The latest Investing Matters Podcast episode featuring Jeremy Skillington, CEO of Poolbeg Pharma has just been released. Listen here.

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksAriana Regulatory News (AAU)

Share Price Information for Ariana (AAU)

London Stock Exchange
Share Price is delayed by 15 minutes
Get Live Data
Share Price: 2.55
Bid: 2.50
Ask: 2.60
Change: 0.05 (2.00%)
Spread: 0.10 (4.00%)
Open: 2.50
High: 2.55
Low: 2.50
Prev. Close: 2.50
AAU Live PriceLast checked at -

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

Q1 2020 PRELIMINARY PRODUCTION RESULTS

15 Apr 2020 07:00

RNS Number : 6163J
Ariana Resources PLC
15 April 2020
 

 

 

 

 

 

 

15 April 2020

AIM: AAU

 

Q1 2020 PRELIMINARY PRODUCTION RESULTS

 

Ariana Resources plc ("Ariana" or "the Company"), the AIM-listed exploration and development company operating in Europe, is pleased to announce its preliminary production results for the quarter ended 31 March 2020 for the Kiziltepe Mine ("Kiziltepe" or "the Project") in Turkey. Kiziltepe is part of the Red Rabbit Joint Venture ("JV") with Proccea Construction Co. and is 50% owned by Ariana through its shareholding in Zenit Madencilik San. ve Tic. A.S. ("Zenit").

 

First Quarter Preliminary Production Results*:

 

Gold production for the quarter was 5,129 ounces (Q4 2019: 7,318 ounces#), exceeding average annualised quarterly guidance by 14%.Total ore processed for the quarter was 53,840 tonnes (Q4 2019: 54,735 tonnes) at an average head grade to the plant of 3.22 g/t gold.Quarterly open-pit ore mined was 92,482 tonnes, breaking a new record, at an average mined grade of 2.54 g/t gold, and total material movement for the quarter was 1,030,697 tonnes.Average metallurgical recovery of gold for the quarter remains high at 92.5%.

 

* All figures are given gross with respect to the JV.

 

Dr. Kerim Sener, Managing Director, commented:

 

"We have entered 2020 with a strong first quarter of production from the Kiziltepe Mine. Unlike the same period last year, production was not impacted by unusually poor weather, resulting in operations proceeding as planned across the Arzu South, Arzu North and Derya pits.

 

"Material movements from the pits were maintained at near all-time highs, while ore production for the quarter broke a new record. This higher production rate is in part to compensate for the expected reduction in grades from the satellite pits. Production from our highest-grade pit, Arzu South, is due to be completed during Q3 2020 and production thereafter will be focused on Arzu North and Derya. In addition, the mine has built up a stockpile of over 130,000 tonnes of ore, sufficient to cover at least eight months of mill feed.

 

"I would like to take this opportunity to thank the mine team for their efforts during a period which coincided with the advent of a global pandemic. All necessary precautionary measures have been implemented at the mine in order to mitigate the health risk as much as practically possible, and the team has continued to operate without interruption during these trying conditions. In addition, the Turkish Government has implemented restrictions on movement around Turkey to limit the spread, although this has not impacted the mining industry specifically. We wish the team and their families well during this time and look forward to maintaining production for the foreseeable future."

 

Q1 2020 Preliminary Production Results

 

 

Unit

Q1 2020

Q4 2019#

Q1 2019#

Open Pit - material moved (wet)

Tonnes

1,030,697

1,082,303

771,190

Open Pit - ore mined (wet)

Tonnes

92,482

74,034

26,746

Open Pit - mined grade

g/t Au

2.54

3.59

4.04

Process plant throughput

Tonnes

53,840

54,735

46,824

Plant feed grade

g/t Au

3.22

4.42

4.83

Metallurgical recovery

%

92.5

92.2

93.7

Gold produced

Troy Ounces

5,129

7,318

7,296

Silver produced

Troy Ounces

67,459

107,074

84,109

 

 

 

#Re-stated following year-end mine and mill reconciliation.

 

This announcement contains inside information for the purposes of Article 7 of EU Regulation 596/2014.

 

 

Contacts:

 

Ariana Resources plc

Tel: +44 (0) 20 7407 3616

Michael de Villiers, Chairman

 

Kerim Sener, Managing Director

 

 

 

Beaumont Cornish Limited

Tel: +44 (0) 20 7628 3396

Roland Cornish / Felicity Geidt

 

 

 

Panmure Gordon (UK) Limited

Tel: +44 (0) 20 7886 2500

James Stearns / Atholl Tweedie

 

 

 

Yellow Jersey PR Limited

Tel: +44 (0) 20 3004 9512

Dom Barretto / Joe Burgess / Henry Wilkinson

arianaresources@yellowjerseypr.com

 

 

Editors' Note:

 

About Ariana Resources:

 

Ariana is an AIM-listed mineral exploration and development company operating in Europe. It has interests in gold production in Turkey and copper-gold assets in Cyprus. The Company is developing a portfolio of prospective licences in Turkey, which contain a total of 1.6 million ounces of gold and other metals (as at end-2017).

