RE: 230Mev4 Feb 2019 20:58
goespartners, 10 Oct 2018 https://tinyurl.com/y74k9kuy
"AVOβs beam technology is currently being worked on by the team at ADAM, a spin-off from renowned Swiss physics lab CERN, which includes some of the world leading physicists.
The firm recently announced that it had successfully integrated the four sections of its LIGHT proton accelerator, the proton source, the Radiofrequency Quadrupole (RFQ), four Side Coupled Drift Tube Linacs (SCDTLs), and two high-energy accelerating structures, the Coupled Cavity Linacs (CCLs), at the lab and had achieved an energy of 52 mega-electron volts (MeV), double the amount needed to treat superficial cancer tumours.
READ: Advanced Oncotherapy rockets as it improves performance of LIGHT cancer treatment system
However, the company isnβt stopping and is aiming to add 13 more CCL modules which would increase the energy level to 230MeV, the level required to treat deep-seated tumours.
goetzpartners expects the company to achieve this energy level in 2019, adding that they saw βlimitedβ risks to the set up of the companyβs LIGHT system for its first customer at a clinic in Harley Street, the renowned private medical district in London"
Nicolas Serandour, July 2018: (https://tinyurl.com/y8bad9rj)
"Discussions with potential customers are now multiplying and we expect them to accelerate as we are getting closer to the next phases of our journey. We look forward to having all our accelerating units manufactured to generate a beam at full energy by the middle of next year and start the installation of the system in Harley Street when the building is ready by mid next year.β
RNS 5671D 10 October 2018
"AVO will add 13 further Coupled Cavity Linacs ("CCL") to arrive at the final required energy level of 250 MeV, which we expected in H1/2019E."
RNS 4752D 10/10/18
"We look forward to having all our accelerating units manufactured to generate a beam at full energy by the middle of next year "
Not seeing anything to suggest 230MeV was expected by Q4 2018. End of H1 2019 is the published date for full energy generation. Can I ask where the end of 2018 came from?