RE: Bess project6 Feb 2019 14:58
Thanks Jamiejojo for posting the advisory USTDA document on energy storage. The introduction to this document sets out what I believe Bushveld is possibly uniquely well-placed to deliver in SA and regionally -
'It has been suggested that the adoption of energy storage technologies could
provide a cost-effective way of improving South Africa’s electric grid. Specifically, the adoption of
energy storage could offset the need to use diesel and other fossil fuels for peaking and baseload power,
provide backup power for commercial and industrial operations during blackouts, and increase the
capacity of South Africa’s electric grid to successfully integrate renewable electricity generation
sources, especially intermittent power sources such as solar and wind. '
This is environmentally sound as well as good for business.
Some further extracts from the 541 page document (I haven't read it all!) 'Manufacturers that provide reliable systems at competitive prices through efficient manufacturing practices will achieve increased market share and improved bankability.'
'Vanadium flow batteries will likely be a dominant long-duration discharge application in the coming 5 years, and they could dominate the long-duration market (>4 hours) over the middle to long term through 2030.'
All very positive indeed for Bushveld should we get through the successful commissioning and testing of the Eskom battery.