Ben Clube, CEO of EnergyPathways, updates investors on progress at MESH. Watch the interview here.

Less Ads, More Data, More Tools Register for FREE
Sponsored Content
Sponsored Content

Pin to quick picksAriana Regulatory News (AAU)

Share Price Information for Ariana (AAU)

London Stock Exchange
Share Price is delayed by 15 minutes
Get Live Data
Share Price: 2.00
Bid: 1.95
Ask: 2.05
Change: 0.00 (0.00%)
Spread: 0.10 (5.128%)
Open: 2.00
High: 2.00
Low: 2.00
Prev. Close: 2.00

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

Significant New Drilling Results at Tavsan

21 Dec 2023 07:00

RNS Number : 5324X
Ariana Resources PLC
21 December 2023
 

 

 

 

21 December 2023

AIM: AAU

SIGNIFICANT NEW DRILLING RESULTS AT TAVSAN

Ariana Resources plc ("Ariana" or "the Company"), the AIM-listed mineral exploration and development company with gold mining interests in Europe, is pleased to announce recent resource and extension drilling results from the Tavsan Project, outlining the progress of the mine development work. The project is operated via Zenit Madencilik San. ve Tic. A.S. ("Zenit"), in partnership with Proccea Construction Co. and Ozaltin Holding A.S. and is 23.5% owned by Ariana.

Highlights:

· Tavsan 2023 drilling campaign is still ongoing, with 8,994.3m completed; comprising 104 diamond drillholes drilled since November 2022.

· Best new intercepts to date include: 

TAV-D023-23 12.1m @ 2.52g/t Au + 9.38g/t Ag from 114.6m

TAV-D027-23 11.0m @ 2.18g/t Au + 5.00g/t Ag from 137.3m

TAV-D025-23 6.2m @ 3.54g/t Au + 4.56g/t Ag from 102.1m

TAV-D020-23 8.8m @ 2.41g/t Au + 5.24g/t Ag from 45.3m

· 2,147 assay results received to date, with 809 remaining samples pending analysis at the Kiziltepe Mine Laboratory ("KML").

· Mine construction is advancing well according to current scheduling, with the first gold production expected during Q2 2024.

Dr. Kerim Sener, Managing Director, commented:

"The latest drilling results from the ongoing drilling programme at Tavsan continue to demonstrate scope for expanding the Resource. Some of our deeper holes on the project have been yielding high grades over c.10m intervals, which is highly encouraging and suggests that there may be further depth continuity to parts of the Tavsan deposit than previously indicated. Further drilling is underway, and we will continue to test the strike and depth continuity of mineralisation, particularly in the North Zone and North Zone Extension. We anticipate that approximately a further 5,000m of drilling is planned.

"We are currently working on revisions to our geological model based on the new data, which will ultimately contribute to a revised Mineral Resource Estimate. This in turn will be used to update production and development plans during Q1 2024, and we remain on track for first gold from Tavsan during Q2 2024."

The information contained within this announcement is deemed by the Company to constitute inside information as stipulated under the Market Abuse Regulations (EU) No. 596/2014 as it forms part of UK Domestic Law by virtue of the European Union (Withdrawal) Act 2018 ("UK MAR").

Tavsan Project Summary

 

The Tavsan Project is located in western Turkey, 130km by road from the Kiziltepe Gold Mine. Following the approval of the Environmental Impact Assessment and associated permitting, Tavsan is being developed as Zenit's second gold mining operation in Turkey, and is currently in construction, with mining scheduled to begin in 2024.

 

Gold mineralisation at Tavsan is epithermal in style, with associated silver and antimony, broadly located along the thrust contact between Jurassic-Cretaceous massively bedded limestone and an overlying Upper Cretaceous multi-lithic ophiolite sequence. In addition, a karstic network within the limestone and fractures within the ophiolitic rocks potentially acted as conduits for the development of jasperoidal and generally silicified rocks, several tens of metres, below and above the thrust fault contact, respectively.

 

The mineralised jasperoid developed along the thrust contact is irregular in form on a ten-metre scale; however, broadly follows the gentle topography on a hundred-metre scale and is largely exposed at surface. In the vicinity of the NE-SW trending fault zone, the thrust is steeper than the topographic gradient, resulting in a more steeply dipping zone of mineralisation. The greatest thickness of gold-bearing jasperoid is observed near the NE-SW fault zone. However, gold concentration appears to have a dominant NW-SE control within the jasperoid as a whole, suggesting the potential for steeply dipping conduit structures cross-cutting the limestone units in the footwall.

