Stephan Bernstein, CEO of GreenRoc, details the PFS results for the new graphite processing plant. Watch the video here.

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksArmadale Capital Regulatory News (ACP)

Share Price Information for Armadale Capital (ACP)

London Stock Exchange
Share Price is delayed by 15 minutes
Get Live Data
Share Price: 0.80
Bid: 0.75
Ask: 0.85
Change: 0.00 (0.00%)
Spread: 0.10 (13.333%)
Open: 0.80
High: 0.80
Low: 0.80
Prev. Close: 0.80
ACP Live PriceLast checked at -

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

Downstream Test-Work Commenced

4 Sep 2019 11:30

 

Armadale Capital Plc / Index: AIM / Epic: ACP / Sector: Investment Company

4 September 2019

Armadale Capital Plc (‘Armadale’ or ‘the Company’)

Downstream Test-Work Commenced at Mahenge Liandu Graphite Project

As Part of Advanced Commercialisation Strategy

Armadale Capital Plc, the AIM quoted investment group focused on natural resource projects in Africa, is pleased to provide an update on its Mahenge Liandu Graphite Project (‘Mahenge Liandu’) in Tanzania, as it rapidly progresses all key steps critical to building a viable commercial operation.

Highlights

Commissioned Batterylimits in Perth, Australia, to expand scope of Definitive Feasibility Study (‘DFS’) to include downstream analysis on high-quality, high-purity flake graphite concentrate produced from Mahenge Liandu during the metallurgical test-work programmeThe downstream test-work includes:Spheroidisation of flake graphite concentrate;Purification of spherical graphite;Electrical characterisation of purified spherical graphite; andProduction of battery cellsResults critical in highlighting the extent to which graphite concentrate from Mahenge Liandu can be used to produce battery cells, a key data point for prospective Chinese off-take partnersBoard optimistic that results will replicate excellent downstream test-work results announced by peers in the region such as ASX listed Black Rock Mining (ASX: BKT; Release dated 14 August 2019) that exceed the industry standard for battery anode materials

Nick Johansen Director of Armadale said: “Our priority in the lead up to the DFS being released towards the end of 2019 is to demonstrate that our commercialisation strategy is gaining momentum. To this end, we are delighted to commence downstream analysis of graphite concentrate, which will generate key data for our prospective Chinese off-take partners. With others in the region, such as Black Rock Mining, achieving their own excellent downstream test-work results, we are optimistic that Mahenge Liandu will deliver similar results to further enhance its already robust economics.”

DetailsArmadale continues to make excellent progress advancing one of the largest high-grade resources in Tanzania, the wholly owned Mahenge Liandu Graphite Project, which has a JORC compliant indicated and inferred mineral resource estimate of 51.1Mt at 9.3% TGC, including 38.7Mt Indicted at 9.3% and 12.4Mt at 9.1% TGC.

Work to date has demonstrated the Project’s potential as a commercially viable deposit, with significant tonnage, high-grade coarse flake and near surface mineralisation (implying a low strip ratio) contained within one contiguous ore body.

Currently, Armadale is completing a DFS based on the results of a Scoping Study that was completed in March 2018. In line with this, Armadale has commissioned Batterylimits in Perth, Australia, to expand the scope of the DFS to include downstream analysis on high-quality, high-purity flake graphite concentrate produced from Mahenge Liandu during the metallurgical test-work programme to verify it meets the stringent requirements of prospective Chinese off-take partners. In turn, a leading graphite processing specialist will undertake a series of tests to determine which high value products can be produced from the finished graphite concentrate product.

Notably, ASX listed Black Rock Mining (ASX: BKT), which also operates in the region, released excellent downstream test-work results on 14 August 2019 that exceed the industry standard for battery anode materials.

The Scoping Study verified Mahenge Liandu could produce a coarse flake, high-purity graphite product underpinning a compelling business case to progress commercialisation plans. Based on a 400,000tpa throughput, it highlighted the following key positive metrics:

Producing an average of 49,000tpa of high-quality graphite products for a 32-year mine life;The near surface nature of the deposit produced a low 1:1 strip ratio for the life of the mine;The Project has a low operating cost of US$408/t, based on an average 12.5% TGC life of mine grade;The Project has a pre-tax IRR of 122% and NPV of US$349m, with a low development capex of US$35m; andThe maximum draw-down during the construction of the Project is US$34.9m and the after-tax payback period is 1.2 years.

There remains significant scope to further improve returns, with staged expansions as the current mine plan is based on circa 25% of the total resource.

The information communicated in this announcement contains inside information for the purposes of Article 7 of the Market Abuse Regulation (EU) No. 596/2014.

