BAM EAST GOLD PROJECT15 Aug 2017 13:05
London, United Kingdom - 27 July 2017
Landore Resources Limited (AIM:LND) ("Landore Resources" or "the Company") is pleased to provide this progress report on extension and infill drilling of the BAM East Gold Deposit on its Junior Lake Property, Ontario, Canada ("BAM East Gold Project").
Highlights:
· The Spring/Summer drilling campaign has concluded with 65 HQ and NQ diamond drill-holes (0417-561 to 0417-625) having been drilled, for a total of 11,060 metres (m). The drilling successfully infilled the Inferred portion of the Deposit and extended it to the east and west for a total length of 1,000 metres. The Deposit remains open along strike to the east and west and down dip.
· Field exploration commences 3 August 2017 on Junior Lake concentrating on the Archaean greenstone belt which traverses the property from east to west for 19 kilometres and hosts the BAM East Gold Deposit. Three Geological teams supported by a Geophysics contractor will be engaged on this programme.
An extensive field exploration programme has commenced on 3 August 2017 at Junior Lake aimed at identifying potential drill targets for the planned Autumn drilling campaign. This follows review of the geology and mineralisation on several of the Company's earlier gold findings including the re-interpretation of the Lamaune Gold Deposit. The reviews concluded that several of these gold prospects, including the Lamaune Gold Deposit, were similar in geology and mineralisation to the BAM East Gold Deposit. The review "encouraged the Company's belief that the favorable geological lithology containing the BAM East Gold Deposit has the potential to continue along the full east west extent of the greenstone belt traversing the Landore-Lamaune properties"
The Spring/Summer drilling campaign is now complete with 65 HQ and NQ diamond drill-holes (0417-561 to 0417-625), for a total of 11060 metres (m), drilled for this campaign. The processing of the core, including logging, sampling and assaying, is ongoing and results will be reported when received and collated. Note results have been received for 34 Resource and 3 exploration drill holes with results pending for the remaining drill results.
In addition all data is being collated for the preparation of a resource update scheduled for completion in Q4 2017.
I will probably await all results released before making a preliminary estimate of the resource, the latest results include some good intercepts and suggest there is more to come as the company have continued to state the deposit remains open along strike to the east and west and down dip.