 

Drilling Programme

 

The Tavsan mineral resource estimate was last updated and announced on 29 November 2022, with the Resource currently at 6.6 Mt at 1.44 g/t Au and 5.26 g/t Ag for 307,000 oz Au and 1.1 million oz Ag (all categories). The resource is de-risked, with 83% classified in the Measured & Indicated JORC Resource categories. The resource includes a high-grade domain of 1.1 Mt at 2.74 g/t Au and 4.89 g/t Ag for 96,000 oz Au and 171,000 oz Ag. There is a significant additional potential of 1.7 Mt of below cut-off grade material occurring in the 0.5 to 0.7 g/t Au range for c.34,000 oz Au, which is not currently classified as part of the resource.

 

Since November 2022, a resource infill and extension drilling programme has been underway at Tavsan, with drilling still ongoing. 104 drill holes for a total of 8,994.3m of HQ diamond drilling was completed over the North and Main zones at Tavsan. The average depth for all drilling was approximately 86m, with a minimum depth of 16.5m and a maximum depth of 255.2m. Most holes were drilled vertically, with 18 holes angled at 45 to 75o.

Figure 1: Summary map showing the completed drillhole collar positions for the Tavsan Project. 

The best intercepts in this last batch of results included:

· TAV-D023-23 12.1m @ 2.52g/t Au + 9.38g/t Ag from 114.6m

including 1.0m @ 11.83g/t Au + 1.15g/t Au from 114.6m

· TAV-D027-23 11.0m @ 2.18g/t Au + 5.00g/t Ag from 137.3m

including 1.1m @ 5.98g/t Au + 5.98g/t Ag from 139.1m

· TAV-D025-23 6.2m @ 3.54g/t Au + 4.56g/t Ag from 102.1m

including 1.4m @ 10.64g/t Au + 1.84g/t Ag from 102.1m

· TAV-D020-23 8.8m @ 2.41g/t Au + 5.24g/t Ag from 45.3m

including 2.2m @ 6.25g/t Au + 3.75g/t Ag from 45.3m

· TAV-D022-B-23 9.4m @ 1.66g/t Au + 8.06g/t Ag from 225.2m

· TAV-D025-23 12.0m @ 1.23g/t Au + 2.46g/t Ag from 132.6m

· TAV-D109-22 12.9m @ 0.94g/t Au + 2.43g/t Ag from 73.6m

· TAV-D111-22 6.4m @ 1.82g/t Au + 5.94g/t Ag from 56.2m

The Tavsan drilling programme is still underway; with 809 samples for 632.1m of drill core pending for assay and multi-element analysis at the KML. To date, 2,147 results (incl. QA/QC) for 1,776.5m of diamond core have been received from the KML. For previous results from the Tavsan drilling programme, see announcement (AIM: 16 June 2022).

 

Hole ID

From

(m)

To

(m)

Length

(m)

Au

(g/t)

Ag

(g/t)

