Drilling and stuff........19 Jun 2024 13:47
The 16 Feb RNS stated they were mobilizing the G40 rig to A5 Deep Well site, on the 25 March the rig was onsite, next week will be 3 months since the rig was onsite - surely the A5 Deep Well sidetrack has commenced by now, nearing a flow test? It shouldn't take more than a month or so to complete a 400m sidetrack - drill problems?
The Block 8 license is 2 months on since CC said it should be signed off in 'weeks' by the Energy Ministry, but we're still waiting on the completion of the acquisition of Procyon Investments FZE, the UAE registered owner of EPC Munai LLP, which is the Kazakh registered owner of the Block 8 Contract Area - pretty much like his unrealistic TD timeframes (4 months for the 803 Deep Well to TD lol). The two wells that have been drilled on Block 8 are ready to test, have the perforating pipes been put in place ready for the frack charges to be fired, probably not, let's hope the drilling fluid is the right balance - we don't have to worry about having a stuck pipe on these two wells ;- )
I don't think it will be the next RNS that lights the share price, but the one after July-August when these wells, 803 Deep Well (and possibly 802), B8 license/ other and CE to boot have come to fruition along with the 8 August shallows due diligence deadline being met with a nod to buy the shallows. It looks like CASP are cracking on with the shallows with 815 Shallow Well tender - no doubt incase the shallows sale doesn't go though, 155/ 806 Shallow Wells should have hit TD by now so I'm expecting confirmation in the next RNS - this-next week?
A5 drilling/ 802 Specialist onboard or Block 8 license could surprise, though not holding my breath here.
With the A8 Deep Well drilling to 5,500m and fracking/ flowing with no problems it would seem they've cracked the right drilling fluid balance so perhaps we've only got to worry about stuck pipes and blocked frack holes from now on? we'll soon know for sure when they frack the two B8 deep wells, 802, 803 and the A5 deep well in the coming quarter, which are all being drilled to around 3,500m-4,200m a lot less shallower than the A8 Deep Well was drilled to so hopefully a bit less pressure/ heat to deal with re drilling fluid balance etc..
Will it be a hot July or sizzling August..........