RE: Kread you miss a lot of stuff out...Let me add13 Oct 2023 05:09
Calcs based on asset value alone below.
Pyebridge site (our only producing plant) asset value is 6 million, Capacity is 9MW, current MCis 3.8million.
The above equates to £420,000 per MW(asset value alone)
So after the investment when we are producing 50MW inside of the JV and potentially 15MW of wholly owned production, our potential MC based on asset value alone could be 23 million..
Much upside ahead…
Calcs regarding annual profit cannot be realistically calculated because of the shear number of variables currently.
Timescale of the above are also impossible to guesstimate based on MAST’s previous performance.. Although after the cash arrives we will not be restrained by cash flow issues.
Only way is up up up. IF the cash from the JV lands…