TAV-D98-22

16.7

17.7

1.0

0.54

0.25

39.1

40.2

1.1

0.72

5.14

TAV-D103-22

19.3

20.4

1.1

0.66

4.54

22.0

26.9

4.9

1.48

13.97

41.5

46.5

5.0

1.04

0.25

50.5

60.7

10.2

0.82

3.86

67.0

68.0

1.0

0.55

0.25

69.0

70.0

1.0

1.09

0.25

73.0

74.0

1.0

0.57

0.25

TAV-D106-22

4.0

6.0

2.0

1.69

7.00

10.0

11.0

1.0

0.76

2.71

27.8

28.8

1.0

1.25

3.77

38.8

40.8

2.0

0.78

1.89

TAV-D108-22

112.0

113.0

1.0

0.50

0.91

113.9

114.9

1.0

0.51

0.72

125.6

126.8

1.2

0.59

3.03

142.5

143.8

1.3

0.52

0.25

146.7

147.9

1.2

0.59

1.49

TAV-D109-22

57.5

62.1

4.6

0.59

3.83

73.6

86.5

12.9

0.94

2.43

91.1

96.4

5.3

1.30

2.29

101.3

103.3

2.0

0.69

0.25

TAV-D111-22

56.2

62.6

6.4

1.82

5.94

70.5

75.4

4.9

0.73

2.70

76.7

77.9

1.2

0.80

1.65

91.0

92.3

1.3

0.71

0.67

TAV-D112-22

16.5

19.3

2.8

1.16

10.60

TAV-D113-22

86.9

92.4

5.5

1.35

4.67

103.4

104.7

1.3

0.55

0.25

TAV-D114-22

47.8

51.6

3.8

0.61

7.53

TAV-D003-23

48.5

49.5

1.0

1.08

6.62

52.3

53.3

1.0

7.16

9.03

TAV-D004-23

43.0

44.0

1.0

0.59

2.46

TAV-D005-23

35.8

37.3

1.5

0.81

7.76

TAV-D011-23

136.4

140.5

4.1

0.85

1.21

TAV-D017-23

23.5

24.7

1.2

0.74

11.02

26.8

27.8

1.0

0.53

2.57

TAV-D018-23

52.2

54.4

2.2

0.65

4.27

TAV-D019-23

79.7

81.7

2.0

0.73

7.05

86.9

90.6

3.7

1.32

5.10

TAV-D020-23

45.3

54.1

8.8

2.41

5.24

including

2.2

6.25

3.75

TAV-D021-23

117.6

120.3

2.7

0.92

16.22

TAV-D022-A-23

206.8

209.6

2.8

1.63

5.53

TAV-D022-B-23

209.3

218.1

8.8

1.03

12.20

220.1

223.0

2.9

0.67

13.21

225.2

234.6

9.4

1.66

8.06

244.7

249.6

4.9

0.65

3.97

TAV-D023-23

114.6

126.7

12.1

2.52

9.38

including

1.0

11.83

1.15

TAV-D024-23

80.3

86.5

6.2

1.36

0.63

91.5

93.2

1.7

2.68

2.26

TAV-D025-23

102.1

108.3

6.2

3.54

4.56

including

1.4

10.64

1.84

129.4

130.6

1.2

0.79

3.42

132.6

144.6

12.0

1.23

2.46

TAV-D026-23

80.9

86.0

5.1

0.81

5.12

101.2

102.4

1.2

0.62

9.15

109.4

112.2

2.8

1.19

3.08

TAV-D027-23

137.3

148.3

11.0

2.18

5.00

including

1.1

5.98

5.98

167.4

170.7

3.3

1.63

4.30

174.5

176.4

1.9

0.73

3.36

TAV-D028-23

115.0

116.1

1.1

0.62

12.06

TAV-D029-23

137.8

140.4

2.6

2.14

16.21

TAV-D032-23

89.7

93.4

3.7

1.15

11.06

TAV-D033-23

121.3

126.3

5.0

1.21

21.39

133.8

134.8

1.0

0.78

2.85

136.7

137.7

1.0

0.93

12.32

TAV-D035-23

8.3

9.3

1.0

2.16

4.11

24.5

25.5

1.0

0.75

4.97

TAV-D036-23

0.5

2.7

2.2

0.67

1.27

13.1

14.6

1.5

1.16

28.59

TAV-D037-23

47.3

48.3

1.0

0.63

0.25

Table 1: Significant gold and silver intercepts calculated for the results from the recent Tavsan drilling programme, using a 0.5g/t Au minimum cut-off and allowing for up to 1m internal dilution.

 

Samples obtained from Tavsan have been sent to the KML for analysis. The day-to-day operational samples from the Kiziltepe Mine have priority over the drilling samples from the development work underway at the Tavsan Project, causing a delay in receipt of results for the latest drilling programme at Tavsan.

 

Tavsan Mapping Programme

 

Detailed geological mapping work was undertaken on the Tavsan Project as part of the wider exploration work completed in 2022-2023 to identify spatial and temporal relationships between mineralisation and structural elements of the Tavsan deposit and the role of the faults in localising and transferring the fertile fluids. The work focussed on collecting geological and structural data via the mapping of local-scale and regional-scale features.

 

The collected data was used to build the 3D geological model (Figure 2) in more detail than had been previously possible. Future work on the project will include geophysical Induced Polarization/Resistivity studies, isotope analysis and geochronology of mineralised samples.

 

Figure 2: 3D model of the Tavsan deposit showing the potential extents of the mineralised jasperoid in pink. 

Sampling and Assaying Procedures

All diamond drill core is currently being processed at the Tavsan Project and analysed at the KML, where results are assessed systematically.

