RE: Imbibation26 May 2018 21:11
LeMajor, your article on imbibition was truly educational, much appreciated. There has been a lot of traffic on how many wells a full development of HRZ would take, this I find a little depressing as DW has always maintained that AE is not a production company, however when the long soak yields the fruits we all want there will be interest from the big oil boys who are watching from the sidelines. DW will want to cream the curve but may not wait for a slack handful of wells. Perhaps one which is drilled through the conventional target and then sidetracked into HRZ. This god willing will be during 2019. I for one do not want to wait 2 to 3 years for an exit. Life is too short. Just hope the creaming curve is really steep.
Happy Bank holiday.