RE: SNOUTS IN THE TROUGH9 Jun 2023 11:38
Tamer, You make a good point that the drilling, and prep for, are still going forward at Hurricane with the switch being made from Diamond to RC drilling.
Also the expansion and progression of the sampling programme at Lolworth is still going forward.
The 'scaling back' of activity is likely the switching to the cheaper drilling method at Hurricane and the fact that there will be one drill initially located at Hurricane (assume that the initial plan would have been both drills to be turning),
So activity has not stopped and progress will still be made in Queensland.