 

HQ-size drill-core samples from the drilling programme at Tavsan were cut in half by a diamond saw and sent for analysis in batches in line with the Company's quality control procedures. During this campaign, core recovery for all drilling conducted at Tavsan was 89%.

 

To date, a total of 1,761 sample results for 1,776.5m of sampled drill core have been returned from the KML (plus 386 QA/QC samples). So far, 6.5% of all analysed samples have also been analysed by ALS Global in Izmir as an external laboratory check as part of the QA/QC procedures used for the project, with a 10% check rate to be achieved by the end of the drilling programme. The results are pending for a further 809 samples (including 171 QA/QC samples).

 

QA/QC sample insertion rates vary depending on the batch size accepted by the laboratory. Ariana sampling protocol requires the insertion of 4 QA/QC samples per batch including 1 blank, 1 CRM, 1 field duplicate and 1 pulp duplicate to assess the accuracy and precision of all stages of the sampling and analysis. During the 2021-2023 drilling, Zenit QA/QC protocol required 1 blank, 1 CRM, 1 field duplicate, 1 pulp duplicate and over 10% samples analysed at an external laboratory. The Zenit QA/QC protocol is under review by both Ariana and Zenit teams following the laboratory upgrade. Since October 2022, KML has been accredited by the Turkish Accreditation Agency (TÜRKAK) with 'TS EN ISO/IEC 17025:2017 General Requirements for the Competence of Experimental and Calibration Laboratory'.

 

All samples were assayed for gold using a 30g fire assay. Multi-element ICP was used for copper, lead, molybdenum, and zinc analyses. Reviews of the assay results have determined that all Quality Control and Quality Assurance samples (blanks, standards, and duplicates) passed the required quality control checks established by the Company, with duplicate samples showing excellent correlation. Laboratory sample preparation, assaying procedures and chain of custody are appropriately controlled. Zenit maintains an archive of half-core samples and a photographic record of all cores for future reference.

 

Contacts:

 

Ariana Resources plc

Tel: +44 (0) 20 7407 3616

Michael de Villiers, Chairman

Kerim Sener, Managing Director

Beaumont Cornish Limited (Nominated Adviser)

Tel: +44 (0) 20 7628 3396

Roland Cornish / Felicity Geidt

Panmure Gordon (UK) Limited (Joint Broker)

Tel: +44 (0) 20 7886 2500

John Prior / Hugh Rich / Atholl Tweedie

WHIreland Limited (Joint Broker)

Harry Ansell / Katy Mitchell / George Krokos

Yellow Jersey PR Limited (Financial PR)

Tel: +44 (0) 207 2201666

 

Tel: +44 (0) 7983 521 488

Dom Barretto / Shivantha Thambirajah /Bessie Elliot

arianaresources@yellowjerseypr.com

 

Beaumont Cornish Limited ("Beaumont Cornish") is the Company's Nominated Adviser and is authorised and regulated by the FCA. Beaumont Cornish's responsibilities as the Company's Nominated Adviser, including a responsibility to advise and guide the Company on its responsibilities under the AIM Rules for Companies and AIM Rules for Nominated Advisers, are owed solely to the London Stock Exchange. Beaumont Cornish is not acting for and will not be responsible to any other persons for providing protections afforded to customers of Beaumont Cornish nor for advising them in relation to the proposed arrangements described in this announcement or any matter referred to in it.

 

Editors' Note:

 

The information that relates to Exploration Results is based upon information compiled by Mr Zack van Coller BSc (Hons), Special Projects Geologist, Ariana Resources plc. Mr van Coller has sufficient experience which is relevant to the style of mineralisation and type of deposits under consideration and to the activity which he is undertaking to qualify as a Competent Person as defined by the 2012 edition of the Australasian Code for the Reporting of Exploration Results, Mineral Resources and Ore Reserves (JORC Code). Mr van Coller has over 10 years of relevant experience in the Technical Assessments of Mineral Properties. Mr van Coller consents to the inclusion in the report of the matters based on his information in the form and context in which it appears.

