Points I noted from the recent presentation:
• Gas analysis results in the next 2 weeks
• He3 isotope possibility is only a “curiosity” for PLSR; they may send samples to a university for specialist analysis.
• The additional wells will be drilled at Topaz.
• Drilling to start at the end of Sep 2026 – the aim is to establish the size of the resource to update the modelling. Updates to following each drill. If successful, I would suggest they will be used as producers.
• OBJECTIVE – move Topaz to a development ready stage by mid 2026.
• Plant production and commissioning timescale 12 – 18 months (my understanding is that this period begins after mid 2026)
• New lease area is not adjacent to existing leases – starts 35km to the west and extends to 150km to the west.
• The geology supports the possibility of hydrogen generation, but PLSR will be focussed on helium.
• Air drilling is deemed appropriate; changes are being made to improve the outcome and the approach to cleaning the well-bore was considered effective.
• JS2 – PLSR are reviewing why there are issues regarding flow.
• There is currently a moratorium on gas production in Minnesota, but it is anticipated that this will be resolved before production
Overall, my view is that PLSR has significant potential, but production may not occur until Q1 2028. Even with regular and hopefully positive news over the next 12 months will it be sufficient to lift the SP? Since the prospect of production seems to be a long way off, will the spectre of further raises further dampen enthusiasm?