The latest Investing Matters Podcast episode featuring financial educator and author Jared Dillian has been released. Listen here.

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksAriana Regulatory News (AAU)

Share Price Information for Ariana (AAU)

London Stock Exchange
Share Price is delayed by 15 minutes
Get Live Data
Share Price: 2.75
Bid: 2.60
Ask: 2.90
Change: 0.00 (0.00%)
Spread: 0.30 (11.538%)
Open: 2.75
High: 2.75
Low: 2.75
Prev. Close: 2.75
AAU Live PriceLast checked at -

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

Metallurgical Results

21 Aug 2007 07:00

Ariana Resources PLC21 August 2007 21 August 2007AIM / PLUS Markets: AAU METALLURGICAL RESULTS: KIZILTEPE Ariana Resources plc ("Ariana" or "the Company"), the gold exploration companyfocused on Turkey, is pleased to announce the results of the first metallurgicaltestwork conducted on material from the Kiziltepe Prospect. The results of thesetests keep open the full range of options for the processing of material fromKiziltepe. A scoping study on potential mining and treatment options will beaddressed following an upcoming RC drilling program which aims to extend andupgrade the existing resource. Highlights •Mineralisation is amenable to both carbon-in-leach and heap-leach processing options •Carbon-in-leach simulation tests yielded gold and silver recoveries of 92-98% and 87-92% respectively •Heap-leach simulation tests yielded gold and silver extraction levels of up to 81-90% and 65-77% respectively •Ball mill grindability determined a bond work index of 14.2-15.8 kWh/ tonne Dr. Kerim Sener, Managing Director, commented: "These metallurgical results are extremely encouraging and compare veryfavourably with those obtained from similar deposits in Turkey which are alreadyin production. The results indicate that all of our options for processing ofmaterial from Kiziltepe remain open. We are evaluating strategies for thefurther development of the deposit, with on site processing via heap-leach ortoll-treatment at an existing carbon-in-leach processing facility underinvestigation." "We are now undertaking the groundwork required for our scoping study and makingpreparations for trial mining of the Arzu vein at Kiziltepe. The scoping studywill utilise various data, including these metallurgical test results, todetermine the optimal route for the economic development of the Kiziltepeprospect. Preparations are also underway for further resource definitiondrilling at several veins on the prospect, with the aim of increasing andrefining our existing resource." Testwork Summary Metallurgical testwork was undertaken on four composite samples of mineralisedmaterial sent to the SGS Lakefield laboratory in Canada. The samples selectedfor testwork were collected from surface and drill-core from the Arzu South Veinand represent a range of mineralisation types with varying levels of oxidation,total sulphide content and gold/silver ratio (Table 1). The gold grade of thesamples is within the range of grades determined by the recently announced JORCresource estimate for Kiziltepe. The purpose of the metallurgical testwork wasto determine, via several simulation tests, the amenability of the Kiziltepe'ore' to carbon-in-leach and heap-leach processing. Carbon-in-leach simulation tests were conducted to determine the recovery ofgold and silver from the samples and give the maximum extractability at aspecified grind size (approximately 53 microns). These tests yielded goldrecoveries ranging from 92% to 98% and silver recoveries ranging from 87% to 92%(Table 1). The consumption of reagents in solution was moderate. These resultsprove that the mineralisation is amenable to a conventional carbon-in-leachprocessing flowsheet. Coarse bottle-roll tests at minus 1/4 inch and minus 10 mesh particle size wereperformed to determine the amenability of the samples to heap-leaching (Table1). The simulation tests at minus 10 mesh resulted in gold recoveries of 81% to90% and silver recoveries of up to 65% to 77%. The gold content of the residuesfrom tests conducted on the minus 10 mesh material ranged from 0.6 g/t Au to1.05 g/t Au. The results are likely to be acceptable for a heap-leach operation. Ball mill grindability tests were performed at a grind of 150 mesh on the fourcomposite samples (Table 1) to determine the energy requirements for grindingKiziltepe 'ore'. Results for the four samples fall into the intermediate rangeof hardness and compare favourably with that at similar deposits. Table 1: Summary of results of the metallurgical testwork on Kiziltepemineralisation. 1) Carbon-in-leach simulation tests were undertaken over 48hours. 