RE: New calculations for 2.4p5 Jan 2020 01:42
OilMasterUK
That would mean that with HH1,2,& 3 in production by September 2020 HH would be at full production with capacity of 3500 BOPD
That leaves HH up to 4 HH kimmeridge sidetrack wells over the allowed production threshold once a Portland CPR is published.
Happy days ahead in my opinion after the 90 day flow tests of HH2.