 amBUSHalf-year Report
8th Sep 202012:45 pmBUSEnvironmental and Social Impact Assessment Submitted

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.