RE: New Corporate Presentation17 Nov 2023 09:44
If I’m reading it correctly the FY24 guidance of 5850 tonnes of copper is for TOTAL copper produced, which is both cathode from oxide and sulphide concentrate (which I presume is CONTAINED copper) rather than tonnes of concentrate, I’d like to have that confirmed though.
The cobalt circuit has already been in operation and has produced export grade cobalt for the European market, it’s not currently in operation due to cobalt price.
The copper production will likely ramp up after the upgrade so I wouldn’t expect to see as much in Q3 as Q4.