 

The information in this announcement that relates to exploration results is based on information compiled by Dr. Kerim Sener BSc (Hons), MSc, PhD, Managing Director of Ariana Resources plc. Dr. Sener is a Fellow of The Geological Society of London and a Member of The Institute of Materials, Minerals and Mining and has sufficient experience relevant to the styles of mineralisation and type of deposit under consideration and to the activity that has been undertaken to qualify as a Competent Person as defined by the 2012 edition of the Australasian Code for the Reporting of Exploration Results, Mineral Resources and Ore Reserves (JORC Code) and under the AIM Rules - Note for Mining and Oil & Gas Companies. Dr. Sener consents to the inclusion in the report of the matters based on his information in the form and context in which it appears.

 

About Ariana Resources:

Ariana is an AIM-listed mineral exploration and development company with an exceptional track-record of creating value for its shareholders through its interests in active mining projects and investments in exploration companies. Its current interests include gold production in Turkey and copper-gold exploration and development projects in Cyprus and Kosovo.

 

The Company holds 23.5% interest in Zenit Madencilik San. ve Tic. A.S. a joint venture with Ozaltin Holding A.S. and Proccea Construction Co. in Turkey which contains a depleted total of c. 2.1 million ounces of gold and other metals (as at February 2022). The joint venture comprises the Kiziltepe Mine and the Tavsan and Salinbas projects.

 

The Kiziltepe Gold-Silver Mine is located in western Turkey and contains a depleted JORC Measured, Indicated and Inferred Resource of 222,000 ounces gold and 3.8 million ounces silver (as at February 2022). The mine has been in pro?table production since 2017 and is expected to produce at a rate of c.20,000 ounces of gold per annum to at least the mid-2020s. A Net Smelter Return ("NSR") royalty of 2.5% on production is being paid to Franco-Nevada Corporation.

 

The Tavsan Gold Mine is located in western Turkey and contains a JORC Measured, Indicated and Inferred Resource of 307,000 ounces gold and 1.1 million ounces silver (as at November 2022). Following the approval of its Environmental Impact Assessment and associated permitting, Tavsan is being developed as the second gold mining operation in Turkey and is currently in construction. A NSR royalty of up to 2% on future production is payable to Sandstorm Gold.

 

The Salinbas Gold Project is located in north-eastern Turkey and contains a JORC Measured, Indicated and Inferred Resource of 1.5 million ounces of gold (as at July 2020). It is located within the multi-million ounce Artvin Gold?eld, which contains the "Hot Gold Corridor" comprising several signi?cant gold- copper projects including the 4 million ounce Hot Maden project, which lies 16km to the south of Salinbas. A NSR royalty of up to 2% on future production is payable to Eldorado Gold Corporation.

 

Ariana owns 100% of Australia-registered Asgard Metals Fund ("Asgard"), as part of the Company's proprietary Project Catalyst Strategy. The Fund is focused on investments in high-value potential, discovery-stage mineral exploration companies located across the Eastern Hemisphere and within easy reach of Ariana's operational hubs in Australia, Turkey, UK and Zimbabwe.

 

Ariana owns 75% of UK-registered Western Tethyan Resources Ltd ("WTR"), which operates across south-eastern Europe and is based in Pristina, Republic of Kosovo. The company is targeting its exploration on major copper-gold deposits across the porphyry-epithermal transition. WTR is being funded through a ?ve-year Alliance Agreement with Newmont Mining Corporation (www.newmont.com) and is separately earning-in to up to 85% of the Slivova Gold Project.

 

Ariana owns 58% of UK-registered Venus Minerals Ltd ("Venus") which is focused on the exploration and development of copper-gold assets in Cyprus which contain a combined JORC Indicated and Inferred Resource of 17Mt @ 0.45% to 1.10% copper (excluding additional gold, silver and zinc.

 

Panmure Gordon (UK) Limited and WH Ireland Limited are brokers to the Company and Beaumont Cornish Limited is the Company's Nominated Adviser.

 

For further information on Ariana, you are invited to visit the Company's website at www.arianaresources.com.

 

 

Glossary of Technical Terms:

 

"Ag" chemical symbol for silver;

 

"Au" chemical symbol for gold;

 

"g/t" grams per tonne;

 

"KML" Kiziltepe Mine Laboratory;

 

"m" Metres;

 

"ppm" parts per million;

 

Ends.

