Less Ads, More Data, More Tools Register for FREE

Pin to quick picksAriana Regulatory News (AAU)

Share Price Information for Ariana (AAU)

Share Price is delayed by 15 minutes
Get Live Data
2.10    0.00 (0.00%)
Bid:
0.00
Ask:
0.00
Spread: 0.20 (10.526%)
Market Cap: £56.51m
AAU Live PriceLast checked at - London Stock Exchange

Intraday Ariana Share Chart

Kiziltepe Drilling Underway

23 Aug 2006 08:30

Ariana Resources PLC23 August 2006 23 August 2006 AIM: AAUDRILLING UNDERWAY AT KIZILTEPE GOLD PROSPECT Ariana Resources plc ("Ariana" or "the Company"), the gold exploration companyfocused exclusively on Turkey, announces the commencement of a 3,700m diamonddrilling programme at the Kiziltepe prospect within the Company's 100% ownedSindirgi gold project in western Turkey. • Drill rig mobilised and phase one of a 3,700m diamond core programme underway • Previous intersections include 6.29 g/t Au over 13.5m from channel sampling at surface • Kiziltepe prospect hosts at least 19km in strike length of gold-silver bearing quartz veins A total of 37 drill holes are planned at the Kiziltepe prospect to depths of upto 150m. The programme has been designed to test the depth and gradecontinuation of five principal gold-silver bearing epithermal quartz veins,namely, Arzu South, Arzu North, Banu, Hale and Vein 5. A key objective of thecurrent programme is to define an initial gold resource for the Arzu South veinin compliance with the JORC code. Drilling on the Arzu South vein is expected tobe completed by late November 2006 and initial results announced thereafter. Ariana acquired the Kiziltepe prospect as part of the Sindirgi gold project fromNewmont Altin Madencilik Limited Sirketi, a subsidiary of Newmont MiningCorporation (NYSE & ASX: NEM; TSX: NMC) ("Newmont") in January 2005. Newmontretains a Net Smelter Returns royalty of up to 2.5% on future gold productionfrom the Sindirgi project. Independent technical consultants SRK (UK) Limited have previously prepared ageological model of 150,000 ounces at Arzu South (not a resource as defined bythe JORC code), representing approximately 5% of the known vein system atKiziltepe, based on an average gold grade of 4.2 g/t to an approximate depth of150m. Steven Poulton, Chief Executive, commented: "The start of drilling at the Kiziltepe prospect, which hosts over 19km instrike length of gold-silver bearing epithermal quartz veins, represents asignificant milestone towards defining an initial resource estimate. Ourdecision to focus on the Arzu South vein is based on encouraging drilledintersections reported by previous operators including 7.23 g/t over 10m andextensive channel sampling by Ariana which returned grades of up to 6.29 g/t Auover 13.5m. "With a strong balance sheet from our successful £2 million financing in May2006, a portfolio of prospective projects and a strong technical team on theground, Ariana is extremely well placed to deliver value for its shareholders." Contacts: Ariana Resources plcSteven Poulton, Chief Executive Tel: 01235 511 767s.j.poulton@arianaresources.cominfo@arianaresources.com Mobile: 0797 408 6712 Bankside ConsultantsMichael Padley / Susan Scott Tel: 020 7367 8888 About the Kiziltepe prospect The Kiziltepe prospect lies within a 36 km2 ten-year renewable operating licencewhich forms part of the Company's 100% owned 224 km2 Sindirgi gold project inBalikesir Province, western Turkey. The project area lies approximately 100kmeast of the one million ounce vein-hosted Ovacik gold mine and 115km northwestof the five million ounce Kisladag gold mine. Kiziltepe hosts at least 19km in strike length of gold-silver bearinglow-sulphidation epithermal quartz veins across an area of at least 3km by 1km.Individual veins are exposed for up to 700m and widths vary between 1m and 14m.The main veins trend NW, dip to the northeast and are hosted within Miocene ageandesitic volcanic rocks. The majority of exploration work to date at Kiziltepehas focused on the Arzu South vein, where results from drilling by previousowners include intersections of 7.23 g/t over 10m and 10.55 g/t over 7.5m.Channel sampling by Ariana (previously reported in November 2005) returned abest intersect of 6.29 g/t Au over 13.5m. Sampling and Assaying Procedures The drill core will be transported to the Company's core storage facility in thelocal town of Sindirgi for logging, splitting and photographing. Half the corewill be prepared as one meter samples and sent to the ALS Chemex preparationfacility in Izmir and a 50g fire assay undertaken at the ALS Chemex laboratoryin Vancouver. Regular standard, duplicate and blank samples are being used inthe sample sequence in line