RE: Is now the time to take a look at Hurricane Energy?5 Sep 2019 15:49
Lincoln Crestal was spudded on 12 July 2019 and has now reached total depth of 1,780 m TVDSS, including a 720 m horizontal section of fractured basement reservoir. Lincoln Crestal operations have now moved onto preparation for drill stem testing. A further update will be made following the completion of this stage
Dated 2nd SEPT doesn't read ambiguous to me.