The latest Investing Matters Podcast episode featuring Jeremy Skillington, CEO of Poolbeg Pharma has just been released. Listen here.

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksAriana Regulatory News (AAU)

Share Price Information for Ariana (AAU)

London Stock Exchange
Share Price is delayed by 15 minutes
Get Live Data
Share Price: 2.55
Bid: 2.50
Ask: 2.60
Change: 0.05 (2.00%)
Spread: 0.10 (4.00%)
Open: 2.50
High: 2.55
Low: 2.50
Prev. Close: 2.50
AAU Live PriceLast checked at -

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

Q1 2020 PRELIMINARY PRODUCTION RESULTS

15 Apr 2020 07:00

RNS Number : 6163J
Ariana Resources PLC
15 April 2020
 

 

 

 

 

 

 

15 April 2020

AIM: AAU

 

Q1 2020 PRELIMINARY PRODUCTION RESULTS

 

Ariana Resources plc ("Ariana" or "the Company"), the AIM-listed exploration and development company operating in Europe, is pleased to announce its preliminary production results for the quarter ended 31 March 2020 for the Kiziltepe Mine ("Kiziltepe" or "the Project") in Turkey. Kiziltepe is part of the Red Rabbit Joint Venture ("JV") with Proccea Construction Co. and is 50% owned by Ariana through its shareholding in Zenit Madencilik San. ve Tic. A.S. ("Zenit").

 

First Quarter Preliminary Production Results*:

 

Gold production for the quarter was 5,129 ounces (Q4 2019: 7,318 ounces#), exceeding average annualised quarterly guidance by 14%.Total ore processed for the quarter was 53,840 tonnes (Q4 2019: 54,735 tonnes) at an average head grade to the plant of 3.22 g/t gold.Quarterly open-pit ore mined was 92,482 tonnes, breaking a new record, at an average mined grade of 2.54 g/t gold, and total material movement for the quarter was 1,030,697 tonnes.Average metallurgical recovery of gold for the quarter remains high at 92.5%.

 

* All figures are given gross with respect to the JV.

 

Dr. Kerim Sener, Managing Director, commented:

 

"We have entered 2020 with a strong first quarter of production from the Kiziltepe Mine. Unlike the same period last year, production was not impacted by unusually poor weather, resulting in operations proceeding as planned across the Arzu South, Arzu North and Derya pits.

 

"Material movements from the pits were maintained at near all-time highs, while ore production for the quarter broke a new record. This higher production rate is in part to compensate for the expected reduction in grades from the satellite pits. Production from our highest-grade pit, Arzu South, is due to be completed during Q3 2020 and production thereafter will be focused on Arzu North and Derya. In addition, the mine has built up a stockpile of over 130,000 tonnes of ore, sufficient to cover at least eight months of mill feed.

 

"I would like to take this opportunity to thank the mine team for their efforts during a period which coincided with the advent of a global pandemic. All necessary precautionary measures have been implemented at the mine in order to mitigate the health risk as much as practically possible, and the team has continued to operate without interruption during these trying conditions. In addition, the Turkish Government has implemented restrictions on movement around Turkey to limit the spread, although this has not impacted the mining industry specifically. We wish the team and their families well during this time and look forward to maintaining production for the foreseeable future."

 

Q1 2020 Preliminary Production Results

 

 

Unit

Q1 2020

Q4 2019#

Q1 2019#

Open Pit - material moved (wet)

Tonnes

1,030,697

1,082,303

771,190

Open Pit - ore mined (wet)

Tonnes

92,482

74,034

26,746

Open Pit - mined grade

g/t Au

2.54

3.59

4.04

Process plant throughput

Tonnes

53,840

54,735

46,824

Plant feed grade

g/t Au

3.22

4.42

4.83

Metallurgical recovery

%

92.5

92.2

93.7

Gold produced

Troy Ounces

5,129

7,318

7,296

Silver produced

Troy Ounces

67,459

107,074

84,109

 

 

 

#Re-stated following year-end mine and mill reconciliation.

