RE: RNS Mike Buck8 Sep 2018 09:05
Sinopec told MATD that Snow Leopard-1 would take 70 days to drill. So lets go with that.
Spud was on 9th July, so 10th July was day 1 complete of drilling operations.
This makes yesterday (Friday) day 60 of drilling operations, and Mike Buck said in the RNS that drilling operations were ongoing, so they were still drilling.
If you put 60 days of drilling into the SL-1 diagram they would have been slap bang in the middle of the main target yesterday (allowing for some seismic correction of vertical depth). If they are slightly in advance of 70 days total drilling then they will be through the main target as of yesterday.
They do not have LWD (Logging While Drilling), the rig will drill the well to TD and then they will do wireline logging afterwards with a suite of logging tools.
Until the logging run is done (when drilling is completed) they are not in a position to clearly state if they have found anything of significance or not.
They can be encouraged during drilling (cuttings in the drilling mud returns have oil shows) but this is not enough on its own, the full suite of logging has to be done after the drilling operations are completed and only then, once logging is done and the results known, can the company update if anything has been found of any significance.
So, is there any significance of releasing the Half Year results with a Block XX update yesterday ? For any junior oil company with no production results time will also see the muppets home in on the loss (pretty impossible not to make a loss when you have no production) but its a normal time of share price falling as headline is always the loss. So were they cleaning out all the not so positive news ahead of Snow Leopard-1 news so there is no detracting from SL-1 results and then WH-1 drill ?
Given ongoing drilling, the potential for oil shows in the cuttings of the drilling mud and they are in the main target zone now...........one wonders if they have positive signs from the main target zone which made them confident enough to release their half year figures and XX ops update early and get it out of the way.
Interesting next two weeks. Really dont know when news will be. Drilling was ongoing when they wrote the RNS.......but it may have had 10 meters to go to TD, or 800 meters....who knows. Logging could start tomorrow, or next week, or next weekend.......or after the AGM......
Weather forecast is good for Mongolia this year, so far weather should be around average to slightly above average temperatures into mid November, which means they have a good 6 to 7 weeks from end of September, Wild Horse-1 is scheduled for 30 days to completion as the geology there is benign and depth is shallow compared to SL-1. So provided they rig up and spud WH-1 by the end of September they will easily complete well ahead of the end of the drilling season.
The pointers (timing of HY results/Block XX update) are suggesting that Mike Buck is indeed "Looking Forwar