**ENDS**

Enquiries:

 

Armadale Capital Plc

Paul Johnson, Non-Executive Director (UK)

Tim Jones, Company Secretary

+44 (0) 20 7236 1177

Nomad and broker: FinnCap Ltd

Christopher Raggett / Max-Bullen Smith

+44 (0) 20 7220 0500

Joint Broker: SI Capital Ltd

Nick Emerson

+44 (0) 1483 413500

Press Relations: St Brides Partners Ltd

Isabel de Salis / Juliet Earl

+44 (0) 20 7236 1177

 

NotesArmadale Capital Plc is focused on investing in and developing a portfolio of investments, targeting the natural resources and/or infrastructure sectors in Africa. The Company, led by a team with operational experience and a strong track record in Africa, has a strategy of identifying high growth businesses where it can take an active role in their advancement.

The Company owns the Mahenge Liandu graphite project in south-east Tanzania, which is now its main focus. The Project is located in a highly prospective region with a high-grade JORC compliant Indicated and inferred mineral resource estimate of 51.1Mt @ 9.3% TGC, making it one of the largest high-grade resources in Tanzania, and work to date has demonstrated Mahenge Liandu’s potential as a commercially viable deposit with significant tonnage, high-grade coarse flake and near surface mineralisation (implying a low strip ratio) contained within one contiguous ore body.

Other assets Armadale has an interest in, include the Mpokoto Gold project in the Democratic Republic of Congo and a portfolio of quoted investments.

More information can be found on the website www.armadalecapitalplc.com.

View source version on businesswire.com: https://www.businesswire.com/news/home/20190904005438/en/

Copyright Business Wire 2019

Date   Source Headline
1st Jul 20137:00 amBUSChange of Adviser
28th Jun 20134:55 pmBUSResult of AGM
26th Jun 201310:34 amBUSInvestment Update
6th Jun 20132:17 pmBUSDispatch of Annual report
4th Jun 20137:02 amBUSDirectorate Change
4th Jun 20137:00 amBUSFinal Results
22nd May 20133:16 pmBUSMRI trading Update
17th May 20132:37 pmBUSUpdate
12th Apr 201310:46 amBUSUpdate
30th Jan 20139:32 amBUSBriquetting Update
16th Jan 201311:22 amBUSUpdate - Replacement
16th Jan 201310:12 amBUSUpdate
23rd Nov 20127:00 amBUSDirectorate Change
28th Sep 20127:00 amBUSHalf-yearly Report
17th Sep 20125:23 pmBUSBusiness update - Replacement
13th Sep 20128:39 amBUSBusiness update
23rd Jul 201210:45 amBUSResult of AGM
19th Jul 201211:49 amBUSIssue of Equity
28th Jun 20121:06 pmBUSResult of AGM
27th Jun 20124:01 pmBUSPosting of Annual Report
25th Jun 201212:07 pmRNSDisposal
14th Jun 20127:00 amRNSFinal Results
11th Jun 20125:25 pmBUSListing Delay - Replacement
11th Jun 20124:34 pmBUSListing delay
18th May 20121:08 pmBUSTransaction Update
1st May 20128:26 amBUSTransaction Update
28th Mar 20128:48 amBUSTransaction update
12th Mar 20127:00 amBUSupdate on proposed disposal
17th Feb 201211:16 amBUSResult of EGM
31st Jan 201211:40 amBUSPosting of circular
15th Dec 20113:30 pmRNSProposed Disposal
21st Nov 20114:28 pmBUSProject Update
14th Nov 20116:11 pmBUSHolding(s) in Company
11th Nov 201110:17 amBUSHolding(s) in Company
11th Nov 20117:00 amBUSProject Update
9th Sep 20112:12 pmBUSIssue of Equity
7th Sep 20112:41 pmBUSHalf-yearly Report
18th Aug 201112:40 pmBUSDirectorate Change
4th Jul 201111:41 amBUSHolding(s) in Company
30th Jun 201110:10 amBUSResult of AGM
1st Jun 20117:00 amBUSPlacing of shares
1st Jun 20117:00 amBUSPreliminary results
11th May 20113:05 pmBUSshareholder update
3rd Mar 20112:56 pmRNSShareholder Update
24th Feb 20111:35 pmBUSRelease of report on AMD
22nd Feb 20113:23 pmBUSShareholder Update
16th Feb 20117:00 amBUSDirector/PDMR Shareholding
14th Feb 20117:00 amBUSHolding(s) in Company
9th Feb 201112:26 pmBUSStatement re. Share Price Movement
16th Dec 20107:00 amBUSShareholder Update

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.