RE: Close to 'Shovel Ready'28 Jan 2023 11:21
Hi MJA, That's pretty much along they lines I was thinking as well. I believe that Enviroo are looking to take Plots 10A, 11 and 12 as well as Plot 13 with obtained planning permission in April 2021, and I'm sure I saw an indication somewhere that they had got agreement with Peel on those sites. As Plot 13 (Enviroo) and Plot 10B (Peel/PHE) are at a similar stage i.e. having obtained planning consent, and given the operational connection between the two, I expect that the two sites could be developed at the same time, and hopefully that will be sometime this year. Start of construction about mid-year perhaps?