RE: Cost of Expanding from 2mw to 10mw output30 Apr 2023 21:20
Brad …I think you right about Opara gas .. this was on a GE power plant case study regarding Opara dual power turbine …,,It was commissioned using diesel with a planned conversion to natural gas once construction of a gas pipeline from nearby gas fields was complete. I assume, they like most of us were hoping that Tlou would be a lot further down the track by now. And may be go down the LPG route for now .. but would prefer a pipeline may be in the future .. But can’t see that happening for at least 3-5 years or more. May be sooner if they get brought out but a large company with big pockets!