2) Heap-leach simulation results shown here are those for minus 10 meshover 14 days. Heap-leach simulation results for 1/4 inch mesh were 61-78% forgold and 41-50% for silver. +--------------------------------+-----------------+-----------------+| |Carbon-in-leach |Heap-leach || |Simulation1 |Simulation2 |+------+------+------+----+------+--------+--------+--------+--------+|Sample|Gold |Silver|Ag: |Bond |Au |Ag |Au |Ag || |(g/t) |(g/t) |Au |Work |Recovery|Recovery|Recovery|Recovery|| | | | |Index |(%) |(%) |(%) |(%) || | | | |kWh/t | | | | |+------+------+------+----+------+--------+--------+--------+--------+| 1 |7.53 |52.5 | 7 |15.8 | 97.2 | 87.8 | 88.1 | 66.2 |+------+------+------+----+------+--------+--------+--------+--------+| 2 |5.84 |44.1 | 8 |15.3 | 98.2 | 87.2 | 89.5 | 66.3 |+------+------+------+----+------+--------+--------+--------+--------+| 3 |4.76 |94.1 |20 |15.1 | 95.6 | 86.9 | 80.7 | 65.4 |+------+------+------+----+------+--------+--------+--------+--------+| 4 |5.34 |25.1 | 5 |14.2 | 91.9 | 91.6 | 84.3 | 76.8 |+------+------+------+----+------+--------+--------+--------+--------+ SGS Lakefield concludes: "The Kiziltepe project ore samples responded well to conventionalcarbon-in-leach processing... The heap-leach simulation tests...resulted inextractions that will likely be acceptable for a heap-leach operation." Contacts: Ariana Resources plcMichael Spriggs, ChairmanKerim Sener, Managing Director Tel: 0207 407 3616info@arianaresources.comBeaumont Cornish Limited Tel: 0207 628 3396 Roland CornishBankside ConsultantsMichael Padley / Louise Davis Tel: 0207 367 8888 Editors' note: About Ariana Resources Ariana is a dynamic exploration company focused on the discovery and developmentof epithermal gold-silver and porphyry copper-gold deposits with multi-millionounce potential within the Tethyan metallogenic belt of Turkey. The Company hasa portfolio of prospective licences covering 1,820km2, selected on the basis ofits advanced in-house remote sensing database. The Company's flagship asset is the 235km2 Sindirgi Gold Project, which targetsa series of prospects, within a prolific mineralised district in western Turkey.The project hosts over 45km of gold-silver bearing epithermal quartz veins. Ambrian Partners Limited and King & Shaxson Capital Limited are joint brokers tothe Company and Beaumont Cornish Limited is the Company's nominated adviser. For further information on Ariana you are invited to visit the Company's websiteat www.arianaresources.com. Ends This information is provided by RNS The company news service from the London Stock Exchange
Date   Source Headline
9th May 20247:00 amRNSDokwe Gold Project Revised Pre-Feasibility Study
3rd May 20247:00 amRNSAttendance at 121 Mining Investment, London
1st May 20247:00 amRNS2024 Production Guidance
29th Apr 20247:00 amRNSAriana Resources to host Investor Webinar
25th Apr 20247:00 amRNSMerger with Rockover Holdings and Dual-List on ASX
11th Apr 20245:37 pmRNSHolding(s) in Company
26th Mar 20247:00 amRNSResource and Reserves Update
12th Mar 20247:00 amRNSHigh-Grade Drilling Results at Tavsan
22nd Feb 20247:00 amRNSFinal Drilling Results Received for Kizilcukur
15th Feb 20247:00 amRNSDokwe Due-Diligence Update
31st Jan 20247:00 amRNSAsgard Portfolio Update
17th Jan 20247:00 amRNS2023 Production Results and General Update
21st Dec 20237:00 amRNSSignificant New Drilling Results at Tavsan
6th Dec 20237:00 amRNSFurther Positive Drilling Results at Hizarliyayla
4th Dec 20237:00 amRNSCorporate Presentation
30th Nov 20237:00 amRNSSignificant Drilling Results at Salinbas
28th Nov 20237:00 amRNSDrilling Completed at Kizilcukur
22nd Nov 20237:00 amRNSDue Diligence Drilling Commences in Zimbabwe
20th Nov 20237:00 amRNSAttendance at Mines and Money London
13th Nov 20237:00 amRNSYear-End Update on Asgard Investments
18th Oct 20237:00 amRNSWestern Tethyan - Diamond Drilling Commences
29th Sep 20239:00 amRNSInterim Results
6th Sep 20237:00 amRNSWestern Tethyan - Slivova Positive PEA
23rd Aug 202310:00 amRNSGold Sponsor at the Society of Economic Geologists
16th Aug 20237:00 amRNS2023 Half-Year Production Results
15th Aug 20237:00 amRNSCurrent Exploration & Development at Kiziltepe
24th Jul 20237:00 amRNSKizilcukur Drilling and New Geophysical Targets
20th Jul 20237:00 amRNSVenus Minerals IPO Proceeding
19th Jul 20237:00 amRNSTavsan Mine Construction Recommences
17th Jul 20237:00 amRNSWestern Tethyan - Slivova Resource Update
29th Jun 202311:06 amRNSResult of AGM
21st Jun 20237:00 amRNSHizarliyayla Discovery Drilling
19th Jun 20237:00 amRNSSignificant Drilling Results at Salinbas & Ardala
12th Jun 20237:00 amRNSResolutions for AGM and proxy vote form
8th Jun 20237:00 amRNSHolding(s) in Company
7th Jun 20237:00 amRNSInvestor Presentation
6th Jun 20237:00 amRNSFinal Results For The Year Ended 31 December 2022
10th May 20237:00 amRNSWestern Tethyan Completes Slivova Gold Agreement
3rd Apr 20237:00 amRNSAppointment of Joint Broker
20th Mar 20237:00 amRNSInvestor Event In London
15th Mar 20237:00 amRNS2023 Production Guidance
14th Mar 20237:00 amRNSProject Leopard: First Exploration Licenses Given
13th Mar 20237:00 amRNSGeophysical Survey Results At Kepez
7th Mar 20237:00 amRNSVenus Financing and IPO Update
3rd Mar 20233:59 pmRNSTavsan Mine Construction Update
2nd Mar 20237:00 amRNSWestern Tethyan Completes Due Diligence
27th Feb 20237:00 amRNSInvestor Presentation
22nd Feb 20237:00 amRNSGeophysical Survey Results at Kiziltepe
25th Jan 20237:00 amRNSSUBSTANTIAL DRILLING PROGRESS AT SALINBAS
20th Jan 20237:00 amRNS2022 PRODUCTION RESULTS AND GENERAL UPDATE

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.