The Jumbo Kinetic has gone into Jebel Ali which appears to me at least not to be an area where the Buoy might be stationed for pick up? Some distance away from where the AM is docked.
All the chemical plants (not metallurgical) in which I've been involved in commissioning (to saleable produced) have been done in a maximum of a few weeks. Obviously optimum performance and recovery would be ongoing.
They haven'y proposed any changes to the schedule yet so we're still on for end of December production The plant construction may overrun but there should be scope to reduce the commissioning stage to allow full production before the end of the year. 3 months commissioning always seemed a bit excessive.
Big changes to the plant will obviously necessitate more funding. The upshot is that we'll be further diluted or JLP will take a bigger share of Kabwe.
We don't need conspirators the company are quite capable of blowing themselves out of the water. Still doubts about relisting, of raising capital and even the project actually going ahead if the ZG don't like the new timelines or JLP the costings.
Thought JLP has had 5 months to do this basic project groundwork, process evaluation and costing, why another months delay?
BMR's RNS downbeat compared to JLP's.
'I don't crow about my utterly superb timing which meant I bought in at below 2p'
From that famous scene from Pretty Woman as said by Vivienne (Julia Roberts)
'You just did'!