with the Company's quality control procedures. The drilling program will be managed by Ariana's exploration team under thesupervision of Dr Kerim Sener (Exploration Director) and Mr Muhannad Arar(Projects Manager). Dr Sener is a graduate of the University of Southampton inGeology, he also holds a Master's degree from the Royal School of Mines (Imperial College, London) in Mineral Exploration and a doctorate from theUniversity of Western Australia. He is a Fellow of The Geological Society ofLondon and has worked in geological research and mineral consultancy in SouthernAfrica and the Northern Territory of Australia. He has read and approved thetechnical disclosure in this regulatory announcement. About Ariana Resources Ariana is a well funded technology-driven exploration company focused on thediscovery of epithermal gold-silver and porphyry copper-gold deposits withmulti-million ounce potential within the Tethyan metallogenic belt of Turkey.The Company has a portfolio of prospective licences covering approximately1,000km2, selected on the basis of its advanced in-house remote sensingdatabase. Ariana's broker is Ambrian Partners Limited and Beaumont CornishLimited is the Company's nominated adviser. For further information on Arianayou are invited to visit the Company's website at www.arianaresources.com. This information is provided by RNS The company news service from the London Stock Exchange
Date   Source Headline
29th May 202612:45 pmRNSResult of AGM and Updated Corporate Presentation
26th May 20268:30 amRNSRevised PFS for Optimised Dokwe Gold Project
26th May 20267:00 amRNSAgreement for Strategic Investment - Tranche 2 CDI
18th May 20267:00 amRNSSale of 13.6% Interest in Zenit for US$19.5m Cash
14th May 20267:00 amRNSResource Growth Potential Identified at Dokwe
7th May 20267:00 amRNSUpdate on Dokwe Project Feasibility Activities
30th Apr 20267:00 amRNSQuarterly Activities Report 31 March 2026
29th Apr 20267:00 amRNSNotice of AGM
14th Apr 20267:00 amRNSAppointment of New Non-Executive Chairman
31st Mar 202610:30 amRNSAppointment of Chief Financial Officer
31st Mar 20267:00 amRNSFinal Audited Results for the Year Ended 31 Dec 25
11th Mar 20267:00 amRNSHigh-Grade Intercepts Identified at Dokwe North
11th Mar 20267:00 amRNSHigh-Grade Intercepts Identified at Dokwe North
25th Feb 202612:00 pmRNSResult of GM
4th Feb 20267:00 amRNSSettlement of Outstanding Debt to RiverFort & TVR
2nd Feb 20267:00 amRNS-RAttendance at 121 Mining Investment, Cape Town
30th Jan 202611:00 amRNSQuarterly Activities Report 31 December 2025
23rd Jan 20261:32 pmRNSXinhai Strategic Investment and Notice of GM
21st Jan 20267:00 amRNSDrilling Results from Main & South Zones at Tavşan
8th Jan 20267:00 amRNSHolding(s) in Company
23rd Dec 20257:00 amRNSInitial Drilling Results - Dokwe Gold Project
23rd Dec 20257:00 amRNSInitial Drilling Results - Dokwe Gold Project
22nd Dec 20257:00 amRNSBinding Definitive Agreement for Xinhai Investment
22nd Dec 20257:00 amRNSBinding Definitive Agreement for Xinhai Investment
12th Dec 20257:00 amRNSDokwe Drilling Update
9th Dec 20257:00 amRNSTerm Sheet for Strategic Investment in Dokwe
3rd Dec 202511:00 amRNSTavsan First Pour
27th Nov 20257:00 amRNSKizilcukur Drilling Identifies Potential Extension
24th Nov 20259:15 amRNS-RMines and Money London Conference Attendance
13th Nov 20257:00 amRNSHigh-Grade Gold in Drilling Results at Tavsan Mine
4th Nov 20257:00 amRNSExploration Drilling Commences at >1Moz Dokwe
31st Oct 20257:00 amRNSQuarterly Activities Report
23rd Oct 20257:00 amRNSSignificant Dokwe Exploration Update
15th Oct 20257:00 amRNSRig Mobilisation for Drilling Programme at Dokwe
9th Oct 20257:00 amRNS-RPresentation at Marketopen's Investor Sundowner
8th Oct 20257:00 amRNSTavşan Mine is now Fully Operational
30th Sep 202512:00 pmRNS-RCorporate Presentation - September 2025
29th Sep 20257:00 amRNSInterim Results
16th Sep 20257:00 amRNSSummary of Projects with Drilling Planned at Dokwe
10th Sep 20257:00 amRNSCommence Trading on Australian Securities Exchange
8th Sep 202512:37 pmRNSDual Listing on ASX and Total Voting Rights
28th Aug 20257:00 amRNS-RAfrica Down Under Conference Attendance in Perth
22nd Aug 20258:45 amRNSResults of ASX Offer for Dual Listing
18th Aug 20259:30 amRNSDirector/PDMR Shareholding
15th Aug 20258:21 amRNSDual Listing – Close of ASX Offer
8th Aug 20257:00 amRNSASX Offer Open and Tavsan Update
29th Jul 202510:45 amRNSLodgement of ASX Dual Listing Prospectus
28th Jul 20258:36 amRNSDual Listing – Close of Institutional Bookbuild
14th Jul 20257:00 amRNSOperational Update: Tavsan
9th Jul 20251:35 pmRNSResult of AGM

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.