Is is 352 bopd commercially viable?18 Jul 2018 19:07
This is an extract from an RNS 7081Z(below) on UKOG's website. In this RNS it states "given the 323 bopd stable pumped rate achieved in 2016 and the 32 million barrels most likely OIP calculated by Xodus in 2017, is a strong candidate for commercial viability. "
If the 323 bopd then was accepted as a commercially viable rate, then does this mean that the recent 352 bopd is commercially viable too?
RNS Number : 7081Z
UK Oil & Gas Investments PLC
19 December 2017
2018 Horse Hill Flow Test Programme
Following a short period of civil works to upgrade site facilities, a 150-day production testing programme focused upon the Portland, KL3 and KL4 reservoirs will commence. As commercially viable initial flow rates were established by the 2016 flow tests, the 2018 testing programme's goal is to confirm that HH-1's reservoirs are each connected to a commercially viable oil volume, thus enabling a declaration of commerciality to be made.
The Portland, KL3 and KL4 flow tests, each planned for around 30-40 days duration, will consist of a sequence of stabilised steady state flow and shut in periods to establish the oil in place ("OIP") directly connected to the well. A short maximum flow-rate test will also be included for each reservoir. If time permits, a further short-term test of a deeper untested Kimmeridge reservoir may be undertaken.
Testing will commence with the Portland reservoir, which in the Company's opinion, given the 323 bopd stable pumped rate achieved in 2016 and the 32 million barrels most likely OIP calculated by Xodus in 2017, is a strong candidate for commercial viability. Subject to a successful test, a Portland commercial declaration is expected to be made by mid-2018. A Kimmeridge commerciality declaration would follow programme completion and analysis of reservoir engineering data.