RE: Upper zone 400ft section21 Feb 2020 14:13
Mickey, a similar result to the lower zone would be exceptional.
It would be interesting to see what the max capability is of the well and with the right equipment being shipped in that can easily be tested.
Regardless the results of Cascadura are off the scale. If PB and the team continue to prove up the block who knows where this could go and success rate on the current model is 2/2 to date so 100%.
I think it makes sense to fast track these next wells not only to get a handle of the scale to determine what pipelines/processing plants are required but also to maximise company value if there is a potential JV or TO suitor waiting and watching.