 

The Red Rabbit Project is comprised of the Company's flagship assets, the Kiziltepe and Tavsan gold projects, and is part of a 50:50 Joint Venture with Proccea Construction Co. Both assets are located in western Turkey, which hosts some of the largest operating gold mines in the country and remains highly prospective for new porphyry and epithermal deposits. The Kiziltepe Sector of the Red Rabbit Project is fully permitted and is currently in production. The total resource inventory at the Project and its wider area is c. 605,000 ounces of gold equivalent (as at end-2017). At Kiziltepe a Net Smelter Return ("NSR") royalty of up to 2.5% on production is payable to Franco-Nevada Corporation. At Tavsan an NSR royalty of up to 2% on future production is payable to Sandstorm Gold.

 

The 100% owned Salinbas Gold Project is located in north-eastern Turkey and has a total resource inventory of c. 1 million ounces of gold equivalent. The project comprises three notable licence areas: Salinbas, Ardala and Hizarliyayla, all of which are located within a multi-million ounce Artvin Goldfield. The "Hot Gold Corridor" contains several significant gold-copper projects including the 4Moz Hot Maden project, which lies 16km to the south of Salinbas and 7km south of Hizarliyayla. A NSR royalty of up to 2% on future production is payable to Eldorado Gold Corporation on the Salinbas Gold Project.

 

Ariana is also earning-in to 50% of UK-registered Venus Minerals Ltd ("Venus"). Venus is focused on the exploration and development of copper-gold assets in Cyprus.

 

Panmure Gordon (UK) Limited are broker to the Company and Beaumont Cornish Limited is the Company's Nominated Adviser.

 

For further information on Ariana you are invited to visit the Company's website at www.arianaresources.com.

 

 

Ends.

This information is provided by RNS, the news service of the London Stock Exchange. RNS is approved by the Financial Conduct Authority to act as a Primary Information Provider in the United Kingdom. Terms and conditions relating to the use and distribution of this information may apply. For further information, please contact rns@lseg.com or visit www.rns.com.
 
END
 
 
DRLGPUPCCUPUGWC
Date   Source Headline
13th May 20086:00 amRNSTavsan Project Update
21st Apr 20087:01 amRNSJoint Venture
5th Sep 20077:00 amRNSDrilling to Commence
28th Aug 20079:05 amRNSChange of Broker
22nd Aug 200711:15 amRNSAGM Statement
21st Aug 20077:00 amRNSMetallurgical Results
17th Aug 200712:33 pmRNSRule 26 Website
13th Aug 200710:29 amRNSHolding in Company
9th Aug 20078:00 amRNSShares trading on PLUS
25th Jul 20077:00 amRNSManager Appt, Office Change
18th Jul 20077:01 amRNSAcquisition of Surface Rights
16th Jul 20079:46 amRNSHolding in Company
11th Jul 20077:00 amRNSAcquisition of Prospect
6th Jul 200712:44 pmRNSSignificant Shareholding
28th Jun 20077:02 amRNSTavsan Exclusivity Agreement
26th Jun 20079:00 amRNSFinal Results
10th May 20077:01 amRNSResource Estimate
21st Mar 20078:37 amRNSKillick Drilling Results
15th Mar 200711:20 amRNSDirectorate Change
8th Feb 20077:01 amRNSVein 4 1st Drilling Results
16th Jan 20078:30 amRNSKinik Drilling Underway
8th Jan 20077:01 amRNSPositive Drilling Results
22nd Dec 20069:00 amRNSTotal Voting Rights
11th Dec 20069:00 amRNSGoveli Update
27th Nov 200612:38 pmRNSShareholding
20th Nov 20068:38 amRNSSignificant Initial Drilling
17th Nov 20068:30 amRNSJoint Broker appointed
31st Oct 20068:30 amRNSEastern Turkey update
11th Oct 20068:46 amRNSLicence Portfolio Increase
29th Sep 20061:11 pmRNSInterim Results-Replacement
29th Sep 20067:04 amRNSInterim Results
13th Sep 200611:48 amRNSIssue of Equity
8th Sep 200612:17 pmRNSDirectorate Change
23rd Aug 20068:30 amRNSKiziltepe Drilling Underway
9th Aug 20069:00 amRNSAcq. of exploration licences
19th Jul 20063:30 pmRNSAGM Statement
3rd Jul 20068:36 amRNSDirectors' Shareholdings
21st Jun 20069:08 amRNSFINAL RESULTS
23rd May 20069:42 amRNSHolding in Company
11th May 20068:56 amRNSPlacing and Drill Programme
27th Apr 20068:30 amRNSNew Gold Zone Discovery
25th Apr 20068:34 amRNSWide Gold Zone Confirmed
30th Mar 20069:45 amRNSExploration Update
16th Feb 20067:01 amRNSFurther re exploration
2nd Feb 20067:00 amRNSKepez Sampling Results
10th Jan 20067:30 amRNSDrilling Report
9th Jan 200611:40 amRNSHolding(s) in Company
30th Nov 20058:00 amRNSExploration Update
16th Nov 20058:30 amRNSSoil Survey Results
10th Nov 20058:08 amRNSBusiness update

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.