The key paragraph that sums up Molly16 Feb 2026 10:57
The existing drill data, with grades including 6.5m at 10.5 g/t and 1m at 200 g/t, excellent geophysical signatures and approximately 300 hectares of alluvial excavation, provide us with high confidence that we either are targeting a substantial gold-bearing vein system that lies beneath the alluvial workings, or a complex network of mineralised veins exists within the adjacent higher-elevation terrain.
On top of this THERE OWN INTERNAL NETWORK gets it from LOI to actual drilling in one week. Thats the fastest turnaround I have ever seen in my entire trading career:
‘With five drill crews and three rigs being utilised, secured quickly through the Board's operational network, means that we will quickly understand the direction the programme needs’
This next quarter is going to be massively news rich. Come on MMs surely now no one needs a reason to load up heavy here ?
Am I the only one this excited on a Monday morning. Thinking of loading heavy again now