 

This announcement contains inside information for the purposes of Article 7 of EU Regulation 596/2014.

 

 

Contacts:

 

Ariana Resources plc

Tel: +44 (0) 20 7407 3616

Michael de Villiers, Chairman

 

Kerim Sener, Managing Director

 

 

 

Beaumont Cornish Limited

Tel: +44 (0) 20 7628 3396

Roland Cornish / Felicity Geidt

 

 

 

Panmure Gordon (UK) Limited

Tel: +44 (0) 20 7886 2500

James Stearns / Atholl Tweedie

 

 

 

Yellow Jersey PR Limited

Tel: +44 (0) 20 3004 9512

Dom Barretto / Joe Burgess / Henry Wilkinson

arianaresources@yellowjerseypr.com

 

 

Editors' Note:

 

About Ariana Resources:

 

Ariana is an AIM-listed mineral exploration and development company operating in Europe. It has interests in gold production in Turkey and copper-gold assets in Cyprus. The Company is developing a portfolio of prospective licences in Turkey, which contain a total of 1.6 million ounces of gold and other metals (as at end-2017).

 

The Red Rabbit Project is comprised of the Company's flagship assets, the Kiziltepe and Tavsan gold projects, and is part of a 50:50 Joint Venture with Proccea Construction Co. Both assets are located in western Turkey, which hosts some of the largest operating gold mines in the country and remains highly prospective for new porphyry and epithermal deposits. The Kiziltepe Sector of the Red Rabbit Project is fully permitted and is currently in production. The total resource inventory at the Project and its wider area is c. 605,000 ounces of gold equivalent (as at end-2017). At Kiziltepe a Net Smelter Return ("NSR") royalty of up to 2.5% on production is payable to Franco-Nevada Corporation. At Tavsan an NSR royalty of up to 2% on future production is payable to Sandstorm Gold.

 

The 100% owned Salinbas Gold Project is located in north-eastern Turkey and has a total resource inventory of c. 1 million ounces of gold equivalent. The project comprises three notable licence areas: Salinbas, Ardala and Hizarliyayla, all of which are located within a multi-million ounce Artvin Goldfield. The "Hot Gold Corridor" contains several significant gold-copper projects including the 4Moz Hot Maden project, which lies 16km to the south of Salinbas and 7km south of Hizarliyayla. A NSR royalty of up to 2% on future production is payable to Eldorado Gold Corporation on the Salinbas Gold Project.

 

Ariana is also earning-in to 50% of UK-registered Venus Minerals Ltd ("Venus"). Venus is focused on the exploration and development of copper-gold assets in Cyprus.

 

Panmure Gordon (UK) Limited are broker to the Company and Beaumont Cornish Limited is the Company's Nominated Adviser.

 

For further information on Ariana you are invited to visit the Company's website at www.arianaresources.com.

 

 

Ends.

This information is provided by RNS, the news service of the London Stock Exchange. RNS is approved by the Financial Conduct Authority to act as a Primary Information Provider in the United Kingdom. Terms and conditions relating to the use and distribution of this information may apply. For further information, please contact rns@lseg.com or visit www.rns.com.
 
