Drilling programme22 Nov 2018 19:42
The new drilling campaign at Havieron, which commenced today, consists of up to ten core holes to a depth of 600 metres each for a total of approximately 6,000 metres. The drilling programme is designed to further determine the extent and direction of the high-grade zone of mineralisation at Havieron that was detected in Greatland's maiden drilling campaign conducted earlier this year.
The RNS of 17/9/18 states up to 10 holes to be drilled, so if it is taking two weeks to drill some of these holes then we will not finish by the 10th December. I feel we may have more holes drilled than what we think.