This information is provided by RNS, the news service of the London Stock Exchange. RNS is approved by the Financial Conduct Authority to act as a Primary Information Provider in the United Kingdom. Terms and conditions relating to the use and distribution of this information may apply. For further information, please contact rns@lseg.com or visit www.rns.com.RNS may use your IP address to confirm compliance with the terms and conditions, to analyse how you engage with the information contained in this communication, and to share such analysis on an anonymised basis with others as part of our commercial services. For further information about how RNS and the London Stock Exchange use the personal data you provide us, please see our Privacy Policy.
 
END
 
 
MSCNKKBBFBDDABB
Date   Source Headline
30th Sep 20247:00 amRNSInterim Results
26th Sep 20247:00 amRNSAppoints Lead Manager for Planned ASX Dual-Listing
28th Aug 20247:00 amRNSHizarliyayla Drilling and Geophysics Results
22nd Aug 20247:00 amRNSReorganisation of Interests in Türkiye
31st Jul 20247:00 amRNSWestern Tethyan Resources Limited Update
19th Jul 20242:07 pmRNSResult of AGM
15th Jul 20247:00 amRNSChange of Broker
10th Jul 20247:00 amRNS1.2Moz In-Pit Optimised Dokwe Gold Resource
1st Jul 20247:00 amRNSCompletion of Acquisition by Merger
26th Jun 20241:09 pmRNSResult of General Meeting
24th Jun 20247:30 amRNSDokwe Project: Results of detectORE™ Trial
24th Jun 20247:00 amRNSFinal Results for the Year Ended 31 December 2023
13th Jun 20247:00 amRNSDokwe Project: Revised Mineral Resource Estimate
10th Jun 20241:59 pmRNSNOTICE OF GENERAL MEETING
6th Jun 20247:00 amRNSDokwe Project: Due Diligence Completion
4th Jun 20247:00 amRNSCompletion of Drilling Programme at Salinbas
29th May 20247:00 amRNSZenit Mining Operations Update
9th May 20247:00 amRNSDokwe Gold Project Revised Pre-Feasibility Study
3rd May 20247:00 amRNSAttendance at 121 Mining Investment, London
1st May 20247:00 amRNS2024 Production Guidance
29th Apr 20247:00 amRNSAriana Resources to host Investor Webinar
25th Apr 20247:00 amRNSMerger with Rockover Holdings and Dual-List on ASX
11th Apr 20245:37 pmRNSHolding(s) in Company
26th Mar 20247:00 amRNSResource and Reserves Update
12th Mar 20247:00 amRNSHigh-Grade Drilling Results at Tavsan
22nd Feb 20247:00 amRNSFinal Drilling Results Received for Kizilcukur
15th Feb 20247:00 amRNSDokwe Due-Diligence Update
31st Jan 20247:00 amRNSAsgard Portfolio Update
17th Jan 20247:00 amRNS2023 Production Results and General Update
21st Dec 20237:00 amRNSSignificant New Drilling Results at Tavsan
6th Dec 20237:00 amRNSFurther Positive Drilling Results at Hizarliyayla
4th Dec 20237:00 amRNSCorporate Presentation
30th Nov 20237:00 amRNSSignificant Drilling Results at Salinbas
28th Nov 20237:00 amRNSDrilling Completed at Kizilcukur
22nd Nov 20237:00 amRNSDue Diligence Drilling Commences in Zimbabwe
20th Nov 20237:00 amRNSAttendance at Mines and Money London
13th Nov 20237:00 amRNSYear-End Update on Asgard Investments
18th Oct 20237:00 amRNSWestern Tethyan - Diamond Drilling Commences
29th Sep 20239:00 amRNSInterim Results
6th Sep 20237:00 amRNSWestern Tethyan - Slivova Positive PEA
23rd Aug 202310:00 amRNSGold Sponsor at the Society of Economic Geologists
16th Aug 20237:00 amRNS2023 Half-Year Production Results
15th Aug 20237:00 amRNSCurrent Exploration & Development at Kiziltepe
24th Jul 20237:00 amRNSKizilcukur Drilling and New Geophysical Targets
20th Jul 20237:00 amRNSVenus Minerals IPO Proceeding
19th Jul 20237:00 amRNSTavsan Mine Construction Recommences
17th Jul 20237:00 amRNSWestern Tethyan - Slivova Resource Update
29th Jun 202311:06 amRNSResult of AGM
21st Jun 20237:00 amRNSHizarliyayla Discovery Drilling
19th Jun 20237:00 amRNSSignificant Drilling Results at Salinbas & Ardala

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Make Better Investment Decisions

Register for FREE

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.