END
 
 
DRLGPUPCCUPUGWC
Date   Source Headline
14th Dec 20207:00 amRNSPUBLICATION OF CIRCULAR AND GENERAL UPDATE
9th Dec 202012:45 pmRNSDirector/PDMR Shareholding
7th Dec 20208:00 amRNSINCREASE IN JORC RESOURCES AT THE MAGELLAN PROJECT
7th Dec 20207:00 amRNSJOINT VENTURE CONDITIONAL AGREEMENTS COMPLETED
2nd Dec 20207:00 amRNSCONDITIONAL AGREEMENT TO SELL SATELLITE PROJECTS
23rd Nov 20207:00 amRNSKIZILTEPE QUARTERLY OPERATIONAL UPDATE
6th Nov 20207:00 amRNSDirector/PDMR Shareholding
5th Nov 202012:28 pmRNSHolding(s) in Company
30th Oct 202010:49 amRNSUPDATE ON PROPOSED JOINT VENTURE
27th Oct 20209:38 amRNSDirector/PDMR Shareholding
27th Oct 20207:00 amRNSDirector/PDMR Shareholding
20th Oct 20207:00 amRNSARIANA LAUNCHES NOT-FOR-PROFIT INITIATIVE
15th Oct 20207:00 amRNSMAIDEN JORC RESOURCE AT MAGELLAN PROJECT, CYPRUS
12th Oct 20207:00 amRNSQ3 2020 PRELIMINARY PRODUCTION RESULTS
30th Sep 20207:00 amRNSINTERIM RESULTS
29th Sep 20207:00 amRNSUPDATE ON PROPOSED JOINT VENTURE
2nd Sep 20207:00 amRNSNEW HIGH-GRADE VEIN DISCOVERED AT KIZILTEPE
28th Aug 202012:30 pmRNSResult of AGM
27th Aug 20207:00 amRNSKIZILTEPE QUARTERLY OPERATIONAL UPDATE
20th Aug 20207:00 amRNSIssue of Shares
10th Aug 20207:47 amRNSDirector/PDMR Shareholding
6th Aug 20207:00 amRNSDirector/PDMR Shareholding
4th Aug 20208:30 amRNSREVISED AGREEMENT WITH KEFI MINERALS PLC
30th Jul 20207:00 amRNSMAJOR RESOURCE UPDATE: SALINBAS PROJECT
28th Jul 20207:30 amRNSINVESTOR WEBINAR
28th Jul 20207:00 amRNSFINAL RESULTS FOR THE YEAR 31 DECEMBER 2019
9th Jul 20207:00 amRNSQ2 2020 PRELIMINARY PRODUCTION RESULTS
1st Jul 20207:00 amRNSCOMMITMENT BY ÖZALTIN HOLDING A.S.
29th Jun 202012:48 pmRNSFINAL RESULTS AND AUDIT UPDATE
15th Jun 20207:00 amRNSIVRINDI LICENCE AND METALLUGICAL UPDATE
11th Jun 20207:49 amRNS50% INCREASE IN TAVSAN RESOURCE
26th May 20207:00 amRNSKIZILTEPE QUARTERLY OPERATIONAL UPDATE
13th May 20207:00 amRNSCOMPLETION OF INITIAL EARN-IN ON VENUS MINERALS
11th May 20207:00 amRNSKIZILCUKUR JORC RESOURCE UPDATE
7th May 202012:34 pmRNSSHAREPROPHETS SHARES CONFERENCE 2020
1st May 202010:55 amRNS100% REPAYMENT OF CAPITAL LOAN
30th Apr 20201:30 pmRNSEXTENSION AGREEMENT
23rd Apr 20202:05 pmRNSSecond Price Monitoring Extn
23rd Apr 20202:00 pmRNSPrice Monitoring Extension
23rd Apr 20207:00 amRNSSIGNIFICANT RESOURCE UPDATE: KIZILTEPE
15th Apr 20207:00 amRNSQ1 2020 PRELIMINARY PRODUCTION RESULTS
2nd Apr 20207:00 amRNSKEPEZ RESOURCE DEVELOPMENT UPDATE
1st Apr 20207:00 amRNSDUE DILIGENCE UPDATE
26th Mar 20207:00 amRNSMAIDEN DIVIDENDS FROM SUBSIDIARY
24th Mar 20202:05 pmRNSSecond Price Monitoring Extn
24th Mar 20202:00 pmRNSPrice Monitoring Extension
24th Mar 202011:06 amRNSSecond Price Monitoring Extn
24th Mar 202011:00 amRNSPrice Monitoring Extension
24th Mar 20209:05 amRNSSecond Price Monitoring Extn
24th Mar 20209:00 amRNSPrice Monitoring Extension

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.